FILTERS
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house, staff quarter, compound wall, supplying and erecting pumping machinery including all electro-mechnical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (rhs) for industries (gidc) and rural areas of bharuch and vadodara districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch
View Insights
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house with panel room, staff quarter, compound wall, office building, supplying and erecting pumping machinery including all electro-mechanical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (lhs) for industries (gidc) and rural areas of bharuch and surat districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch & surat
electro-mechanical works of 2x36 mw tiuni plasu hep which includes detailed design, engineering, manufacture, quality assurance, quality control, shop assembly, shop testing, supply, transportation, insurance till commissioning, delivery at site, site storage & preservation, erection, testing and commissioning, performance testing, field acceptance testing, training of employers personnel, handing over and fulfilment of guarantee for the electromechanical plant, on epc (engineering, procurement & construction) basis
custom bid for services - selection of service provider for establishment of integrated command control centre at lucknow and operation & management includes conducting diagnostic tests, procurement & supply of medical and non medical consumables, ..
corrigendum : supply of - desktop computer oscb , a4 and legal size multifunction printer (mfp) , video conferencing camera web camera (v2) , line interactive ups with avr (v2) , l 1 fingerprint registered device scanners for bio - metric authentication (uidai) (v2) - | quantity - 13540
corrigendum : replacement /retro-fitment of ecs system at 5 stations of ph-i line -2 of dmrc network.
operation and maintenance of lift canal system of upper indravati project in the district of kalahandi comprising all electro mechanical instrumentation equipment installed in pump house, mcc room including pumps and motors, switchyard , transmis - operation and maintenance of u.i lift canal system
part i: fixed operation of piped water supply schemes (pws, wls (quality affected/nq) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of water supply schemes (pws, wls quality affected/nq ) & pws i/c the cost of chemicals, overhauling of filter media and related apputenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in districbuition line, repair and provision of new fhtcs, repair amd maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 13 no. of schemes: 425 nos. wls(non quality): 334 nos., wls (quality):- 83 nos., pws:- 8 nos.
comprehensive operation and maintenance of surface water based cheriya bariyarpur multi village pipe water supply scheme of capacity 5.65 mld including supply of manpower, maintenance of infrastructure and mechanical parts, maintenance of fhtc, scada and electricity payment of electro mechanical parts including building, lighting and other accessories of wtp based on actual consumption of electricity. covering 70 wards under five panchayat (sripur, khajapur, pabra, bariyarpur, sahpur) of cheriya bariyarpur block under p.h.division, teghr a in district begusarai for five years. salient features of cheriya bariyarpur mvs:- 1. source river gandak a. intake well (6.73 mld) b. gangway 2. water treatment plant (5.65 mld) a. pre settling tank - 2nos b. pst pump house - 1 nos c. cascade aerator 1 nos. d. flash mixer 1 nos. e. clarifloculutor-1 nos. f. filter house - 1nos. g. clear water reservoir (800 cum) & pump house- 1 nos. h. backwash sump-1 nos. 1. centrifuge building j. chemical house k. staff quarter l. mesr (750 kl) staging-26 mtr and five zonal esr (175 kl-470kl with (12 meter-17 meter) stagging m. boundry wall n. rising main -11634 mtr. o. distribution main-72150 mtr. p. total pump capacity-235.5 kw(approx) q. total no. of house connection-12343 no.
augmentation up-gradation of electromechanical equipments along with allied works at 17.08 mld stp brari-numbal
rmo specialized electrical and mechanical services of delhi high court, new delhi. - (sh comprehensive maintenance and operation of multi level under ground automated car parking along with associated electrical and mechanical services installed at delhi high court, sher shah suri marg, new delhi).
