FILTERS
corrigendum : work for construction of water treatment plants cwrs and cwphs near wtps clear water transmission main from wtp various ipss laying of rising mains to different esrs construction of esrs distribution system in villages providing fhtcs including
View Insights
corrigendum : planning, designing, engine... - planning, designing, engineering, procurement, construction, installation, testing, commissioning of 50 mld capacity common effluent treatment plant (cetp) based on physico-chemical, biological (extended aeration process)
request for qualification cum request for proposal for design and construction of common effluent treatment plant (cetp) of 20 mld capacity on epc basis in dholera special investment region, dholera
request for qualification and request for proposal for design and construction of common effluent treatment plant (cetp) of 20 mld capacity on epc basis in dholera special investment region, dholera
design, supply, installation, testing, and commissioning of a sewerage treatment plant (open technology) of 100 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years at valak in new east zone-b(sarthana) of surat municipal corporation.
corrigendum : nit no. 11(2026-2027) ee(sdw)vi/item no.1 - supply, installation, testing and commissioning of sludge management system at various stps of delhi jal board (sludge district-3, keshopur stp ph-i, ii and iii)
corrigendum : nit no. 11(2026-2027) ee(sdw)vi/item no.2 - supply, installation, testing and commissioning of sludge management system at various stps of delhi jal board (sludge district-4, rithala phase i, ii and rohini stp)
construction of waste water treatment plant at the confluence point of river daya and ganguanala (phase-ii) including operation and maintenance for a period of five years
design, supply, installation, testing, and commissioning of a sewerage treatment plant (open technology) of 42 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years at saniya hemad for newly added area of new east drainage zone-a (varachha), surat municipal corporation.
c/o multilevel parking at dr. radha krishanan medical college hamripur at jolsapper tehsil nadaun distt. hamirpur (hp) - part i civil work c/o building portion i/c w.s. and s.i. rain water harvesting tank, septic tank, site development, fire fighting, water storage tank, approach road boundary wall etc.) part-ii-electric work (sh- sitc, electrical installation, fire
corrigendum : nit no. 11(2026-2027) ee(sdw)vi/item no.3 - supply, installation, testing and commissioning of sludge management system at various stps of delhi jal board (sludge district-1, coronation pillar phase i and ii, iii and new stp)
corrigendum : jambutake industrial area.. permanent water supply scheme and provision of infrastructure facilities.. construction of jackwell, approach road, approach bridge, 1.50 mld capacity water treatment plant (wtp), 300 cum elevated service reservoir (esr), 1000 cum sump, and provision of pumping machinery for water.
construction of 2.5 mld water treatment plant (wtp) at golapati
survey, design & construction of works consisting of 6 . 5 0 mld water treatment plant, over head tanks, building works, laying of pipeline, road reinstatement works & sitc of pumping plants, automation works and all other appurtenant works including civil & electro-mechanical works with 05 years o&m including supply of all materials, labour, t&p etc. required for proper completion of kaulagarah water supply scheme under amrut 2.0 programme.
canal water based water supply project for construction of 12.0 mld water treatment plant and other related works including operation and maintenance for a period of 5 years at rampura phul district bathinda, punjab under amrut 2.0 scheme.
corrigendum : construction of bus stand, workshop ,and e-bus depot nadaun, tehsil nadaun district hamirpur, h.p - part-i-civil work of bus stand , workshop, and e-bus depot i/c bus charging bay and covered parking i.e. building portion i/c ws, si , site development, boundary wall, rain water harvesting tank, septic tank, c/o pavement work, c/o approach road,
11 mld wtp patti town - canal water based water supply project for construction of 11 mld water treatment plant and other related works including 5 years operation and maintenance at patti district tarn taran punjab under amrut 2 scheme
corrigendum : design, construction, testing and commissioning of water treatment plant at manjhawali (10 mld) and dadasiya (20 mld) for removal of heavy metals (min. 95-98 percnt eff.) such as arsenic, manganese, etc from ranney well water with advanced adsorption
corrigendum : nit no. 11(2026-2027) ee(sdw)vi/item no.4 - supply, installation, testing and commissioning of sludge management system at various stps of delhi jal board (sludge district-2, narela stp)
construction of mps and 7.0 mld capacity stp with 6.50 kld co-treatment plant - interception and diversion works of gate road drain, mrf centre drain, hari masjid drain, masjidiya drain, badhana talab drain, and all other associated works for fully tapping of drains as per design, drawing, and directions. e.i.
