FILTERS
corrigendum : strengthening work from km 115.670 to km 133.936 length 18.266km and specialized slope protection works at km 133.94 and km 150.737 on changlang-khonsa road section of nh 215 under khonsa highway division in the state of arunachal pradesh
View Insights
wbpwd/pw(r)/sepd/piu-i/nit-22 of 2026-2027_sl_1 - alipurduar - volka road from 0.00 kmp to 21.25 km for widening and strengthening work, under alipurduar division p.w.d. in the district of alipurduar under ridf-xxxii.
corrigendum : widening to 4l ps configuration from km 6.600 to 16.300 of the khamgaon to shegaon section of n h 548c in the state of maharashtra on epc mode
nhidcl/ro/stmc/pani kgt/26-27/782 - sr, er work and road safety measures through stmc on nh-08 between old ch 318 panitila to old ch 343 east kanchanbari total length 21.94 km in tripura in fy 2026-27 on percentage basis and work order basis
construction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.
corrigendum : strengthening and overlay at various stretches of 4 lane bamanbore to garamore section (km 182.600 to km 254.537) of nh-27 in the state of gujarat under tot project at the risk and cost of existing concessionaire
corrigendum : balance work of umaria shahdol 2-lane with paved shoulder road project in the state of madhya pradesh
construction of platform wall, surface, retaining wall, boundary wall, service roads, signal building, halt station building, p. p. shelters & other misc. works between kaptanganj (excl.) to paniyahawa (incl.) in connection with gorakhpur cantt. - valmikinagar doubling project.
construction of 2- lane road over bridges (rob) including approaches in lieu of lc no.177 in barabanki station yard at km 1067.590 on lucknow -ayodhya section in lucknow division on northern railway under dy. ce/c-iv/lko.
corrigendum : performance based maintenance contract pbmc work from km 34.00 to km 56.00 km 64.00 to km 80.00 km 94.500 to km 111.710 of nh 117 new nh 12 except karanjali jorapole and kalnagini bridge in the district of south 24 parganas west bengal job no nh12 ol
corrigendum : balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km
wbpwd/pw(r)/sepd/piu-i/nit-17 of 2026-2027_sl_1 - gangajalghati - saltora road from ch. 0.00 km to ch. 22.00 km., widening and strengthening work including construction of 15 nos. cross drainage structure and allied work under bankura highway division in the district of bankura.
corrigendum : construction of asphalt road improvements to road from mahatma nagar to motiwala college nashik
construction of tamnar bypass (four lane) road, length 8.50 km, district raigarh.
development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
widening of service road from km. 265.500 to km. 279.750 on four lane raipur-aurang section from km.239.000 to km. 282.000 of nh-6 (new nh-53) as bot (toll) on dbfot pattern under nhdp iv on epc mode
corrigendum : upgradation of road (fmn, pmt and surface) khangral - sanjak from cl-9 to nhdl specifications from km 0.00 to km 10.00 by project vijayak, bro in ut of ladakh under crif funding
corrigendum : construction of perimeter roads on both sides of emergency landing facilities (elf) including atc plinth (50m x 50m) on chilakaluripeta nellore section of nh16 from km. 1210.000 to km. 1214.600 in andhra pradesh on epc mode
additional work for completion of devgarh madariya - nathdwara gc section including protection works, rob/rub approaches, platforms, platform shelters,rub covering shed, circulating area, drain, retaining wall, quarter works and other ancillary works connection with devgarh madariya - nathdwara gauge conversion project under ajmer division of north western railway.
development works including construction of asphalt roads (18m, 12m, 9m & 7.5 m wide), rcc drains, culverts, sinking of borewell with pump installation and hdpe rising main, construction of 10 ll oht & 5 ll sump with pump house, layout electricficaton, compound wall, and footpath for dr. qamar-ul-islam residential project ( 50-50 sharing porject ) at hagaraga village in kalaburagi taluku & district.
widening and strengthening of the remaining section of the utraula-pachpedwa-chandanpur road from km 17.700 to 38.850 (including 5-year maintenance).
corrigendum : jambutake industrial area.. permanent water supply scheme and provision of infrastructure facilities.. construction of jackwell, approach road, approach bridge, 1.50 mld capacity water treatment plant (wtp), 300 cum elevated service reservoir (esr), 1000 cum sump, and provision of pumping machinery for water.
corrigendum : develop.of 6l uer2 nh 344 m nh1 km0.700 to dwarka sec24 road km38.111 in delhi n 4l rs nh344 n nh344 m delhi at km26.135 of nh344 m uerii till bhd byp of nh10 near bhd in hr pkgi 2 3 nh344m n 5 nh344n 2 call works at rnc of epc contractor.
working survey, soil investigation, design, build & operate(with trial run of 3 months) contract for providing, supplying, lowering, laying & jointing rising main, gravity main and distribution pipeline, supply, installation, testing & commissioning of hscf/multistage pump with associated mechanical and electrical equipments, instruments & accessories, clear water sump, pump house, staff quarter, compound wall, approach road (r.c.c) at various hw/shw/village for 174 villages of missing link of kaprada & dharampur with 05 years of comprehensive o&m of entire scope of work. dist.: valsad
corrigendum : strengthening of pavement including improvement of road safety costruction of retaining wall breast wall and thrie beams crash barriers etc in km 156507 to 208705 on nh 05 in the state of himachal pradesh on epc mode
wbpwd/pw(r)/sepd/piu-i/nit-24 of 2026-2027_sl_1 - keshiary to nayagram rd 0.00to11.57km (sh -9)for strengthening and widening (from carriageway width 5.5to10.0m -2 lanewith pavedshoulder) reconst. of 16 nos cd structures, 265mprotective work - 765mdrainwork under jhargram div,pwd, dist of jhargram.