supply of - work station , cabin table for hod room , cabin table for associate professor , cabin table for staff room , work table , high back chair , mid back chair , high bak chair 2 , visitor chair , demonstration chair with tablet for demo room , 3 seater waiting chair , meeting table 16 seater , meeting room chair , single bed for duty room , single bed mattress , three seater sofa , two seater sofa , center table , corner table , 4-seater dining table , dining chair , steel almirah , metal open rack , steel almirah with glass shutter , 4 drawer locker , wooden storage , stainless steel dustbin , dustbin large 100 liter , wooden podium , white board , pinup fabric board , notice board with front cover , key box with 50 keys hooks , examination couch , dressing trolley with bowl and bucket , crash cart , wheel chair , mayo trolley , stretcher trolley , stretcher trolley with oxygen gas cylinder , double x-ray view box , emergency trolley , kick bucket , u pattern sliding curtain facility for patient , stainless steel top stool , 3 fold patient screen - hospital item | quantity - 5261
construction of swimming pool including sitc of electrical and mechanical systems at indian maritime university, willingdon island, kochi, kerala
corrigendum : work contract for routine/preventive/breakdown maintenance of control and instrumentation equipment and its associated system including annual overhauling (aoh) work of same of sstpp, stage-ii i.e. 2x660mw, unit 3 and 4, dongalia.
construction of electric crematorium with all civil work, twin bed electric crematorium and allied works at satighat , jl no.05, suri block i birbhum
construction of electric crematorium with all civil work, twin-bed electric crematorium & allied works with 3-months trial run & thereafter 5 years operation & maintenance at satighat plot no. 1130/3504, jl no.05, suri block-i birbhum including all components.
corrigendum : selection of epc turnkey contractor for sitc of 01 no. 25/30 mva (onan/onaf), 132/33 kv power transformer with nifps, associated civil works, control and protection system and allied works at bhaklai phase-iii narmada water supply project second cal
providing operation and maintenance services at united india insurance corporation limited, whites road, chennai - annual operation and maintenance of civil installation, electrical installation, specialized e and m equipment such as hvac, stack parking system, fire fighting, fire alarm, dg set, solar system, lifts, horticulture and landscaping works, housekeepin
e.l.d.c no. sm ii /p3/2392/ 2026 comprehensive annual maintenance contract for 7000 units of remote group control and monitoring of street light controller system for a 2-year period in zones i to xv - comprehensive annual maintenance contract for 7000 units of remote group control and monitoring of street light controller system for a 2-year period in zones i to xv
supply, installation, testing & commissioning of conference system including interpretation system, sound reinforcement system and automatic camera control system at main committee room, parliament house annexe, new delhi subwork/packages: supply, installation, testing & commissioning of conference system including interpretation system, sound reinforcement system and automatic camera control system at main committee room, parliament house annexe, new delhi
supply of - entry and mid level desktop computer (q2) , entry and mid level laptop - notebook (q2) , line interactive ups with avr (v2) (q2) - | quantity - 730
corrigendum : human electrical crematorium in chinaur, shahjahanpur city under state smart city mission.
supply, erection and commissioning of electro-mechanical drive of apron feeder no.3 at chp-500mw at bhusawal tps.
upgradation of existing pro-control p13 ddc/dcs system at gtps, procurement, installation and commissioning of two nos. vacuum pump with replacement of existing steam jet ejectors at gtps, desilting/cleaning of raw water reservoir compartment no 1 and compartment no2 at pps-iii, bawana, biennial rate contract for the maintenance of electrical system at pps-i, supply installation (retrofitting), testing and commissioning of air circuit along with auto changeover/interlocking scheme of the sa-2 lt (415v) panel board at gtps, delhi