corrigendum : consultancy services for preparation of detailed project report and bid document for integrated waste water management under ruidp phase v (rulip)
comprehensive operation and maintenance of surface water based cheriya bariyarpur multi village pipe water supply scheme of capacity 5.65 mld including supply of manpower, maintenance of infrastructure and mechanical parts, maintenance of fhtc, scada and electricity payment of electro mechanical parts including building, lighting and other accessories of wtp based on actual consumption of electricity. covering 70 wards under five panchayat (sripur, khajapur, pabra, bariyarpur, sahpur) of cheriya bariyarpur block under p.h.division, teghr a in district begusarai for five years. salient features of cheriya bariyarpur mvs:- 1. source river gandak a. intake well (6.73 mld) b. gangway 2. water treatment plant (5.65 mld) a. pre settling tank - 2nos b. pst pump house - 1 nos c. cascade aerator 1 nos. d. flash mixer 1 nos. e. clarifloculutor-1 nos. f. filter house - 1nos. g. clear water reservoir (800 cum) & pump house- 1 nos. h. backwash sump-1 nos. 1. centrifuge building j. chemical house k. staff quarter l. mesr (750 kl) staging-26 mtr and five zonal esr (175 kl-470kl with (12 meter-17 meter) stagging m. boundry wall n. rising main -11634 mtr. o. distribution main-72150 mtr. p. total pump capacity-235.5 kw(approx) q. total no. of house connection-12343 no.
corrigendum : canal water based water supply project for construction of 5.00 mld water treatment plant wtp and other related works including 5 years o and m part 2 at samrala town district ludhiana punjab under amrut 2 scheme
construction of a barracks with a capacity for 320 police personnel at the new police lines, commissionerate lucknow (g+5 instead of g+4 in the west).,,construction of a boundary wall at kasturba gandhi balika vidyalaya, kakori, district-lucknow.,,reconstruction of a dilapidated building and construction of a toilet block at sakaran, district-sitapur.,,construction of a septic tank and boundary wall at kasturba gandhi balika vidyalaya, nakaha, district-lakhimpur.,,construction of a guard room, septic tank, and boundary wall at kasturba gandhi balika vidyalaya, phardhan, district-lakhimpur.,,construction of a septic tank and boundary wall at kasturba gandhi balika vidyalaya, mohammadi, district-lakhimpur.,,construction of a septic tank and boundary wall at kasturba gandhi balika vidyalaya, bijua, district-lakhimpur.,,construction of a septic tank and boundary wall at kasturba gandhi balika vidyalaya, nighasan, district-lakhimpur.,,construction of a septic tank and boundary wall at kasturba gandhi balika vidyalaya, bankeganj, district-lakhimpur.,,construction of a septic tank and boundary wall at kasturba gandhi balika vidyalaya, behjam, district-lakhimpur.,,construction of guard rooms and septic tanks across various blocks in district-lakhimpur (dhakhwa, isanagar, kumbhi gola, lakhimpur, mitauli, phoolbehar, ramia behar, pasgawan, and dhaurahra). (hindi documents).
comprehensive operation & maintenance of civil & electromechanical assets such as elevated service reservoirs (e.s.r), hglr, sump, water treatment plant, chemical house, staff quarters, pump house, all bulk transmission and distribution pipelines, valves, pumping machinery & electrical equipment etc. for dharoi dam based khedbrahma rwss, including supply of 24.00 mld potable water to all the 122 villages / 52 habitations for 60 months. taluka: khedbrahma poshina & vijaynagar, district: sabarkantha based on dharoi intake well and open well. including supply of pac liquid and chlorine gas.
corrigendum : jal jeevan mission (jjm)-rwss to cherukole-naranganam design and construction of 10 mld water treatment plant with 8.5ll sump cum pumphouse and 5ll ohsr at vayalathala wtp site
corrigendum : jal jeevan mission (jjm)-chenneerkkara panchayath-construction of 11.5 mld wtp for chenneerkara and omalloor panchayaths. - jal jeevan mission (jjm) -chenneerkkara panchayath-construction of 11.5 mld wtp for chenneerkara and omalloor panchayaths.
corrigendum : canal based water supply project for construction of 2.01 mld water treatment plant wtp and other related works including 5 years maintenance part 2 at amargarh district malerkotla punjab 9 under amrut 2.0 scheme
job no.1 i.e.c/o, level-iil trauma centre building at kotkhai, distt.shimla,h.p. (sh: c/o,civil work, w.s.s.l. and e.i. rain harvesting tank, septic tank i/e soak pit and site development)
corrigendum : c/o level-iii, trauma centre building at kotkhai, distt. shimla, h.p. c/o civil work, ws and si rain harvesting tank, septic tank i/e soak pit, site development and electrical installation etc.
design and engineering, manufacture, supply, installation, and commission of 200 kld multi effect evaporation plant including testing, trial run and performance guarantee test run at common effluent treatment plant (cetp).