construction of road works under financial incentive grant under pmgsy (2026-27).
corrigendum : construction of a new 2lps rob alongside the existing 2 lane rob at km 128.400 including construction of a vehicular underpass at km 129/200 and flyover at km 130.220 on nh61 in the state of maharashtra on epc mode
resurfacing of naswadi - bhakha - kwant road (mdr), km. 0/000 to 38/100 ta. kwant / naswadi dist. chhotaudepur
corrigendum : landslide treatment work from km. 18.150 to km. 18.560 (1 location) on garjiya (ghughtidhar) betalghat-khairna- odakhan-bhateliya-muketshwar motor road (sh 62) in district nainital under epc mode.
balance work of rehabilitation and upgradation of the bhokardan hasnabad jawakheda section from km 0.630 to 950, km 4.797.5 to 456, km 5.586.6 to 100, km 6.452.920 of nh753m, km 20.765 to 957, jawakheda to rajur section from km 22.700 to 985, km 23.
development works including construction of asphalt roads (18m, 12m & 9m wide), rcc drains, culverts, sinking of borewell with pump installation and hdpe rising main, construction of 10 ll oht & 5 ll sump with pump house, layout electrification, compound wall, footpath & construction of 1.0 mld stp at kusnoor village in kalaburagi taluka & kalaburagi district
corrigendum : strengthening of medpalli to laheri section from km 18.600 to km 82.00 excluding major and minor bridges of nh130d in the state of maharashtra on epc mode total length 63.40 km
construction of r.o.b in lieu of lc.no.485 -balance left over works on railway portion - superstructure of span no.1 as 1x 25.00 m c/c psc 'i' girder with deck slab, span 2 composite girder with steel 'i' girders with deck slab completed + span 3 to 5 as 3 x 31.00 m c/c psc 'i' girder with deck slab, construction of one left over pier with bed block and construction of approaches (r&b portion) - 6 x 30.0m psc girders on chowdavaram side, 6 x 30.0 m psc girders on visakhapatnam side with re wall on both sides and other miscellaneous works in lieu of lc no.485 (laxmi devi peta gate) at km.745/16-18 between bayyavaram and anakapalli stations at anakapalli yard.
strengthening of the road from bandgacha to fatepur under raina-i raina-ii and jamalpur block in the district of purba bardhaman
strengthening of the road from bandgacha to fatepur under raina-i, raina-ii & jamalpur block in the district of purba bardhaman: 42.900 km..
strengthening of the road from bandgacha to fatepur under raina-i, raina-ii & jamalpur block in the district of purba bardhaman
nhidcl/manipur/ 2025/civil/i-m-c/nh-02/ - balance work of strengthening of churachandpur to imphal section of old nh-150 (new nh-02) from churachandpur police station (km 402.000) to malom oil depot gate (km 454.798) in the state of manipur on epc mode under nh(o)-ne (length-53.400 km)
balance work of strengthening of churachandpur to imphal section of old nh-150 (new nh-02) from churachandpur police station (km 402+000) to malom oil depot gate (km 454+798) in the state of manipur on epc mode under nh(o)-ne (length-53.400 km)
wbpwd/pw(r)/sepd/piu-i/nit-18 of 2026-2027_sl_1 - karimpur-natidanga-nazirpur road widening and strengthening work from 0.00 kmp. to 21.330 kmp. under nadia division, p.w.dte. in the district of nadia, west bengal.
corrigendum : balance work of widening and strengthening of nh 353c from km 227.00 to 243.00 total 16.00 km chodampalli to guddiguddam section of sakoli wadsa armori gadchiroli ashti allapalli sironcha road in gadchiroli district in the state of maharashtra on epc
corrigendum : performance base maintenance contract (pbmc) of mp border chilpi to kawardha section from km 0.000 to 50.878 of nh-30 (old nh-12a) in the state of chhattisgarh.
improvement such as widening and strengthening of road from gumma to sirigumma from 0/00 to 14/350 km in the district of rayagada for the year 2026-27
wbpwd/pw(r)/sepd/piu-i/nit-19 of 2026-2027_sl_1 - bansa-ii rd(sh-4)from 0.00 kmp to14.08km, widening (carriageway from 5.50m to 7.00 m)and strengthening works including const.of 08nos. of cd structures, 3230m protective work and 235m drainage work under bankura division, pwdte in the dist of bankura
as/nh37/jor/vup-sskp/26-27/1 - construction of vehicular under pass and its approaches along with service road from km 442.700 to km 443.700 of nh-37 (old) near swargadeo chaolun siu-ka-pha swamanway kshetra in the state of assam under epc mode
corrigendum : landslide treatment work from km. 9.070 to km. 9.250 (1 location, jajred) on kalsi chakrata motor road (sh-20) in district dehradun under epc mode.
corrigendum : construction of road from km 0.000 to km 32.31 on jiribam to manipur mizoram border section via tipaimukh under isc scheme in manipur
corrigendum : overlay with sma from village bhamaiya ch.780.920 to village baletia 803.420 (design ch. 328.500 to ch. 351.000) section of dve (nh-148n) in the state of gujarat (package-29) at risk and cost of contractor on single percentage item rate basis
improvement such as widening and strengthening of khaprakhol to juria road ch.0/000km to 19/500km in the district of balangir for the year 2026-27