corrigendum : supply, installation, testing,commissioning of 5 mp bullet camera , supply, installation, testing, commissioning of 5mp ptz camera , sitc of windows server must support required cameras as per locations , sitc of video management software including analytics and support 36 cameras, expandable as per requirment , sitc of video management software including analytics and support 30 cameras, expandable as per requirment , sitc of video management software including analytics and support 20 cameras, expandable as per requirment , sitc of video management software including analytics and support 15 cameras, expandable as per requirment , sitc of 18 tb hdd surveillance hdd , sitc of 24 port l3 poe switch 370w with 4 sfp port loaded with 1g sfp module , sitc of 8 port poe switch with 2 sfp port loaded with 1g sfp module , sitc of 15 u indoor rack withpdu and fan and required trays , sitc of 9u indoor rack withpdu and fan and required trays , sitc of 9u outdoor rack ip 54 rated pdu and fan and required trays , supply laying and installation cat6 utp mtr with pvc conduit or casing caping patti , supply laying and installation armourd cat6 cable , supply laying and installation 12 core sm armoured fiber cable with suitable hdpe pipe , sc-lc patch core 3 mtr sm fiber , spicing per core , sitc of 12 port fully loaded liu with pigtel and adaptor , supply, laying and installation 2.5 sqmm armourd cable mtr power cable , sitc of 1kv ips with inbuilt batteries , sitc of 3kv ups with 12v 42ah x8 batteries, connecting cables and stand , sitc of 6kv ups with 12v 42ah x16 batteries, connecting cables and stand , sitc of gi hot dip 6 mtr pole with cantilever, lighting arrestor, foundation should be as per seashore winds , sitc of 55 inch tv 4k 24x7 , sitc of 32 inch tv 4k 24x7 , sitc of hdmi and mouse tx rx set , sitc of workstation with 21 inch, 4k monitor , soft digging , hard digging , sitc of security sinage , comprehensive annual maintenance contract and onsite support for two years after 1 year warranty period. - boq item pub bfc | quantity - 14654
comprehensive asset management of traction control system of hhp locos including capital equipment rehabilitation for hhp locos.
supply, installation, testing, commissioning, comprehensive maintenance and operation for 05 years of electromechanical equipment and allied works for pumping arrangement for water supply system at various sites package-03 under pmay in indore 3rd call
comprehensive annual maintenance contract of voith hydrodynamics transmission and control system of sparme/tata for three years with oem m/s san engineering & locomotives, -bangalore through single tender basis.
comprehensive asset management of traction control system (igbt based tcc & lcc of ac-ac tcs) of emd make hhp locos capital equipment rehabilitation of abr shed for a period of 01 years.
corrigendum : daily operating run p.n.g. cremator machine, weight scrubber and traditional stove (majiwada) in thane municipal corporation jurisdiction by using 3 workers (minimum wages per day levi) for the period of five years
state plan-2023-24-energy efficiency improvement, optimisation of electromechanical items, safety audit and ensuring safety in the operation of wtps and pumphouseswss to anjarakandy, perlassery and adjoining pts- supply and erection of vt pump set at
supply of - all in one pc (v2) (q2) , a4 and legal size multifunction printer (mfp) (q2) , line interactive ups with avr (v2) (q2) - | quantity - 290
corrigendum : supply of - high end desktop computer (q2) , high end laptop - notebook (q2) , line interactive ups with avr (v2) (q2) , a4 and legal size multifunction printer (mfp) (q2) , scanner (v3) (q2) - | quantity - 208
supply of - 1ru router , l3access switches poe , 1000 base lx transceivers lc connector sm , tri-band access point , wlc controller support , utp cable cat 6 , 24 port patch panel cat 6 , information outlets cat 6 , face plate dual port , patch cord cat 6 , optical fiber patch cord , wire managerpatch chord minder panel , supply of gang box , 19 rackfloor standing , pvc conduit , utp cat 6a or cat 6 cable or stp cable , installation termination of information outlets , installation termination of utp cables , performance testing of the laid utp cat 6 cat 6a stp cable , jack panel with cable manager , gang box with faceplate , floor mount rack 42u with all accessories , installation of pvc conduit of od , 6kva online ups with battery for noc rack , access switches poe , faceplate dual port , gang box , pvc conduit of od , laying of utp cat 6a cat 6 cable stp cable , pvc conduit of od size permeter 32 mm , technical support - procurement of network and server room equipment | quantity - 2261