annual maintenance contract for the maintenance and repairs of civil components and electrical-mechanical machinery of shahad headworks and 285 mld wtp temghar, along with allied components, including the provision of manpower services for a duration of 2 years.
planning, designing, engine... - planning, designing,engineering, procurement, construction, testing and commissioning of 0.75 mld common effluent treatment plant complete in all respect on epc basis with 10 years of oandm and dlp at hsiidc, ie samalkha panipat
corrigendum : canal water based water supply project for construction of 4.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance at bhagat bhai ka, district bathinda, punjab under amrut 2.0 scheme
3 numbers automatic coach washing plants (acwps) with provision of effluent treatment plant (etp) and water recycling plant (wrp) and maintenance and operation for two years in warranty period from the date of commissioning and operation and maintenance of acwps for three years with etp after warranty period at lucknow, varanasi and ayodhya cantt depot of lucknow /nr division.
3 nos. automatic coach washing plants (acwps) with provision of effluent treatment plant (etp) and water recycling plant (wrp) and maintenance & operation for two years in warranty period from the date of commissioning and operation & maintenance of acwps for three years with etp after warranty period at lko, bsb & ayc depots of lko/nr division.
corrigendum : jal jeevan mission(jjm) - rwss to madapally-5th swsm-design, construction and commissioning 4.5mld water treatment plant at nedungadapally
design, drawing, construction, testing and commissioning of sewerage system, 600 kld stp and 80 kld etp for dhh in malkangiri of odisha including o and m for a period of five (05) years - laying of sewer line, construction of inspection chamber, manhole chamber, gully trap, ready to install and plug and play type etp and stp with scada and automation facility including all associated works etc
construction of an additional 100 bedded girls community centre at nadaun district hamirpur part-i civil work - c/o civil work, i.e. (building portion) including ws and si, septic tank and soak pit, rain water harvesting tank, fire fighting tank, site development, boundary wall etc.) part-ii electrical work providing e.i., fire fighting system, fire al
design, drawing, construction, testing and commissioning of sewerage system, 390 kld stp and 50 kld etp for dhh in nuapada of odisha including o and m for a period of five (05) years - laying of sewer line, construction of inspection chamber, manhole chamber, gully trap, ready to install and plug and play type etp and stp with scada and automation facility including all associated works etc
design, drawing, construction, testing and commissioning of sewerage system, 550 kld stp and 80 kld etp for dhh in nabarangpur of odisha including o and m for a period of five (05) years - laying of sewer line, construction of inspection chamber, manhole chamber, gully trap, ready to install and plug and play type etp and stp with scada and automation facility including all associated works etc
kmc/ws/mgps/jora(2nd call)/01/2026-27 - operation and maintenance of modern water treatment plant of 8.0 mgd capacity with 3.5 mg capacity semi underground rcc reservoir and booster pumping station within jorabagan park at north kolkata.
corrigendum : construction of muga spun silk mill - construction of muga spun silk mill along with boundary wall , under ground reservoir, elevated surface water reservoir, effluent treatment plant, rapid sand filter etc. at gogamukh sericulture farm, dhemaji
corrigendum : nit no. 01/2026-27 ace (p) nagaur - oandm of main ph at intake nokhadaiya and ips deshnok, 74 mld output capacity wtp at nokhadaiya, including emi installations, valves etc and ms pl of 1200mm dia from nokhadaiya ph to ips deshnok and ips deshnok to nagaur under nlp ph-i pkg-i
construction of new government college building including water supply, sanitary fittings, septic tank, rain water harvesting, approach road & electrification works at bhimbhouri, block berla, district bemetara (chhattisgarh).
design, drawing, construction, testing and commissioning of sewerage system, 330 kld stp and 30 kld etp for dhh in baleshwar of odisha including o and m for a period of five (05) years - laying of sewer line, construction of inspection chamber, manhole chamber, gully trap, ready to install and plug and play type etp and stp with scada and automation facility including all associated works etc
construction of mehsana city & rural sub-division office building, including water sump, septic tank, rainwater harvesting system, rcc road, electrification, furniture, and fire safety system at mehsana campus under ugvcl, mehsana circle office.
construction of medical block, emergency ward alongwith operation theatre at phc jahu in distt. bhoranj. distt. hamirpur-sh. part civil works i.e building portion,w/s and septic tank, rain water harvesting tank, boundary wall and gate.
design, drawing, construction, testing and commissioning of sewerage system, 300 kld stp and 60 kld etp for dhh in gajapati of odisha including o and m for a period of five (05) years - laying of sewer line, construction of inspection chamber, manhole chamber, gully trap, ready to install and plug and play type etp and stp with scada and automation facility including all associated works etc