FILTERS
corrigendum : development and maintenance of land to be created in offshore of vadhvan coast by dredging, reclamation and construction of offshore protection bund for vadhvan port on ppp to be executed on hybrid annuity mode
View Insights
corrigendum : construction of breakwater, rock bund, wharf and capital dredging and reclamation for backup yard and allied onshore facilities including maintenance thereof on hybrid annuity model (ham) under development of outer harbour at v.o. chidambaranar port.
engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut- cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar- andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 41.50 to km 69.60 (including nunkhari station) involving earthwork in formation, embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), viaducts, tunnels, protection works, blt works, p.way track works with contractor's own materials (except new/sh rails), construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, tunnel ohe with rocs, tunnel lighting, tss, sp, general power supply arrangements modifications/conversion to underground for overhead electrical ht/lt power line crossings etc on epc basis in waltair division of east coast railway.
construction of new railway bg line in km 28/970 to 42/040 in between kulthana including and rajpura stations including earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge ( 03 nos) in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
pre-bid assistance for preparation of priced boq for the tender- construction of new railway bg line in km 28.970 to 42.040 in between kulthana station (including) and rajpura station (including) earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge (03 nos) including electrification in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h- beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
engineering, procurement and construction (epc) tender for"construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, lc work and other miscellaneous works for 25t indian railway standard loading from raxaul (excl.) to narkatiaganj (excl.) (i.e. ch.189.400 to 227.200) (total- 37.80 km) in connection with doubling of raxaul - narkatiaganj section in samastipur division of east central railway"
construction of 3rd line work including earthwork, blanketing, minor bridges, major bridges, lc work and other miscellaneous works for 25.0t and dfc feeder route of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of chandil- madhukunda section in adra division of south eastern railway on engineering, procurement & construction (epc) mode.
engineering procurement and construction (epc) for "construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 26.292 km) in connection with the doubling of the bakhtiyarpur-rajgir - tilaiya section"
jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleepers, special psc sleepers (for turnouts, improvised sejs, guard rails etc), points (thick web switches) & wcms crossings, glued joints, h-beam/composite sleepers over girder bridges, improvised sejs, all p-way fittings, 2x25 kv ac ohe works, 2x25 kv tss with sp/ssp works along with scada, modification/conversion to underground for overhead electrical ht/lt power line crossings, electrical general services, construction of platforms, station buildings, service buildings, sp/ssp buildings, trd depot building with tower wagon shed, residential buildings, water supply, indoor and outdoor electrification etc. on epc basis in rgda division of east coast railway"
corrigendum : execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
construction of residential towers at bacheli complex under capacity expansion of bailadila iron ore deposit-10/11a, nmdc bacheli, chhattisgarh comprising 5 nos. type-iii residential towers (s+10), 1 no. type-iv residential tower (s+10), 2 nos. staff hostels (s+10), 2 nos. executive studio apartments(s+10), 3 nos. transit and apprentice hostels(s+10), 1 no. shopping complex and guest house (g+1), 2 mld stp, site development (civil, water supply and firefighting works), external electrical works and demolishing works on epc mode
provision of infrastructure development works (earthwork in embankment, bridge extension, retaining wall cum boundary wall, road works, etc.) in connection with development of land for proposed poh cum new emu maintenance depot with emu stabling sidings at vangaon (km 112/1 to km 115/1, west side of existing railway tracks between vangaon & dahanu road stations) under mutp iii & mutp iiia.