supply of portable emergency led lighting tower system with battery bank, lead acid storage batteries for motor vehicles with light weight and high cranking performance (v2) conforming to is 14257, passbook or bankbook printer, cricket bat (v2) conforming to is 828, bhatia battery of performance intelligence test (v2), revolving chair (v5), automated mortar fire direction controller (amfdc) as per mha qrs, correspondence envelopes (v3) conforming to is 13892, offset printing ink (v2), wired headphones, earphones and communication headsets quantity - 12
comprehensive maintenance of sensitive e/m equipments and installations of ncn data centre at nrs thane, repair/ maint of central ac plant, fire fighting, water supply and lift at asrs wed, mankhurd under cwe (subs) mumbai
providing, splicing, installing, testing and commissioning of scada based gate operation, monitoring and control system e-ding o&m and non-comprehensive annual maintenance contract (amc) at bhadar irrigation project
repair jobs in twin table cars, rail changing, mom, l&t stands, radialpart, dummy bar conveyors, gas cutting machines(gcm) etc. and other equipments of cc machines in ccd/sms-1: 1. twin table car rail track repair/replacement: dismantling of damaged rail, repair of pedestal supports, erection of new rail, and alignment of rail w.r.t. existing rail, welding of joints. 2. twin table car mast dismantling, repair/replacement: dismantling, fabrication, erection of mast. dismantling of damaged mast, removal of damaged portion of mast, fabrication, welding of support and bracing pipes, erection of mast, adjustment of tie rod. 3. twin table car current collector dismantling, repair/erection: fabrication and erection of current collector. dismantling of damaged current collector, fabrication of current collector frame, removal and reconditioning of guide rollers, fixing of guide rollers, erection of current collector, and connection of mast. 4. twin table car wheel changing: dismantling of drive gear box and wheel, fixing of new wheel assembly, erection of drive gear box in case of drive wheel changing, lubrication of the wheel. 5. twin table car lt/ct drives repair/re-conditioning: dismantling of lt/ct gear boxes, changing of internals, re-conditioning/changing of couplings. 6. twin table car rollers bearing/bush changing/re-conditioning: removal of damaged bearings, fixing of bush/bearing rollers, fixing of bearing covers. 7. twin table car apron plate repair/replacement: removal of damaged apron plates, fixing of plates/repair of plates. 8. twin table cart: removal of rollers along with bearing housing, erection of new rollers along with bearing housing, alignment of roller coupling, alignment of drive gear boxes w.r.t bevel gear boxes, alignment of rollers w.r.t machine roller tables and hfl roller tables. 9. radial part: repositioning of tk stand in position, alignment and bolt tightening. 10. spindle fixing and spindle pad changing: fixing of spindle, locking the spindle in position, change of spindle pads if required. 11. radial part: checking of radial alignment with template and rectification. 12. radial part - repair/repositioning/replacement of tk tie rod: repositioning of dislocated tie-rod/removal of damaged tie-rod and fixing of tie-rod and locking. 13. tk stand base repair in ccms: removal of damaged base plate, preparation of base, preparation of new base plate. fixing the new base plate and welding the base plate complete. 14. tk1 guide repair in ccms: removal of damaged guide. preparation of guide plate as per curvature. fixing the new guide plate and welding the guide plate complete. 15. mom "c" frame repair in ccm#2: setting pads changing, setting pads shims changing, mould adjustment jacking plates changing, mould location plates changing, swing bolts changing, tee bolt changing, water leak arresting, any welding/cutting works on c frame, all bolts tightening. 16. ccm#2 radius correction: assembling of 12mt template, checking of radial alignment with template and rectification of strand. checking of template with master template. dismantling of template and put the template in designated place roller tables. 17. mom c frame leveling: checking of mom c frame leveling with straight edge and rectification. 18. repair/change of idle roller stands (small) in gega gas-cutting machines: removal of damaged idle roller assembly, reconditioning of bearing blocks, greasing, fixing back of idle roller assemblies. 19. repair of water cooled beams in gcms: fabrication/repair of damaged portion of water-cooled beams, cleaning/changing of chocked portions of water-cooled beams, flushing of beams, water testing of beams. 20. repair of idle roller stands (big) in gcms: dismantling of bearing blocks of idle roller stands, repair/change/rotation of roller as per requirement, assembly of bearing blocks, greasing and alignment. 21. change of idle roller stands (big) in gcms: dismantling of idle roller stand assembly, cleaning of foundation by gas-cutting and lancing, erection of new idle roller stand, connection of grease and water lines, alignment with assembling of 12mt. template, checking of radial alignment with template and rectification of strand. 22. fabrication/repair/change of lt strikers: dismantling of damaged lt striker, fabrication/repair of striker as per requirement, testing of striker and adjustment. 23. repair/replacement of pipelines-dn-15: isolation of pipelines from gases, purging of pipelines with inert gas, repair/fabrication of damaged pipelines of all gases, flushing of repaired pipelines, testing for leakages and opening of isolation valves. 24. repair/replacement of pipelines-dn-20: isolation of pipelines from gases, purging of pipelines with inert gas, repair/fabrication of damaged pipelines of all gases, flushing of repaired pipelines, testing for leakages and opening of isolation valves. 25. repair/replacement of pipelines-dn-25: isolation of pipelines from gases, purging of pipelines with inert gas, repair/fabrication of damaged pipelines of all gases, flushing of repaired pipelines, testing for leakages and opening of isolation valves. 26. tundish heating gear box repairs: dismantling, repair/bearing changing re-fixing of gearbox. 27. tundish heating system tie rod fixing/repairs: repair of tie-rod, welding of crank bush and connection to gearbox. 28. tundish car copy roller guide repairs: repair/fabrication and welding of copy roller guides. 29. tundish car hump repairs: dismantling and repositioning/re-conditioning of tundish car humps. 30. mould table top: cleaning of mould table top of mould oscillating mechanism (mom) from metal jam by gas cutting. replacing the damaged mould fixing bolts, mould adjustment bolts and eye bolts. 31. jam cleaning below mom: removing the bunker plate below the oscillating table and cleaning the metal jams below the mould table and oscillating lever. fixing back the plate after cleaning and ensuring that the oscillation is smooth. 32. dismantling, repair, reconditioning, erection of mom c-frame: dismantling of mom top link, arresting of counter weight link, dismantling of c-frame, repair of c-frame, dismantling of c-frame water connections, re-conditioning/replacement of bottom link shaft, fixing of c-frame, fixing of top link, connection of water lines and alignment of cframe with respect to level and machine axis using mould and section ethelons. 33. repair, alignment of c-frames w.r.t. sections: checking of mould c-frame with respect to axis of the strand, rectification of location of mould bed bolts blocks, straightening of c-frame arms, leveling of c-frame with respect to machine radius, arresting of water leakages. 34. dismantling, repair, erection of scz water seat block: dismantling of scz water seat block and removal of metal jam, repair of the block, removal of ms pipelines/joints if any and replacement with ss pipelines/joints, fixing of water seat block. 35. repair jobs on mom drive gear box: reconditioning of mom drive gear box including change of internals. alignment of drive frame with spirit level and master level. 36. repair jobs on eccentric unit: eccentric tie rod adjustment for smooth oscillation of the mechanism. adjustment of counter weights. 37. change of mom eccentric unit: dismantling of defective eccentric unit, fixing of reconditioned/repaired eccentric unit and adjustment of oscillation. 38. change of mom top link: arresting of mould c-frame, dismantling of mom top link, fixing of new top link, leveling of c-frame with respect to machine radius. 39. quarterly repair/rectification jobs on l&t stand: cleaning of all weld joints of turret area, checking of housing top flange bolts for looseness and measurement of gap with feeler gauge in presence of site engineer, cleaning of drive gear box area, checking of drive gear box flange bolts surface for any gap with feeler gauge, thorough cleaning of axle retaining covers of top and bottom links and measurement of clearances, rectifications as suggested by the engineer. 40. change of drive gear box of l&t stand: dismantling of drive room, dismantling of drive motor frames and motors, dismantling of gearbox, erection and alignment of drive motors and frames, erection of drive gearbox, erection of drive room and welding. 41. half yearly repair/rectification jobs on l&t stand: removal of floor covers, cleaning of all weld joints thoroughly for dp test, providing assistance for dp test as instructed by the engineer, rectification of defects noticed in dp test. 42. annual repair/rectification jobs on l&t stand: dismantling of floor covers, thorough cleaning of all weld joints of l&t stand, providing assistance for dp test, rectification of defects noticed in dp test, load test of l&t stand, measurement of deflection readings as per the instructions of the engineer, measurements of clearances of column foundation bolts, thermal tightening of column foundation bolts as per the instructions of the engineer, fixing of floor covers. 43. repair/change of l&t drive room: dismantling of drive room structures, fabrication/repair of drive room structures, erection, alignment and welding of drive room structures. 44. replacement of seals of l&t rotary joint: dismantling of rotary joint, dismantling of seals, thorough cleaning, reconditioning/repair of rotary joint, fixing of seals as per the sequence and as suggested by the site engineer. 45. repair of dummy bar conveyers: maintenance of all 24 dummy bar conveyors of ccm-1 to ccm-6 by carrying out the following jobs to keep the conveyors in working condition, replacing damaged conveyors along with parking rollers, grip assembly, replacing the damaged rope, repairing the hook carriage, rectification of front and back guides, channels of conveyor. repair of horizontal guides and other structural repair of conveyor, reposition of conveyor carriage assembly in support guides in case of any problem, removing the dummy bar if it is defective or for carrying out the repair of conveyor, repair/replacement of vertical guide channels, fabrication of small parts like hook carriage tie rod, stopper etc. 46. mom lever unit bearing changing: jobs including boq no 32 and boq no 33 removal of counter weights, mom lever unit bearing changing on both sides by removing plumber blocks and fixing the same along with counter weights. also oscillation checking and rectification. 47. tk1/tk spline welding: tk1/tk stands igb spline housing and welding both in position and removed stands if required. 48. igb changing for tk stand: igb removal from the stand and fixing, orientation changing of igb if required. 49. igb locking: tk1/tk stands igb locking with bracket along with spline welding to stand. 50. idle roller stand roller changing: removal of damaged roller, cleaning, new roller fixing. 51. ccm#2 mould supporting frame top link changing/revisioning: removal of top link, revision/changing of bearings in the top link, fixing of top link in the position. 52. ccm#2 mould supporting frame bottom shaft bearing changing/revisioning: removal of top link, mould c-frame, revisioning/changing of bearings/shaft, fixing of shafts, c-frame and top link. 53. total changing/revisioning of ccm#2 mould supporting frame: removal of mould c-frame, changing/revisioning of mould water seats, arresting water leakages from frame, revisioning of leveling pads, fixing of revisioned or spare stand. 54. total changing/revisioning of ccm#2 section supporting roller: removal of damaged supporting roller, fixing of spare/revisioned supporting roller. 55. total checking of ccm#2 alignment with section and mould ethelon: placement of mould ethelon, placement of section ethelon, checking the total radius with template from mould c-frame to n1, removal of both section and mould ethelon, radius correction to be done. 56. periodical maintenance of electric hoist in mom room of ccm: strictly follow the periodical maintenance schedule, gear box oil top-up, greasing of guide and guide wheels, tightening of foundation bolts.
operation and maintenance power house power plant - arc for online chemical treatment of condenser cooling water system of u1to6 mtps
comprehensive asset management of traction control system of hhp locos including capital equipment rehabilitation for 12 number hhp locos. (make: medha) of diesel loco shed-raipur through oem for one year on single tender basis. qty:12 locos.
construction of electric crematorium including civil works, internal and external electrification, and supply and installation of crematorium machine. (second call)
supply of - plc cpu module vr 5.0-2014-part no.-e020000010 , d i-p input module-part no.-e200000026 , d o-p output module-part no.-e200000027 , communication interface module type-2-part no.-e200000221 , back panel 14 slot for plc-part no.-mbsspisp14xx , gravimetric filling controller-part no.-e160000039 , psu for plc-part no.-e070000022 , psu for solenoids- part no.-e070000009 , psu for i-o put module-part no.- e070000003 , load cell 10vdc 125klb.cap-part no.- mae016b2b30b - spares for rls | quantity - 66
se(e/m)-i /t-01 of 2026-27 - round the clock operation, maintenance and guarding of electro-mechanical equipment at clear water pumping station (ph-i), sub-station and yard lighting etc. including maintenance of staff quarters adjacent to cwps under 30 mgd bkwtp for 3y and 1m
round the clock operation, maintenance & guarding of electro-mechanical equipment at clear water pumping station (ph-i), sub-station and yard lighting etc. including maintenance of staff quarters adjacent to cwps under 30 mgd bkwtp for three (03) years one (01) month. (462)
supply of - stappler pin 10 no , stamp pad blue big size , stamp,pad blue small size , stamp pad ink blue , ration,vitran panjika 44 no , register 504 page , jindal,stock book 78 number 700 page , gang book 100,page , pi register , hawalat ticket , kaidiyana,register 400 page , use and throw pen blue black,red , reynolds pen blue and red , a4 size paper ,,carbon paper , register 192 page , envelop 250 pcs,box 4x9 inch , envelop 100 pcs box 16x12 inch ,,cello tape brown tape 2 inch , cello tape 1 inch ,,gum bottle , history ticket ct , cash payment book,16 number 100 page , cash book 200 page , gate book,400 page , mulakat ticket , opd register 400 page ,,hawalat register convict in out 400 page , pencil ,,fevigum 200 ml pack , indent book , ff2 file cover ,,file cover , gi pipe point 5 inch , gi pipe point 75 inch ,,gi pipe 1 inch , gi gate valve ponit 5 inch , gi gate,valve point 75 inch , gi gate valve 1 inch , pvc pipe,point 5 inch , pvc pipe point 75 inch , pvc pipe 1 inch ,,pvc pipe 4 inch , pvc toti , pvc angle cock , pvc,washbasin toti , pvc connection pipe , wastage pipe ,,coupling jaali , steel jaali , phenyl , harpic , toilet,brush , flower broom , detergent soap 250 gram ,,bath soap 100 gram , tooth paste 100 gram pack ,,shaving blade 5 pcs packet , ghadi cell , remote,cell , coconut broom , acid toilet cleaner , tooth,brush rs 20 per pcs , vim bar rs 10 per pcs ,,bleaching powder , detergent powder 100 gram,pack , wiper full size , sutli , plastic rope 8mm ,,plastic rope 10mm , plastic rope 12mm , mosquito,kill pesticide , salt saabut , kala namak saabut ,,chakki patthar 24 inch , aata chakki ka patta , biroja,, cahakki lapeta , grease , lizol 1 litre pack , colin 1,litre pack , gum shoes per pair , plywood isi mark 6,mm , plywood isi mark 10 mm , plywood isi mark 12,mm , sunmica sheet various colors , iron keel,various sizes , kabza 4 inch , fire wood , markin,cloth , batten patti 1 inch , batten patti 2 inch ,,batten patti 3 inch , pvc pipe clip 100 pcs packet 1,inch , gi pipe clip 100 pcs packet 1 inch , pvc t 100 pcs,packet 1 inch , single power compine 16 amp , double,isolator 40 amp , 2 core isolator 63 amp , 4 core,isolator 100 amp , mcb 10 amp , mcb 16 amp , mcb 20,amp , mcb 32 amp , 2 core mcb 63 amp , 4 core mcb,100 amp , copper wire 1 mm , copper wire 1.5 mm ,,copper wire 2 mm , copper wire 2.5 mm , copper wire,4 mm , 2 core pvc aluminium wire 6 mm , 2 core pvc,aluminium wire 10 mm , 4 core pvc non armoured,aluminium wire 10 mm , 4 core non armoured,aluminium wire 20 mm , switch 6 amp , switch 16 amp,, socket 6 amp , socket 16 amp , holder simple , led,tube light 27 watt , street light 65 watt , street,light 100 watt , street light 200 watt , flood led,light 200 watt , electric insulation tape , water,proof insulation tape , condenser 3point25 ,,condenser 2point5 , fan bearing 6201 no , fan,bearing 6202 no , fan binding wire 35 no , fan,binding wire 36 no , led bulb 9 watt , led bulb 50,watt , ceiling fan per nos , cut out 100 amp ,,starter 3 face l and t , brick , sand , gravel ,,cement 50 kg bag , angle 35mm x 35mm , angle 40mm,x 40mm , magra , colour profile sheet , hp screw 1,inch 250pcs box , hp screw 1point5 inch 250pcs box ,,hp screw 2 inch 250pcs box , hp screw 2point5 inch,250pcs box , hp screw 3 inch 250pcs box , welding,rod 8 number , welding rod 10 number , cutting,wheel 4 inch , cutting wheel 5 inch , cutting wheel,14 inch , grinding wheel 4 inch , grinding wheel 5,inch , paint enamal different colours , paint apex,various colours , fevicol sh sh , fevicol ddl ddl ,,semosem teracoat 25 kg bag , birla wall putti 20 kg,bag , pop 25 kg bag , stanner 200ml , paint brush 0,number , paint brush 1 inch , paint brush 2 inch ,,paint brush 3 inch , paint brush 4 inch , rekmaar,wooden 32 number , rekmaar wooden 80 number ,,thinner per litre , tarpin oil per litre , wood primer,per litre , primer red oxide , iron jaali macchar ,,sariya 1 soot , sariya 2 soot , sariya 3 soot , sariya,4 soot , iron wire , iron wire brush , chuna dust ,,white cement , isolation sheet , polycarbonate,sheet , fibre sheet , tile cutting wheel,office stationery/constraction and miscellaneous| quantity - 111439
supply of - all in one pc (v2) (q2) , a4 and legal size multifunction printer (mfp) (q2) , line interactive ups with avr (v2) (q2) - | quantity - 114
supply, installation, testing and commissioning work of electro mechanical accessories for the project of tansa augmentation of tansa group water supply scheme of bhavnagar district
sitc of high quality indoor video data wall with approx size like 9 point 5ft by 3 point 5ft as per specifications in section 10 , sitc of active video controller system with rack mount facilities as per specifications in section 10 , sitc of frame work along with all patch cords and cabling of the system as per the site requirement and specifications in section 10 , supply installation testing and commissiong of video bar all in one video conferencing system as per specifications in section 10 , supply installation testing and commissiong of 75 inches led tv , supply installation testing and commissiong of standard accessories like remote cables etc , 8 channel nvr with 1 sata as per specifications in section 10 , sitc of stqc certified 5mp ir dome and bullet camera 2 point 8mm lens as per specifications in section 10 , hardisk 4 tb , 8 port poe switches , conduit pipes along with bends flexible etc , 4u racks , 2 point 5 sqmm wire , cat 6 wire , 65 inches led tv , sitc of 5 kva ups with 65 ah batteries 16 nos , providing and installing ergonomic high back chair with 360 degree swivel along with knee tilt synchro mechanism , providing and installing adjustable revolving high back office executive chair made of 40 density pu foam or memory foam , providing and fixing pre assembled 3 seater sofa with cushions , providing and fixing of both sides pre laminated 17 mm hdhmr board conforming to the indian standard 12823 is to 2015 , providing of pre laminated superior particle board office table of size 2x4 feet with sufficient storage cabinets drawers sliding tray , providing and fixing of modular l shaped executive office table with in built switch sockets dimensions 1 point 8m x 1 point 8m , steel almirah conforming to is 3312 with size 1800mmx850mmx480mm with shelves drawers handles lockes and lockers including carriage to site with one year warrenty - it infrastructure | quantity - 2220
1. annual contract for ash slurry pipeline work at ntpc and related work from bph pump house to ash bund area.;2. machining of spare parts for id fan as required at bmm 2.;3. supply of numerical protection relay during repair of testing unit 2, group 4.;4. supply of required air regulator at i&c - 2.;5. contract for various auxiliary equipment required at ntpc - and for analysis of hydraulic oil.;6. purchase of p-tube for economizer coil fins at bmm 2.;7. work of re-fixing aph pin rack assembly pins during capital overhaul of bmm 2, group 4.;8. supply of boiler safe direct erect scaffolding system cup lock spares. ( marathi image)