corrigendum : mrvc/w/401 - provision of infrastructure development works (earthwork in embankment, bridge extension, retaining wall cum boundary wall, road works, etc.) in connection with development of land for proposed poh cum new emu maintenance depot at vangaon
handling ,transport and other mining services - percentage quote based - ob removal, excavation of 27.88 mbcm overburden at jhingurda project of ncl for 1096 days
earthwork repair and construction of distribution network of nabinagar amba aurangabad madanpur and gaya divisions of right main canal bihar and its structures under north koel reservoir project jharkhand and bihar
earthwork in formation, construction of major & minor bridges, retaining wall, drains, supply of ballast, p. way materials & track linking works, construction of building and allied works from ch 9/190 km (take-off) to ch 15/342 km (de) in connection with proposed siding for the work of rail connectivity for proposed phase-ii silo (02 nos. -20mty) at lakhanpur area of mcl at jharsuguda, odisha. pkg-ii
mcl lakhanpur phase ii - earthwork in formation, construction of major minor bridges, retaining wall, drains, supply of ballast, p. way materials track linking works, construction of building and allied works from ch 9/190 km takeoff to ch 15/342 km de in connection
drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
engineering, procurement and construction (epc) agreement for construction of new bg rail line including earth work, blanketing, minor bridges, major bridges, track works, station building, buildings and other miscellaneous works for 25t indian railway standard loading from sitamarhi (excluding) to rewasi (including) (i.e.ch. 0.700 to 12.400) (total length = 11.70km) in connection with sitamarhi-sheohar new bg rail line project in east central railway in the state of bihar
construction of doubling of track work including earthwork, blanketing, minor bridges, lc work and other miscellaneous works for 25t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the adra-sanka-rukni doubling project of adra division, south eastern railway on engineering, procurement & construction (epc) mode.
construction of buildings for about 168 residential flats and guest house 32 rooms for sbi officers after demolition of existing old building at sbi officers colony, char imli, bhopal, madhya pradesh in epc mode.
corrigendum : planning, designing and construction of various buildings under phase-ii, barc township anudurga at kudhapura, challakere, chitradurga, karnataka. sh: planning, designing and construction of 72 nos, type-ii quarters consisting of 3 blocks (stilt+4 floors), 24 nos type-iii quarters consisting of 1 block (stilt plus 4 floors), 8 nos type-v quarters consisting of 1 block (stilt plus 4 floors), 1 no type-vi duplex quarters, guest house (g plus 3), multi purpose hall (g plus 1), school building (g), shopping complex (g plus 1), creche (g), swimming pool with filtration plant and balancing tank, organic waste composter, substation building and dg set yard, stp and plant room, football ground, box cricket ground, athletic track, basketball court, lawn tennis court, cricket ground, childers play area/central park......making the entire project fit for occupation and fully functional, complete in all respects on engineering, procurement and construction (epc) mode-i and turnkey basis.
providing and exec of fmn, pmt and surf wks incl bituminous courses, modular imb fencing with solar lights, elevated sentry posts, ilcb and foot track bet bp-56 and bp-57, incl imb rd-03 and approach rd-02 under (p) sewak in chandel district, manipur
integrated irrigation, drainage and water infrastructure modernization project in barada ghed area (phase-2). excavation and resectioning of various rivers/drains/ vonkla/ canals and deepening ponds in barda ghed area. (package-3).
doubling of track between turavur - mararikulam (tuvr - makm) section:- proposed earth work in formation, modification of lcs, provision of s&t accommodation and gate lodges, provision of cable ducts , side drains, retaining walls, construction of platforms, construction of fobs, protective works, proposed extension of minor bridges, between turavur (excluding) and cherthala (excluding) stations (km 24/000- km 32/100) (tuvr-srtl reach)
earthwork in formation, construction/strengthening of major/minor bridges, construction of side drains, boundary walls and retaining walls etc between mumbai central to khar road stations in connection with the 6th line between mumbai central to borivali stations of mumbai division of western railway.
corrigendum : custom bids for services- the work of temporary bund removal & dredging for area between temporarybund and existing harbour wall channel at mumbai port authority
1) navsari district jail special repair (8th attempt): special repair works for the store building at navsari district jail, including electrification components., 2) navsari police infrastructure repair (4th attempt): special repair works at the sp office, town police station, savar police line, and new police line in navsari., 3) savar police line demolition: demolition of the deputy sp building (quarter guard), deputy sp building (old lcb office), and d-06 officer building at savar police line, navsari (including debris removal and land leveling)., 4) surat emrs campus construction (deposit work - gstes): construction of school building, boys hostel (g+2), girls hostel (g+2), kitchen dining hall, staff quarters, class-4 staff quarters, and campus development at mangrol (laveth), surat (includes electrification, furniture, and fire-fighting setup)., 5) valsad emrs campus construction (deposit work - gstes): construction of school building, boys hostel (g+2), girls hostel (g+2), kitchen dining hall, staff quarters, class-4 staff quarters, and campus development at umargam, valsad (includes electrification, furniture, and fire-fighting setup). (gujarati document)
construction of model bus station at kuppam, chittoor district (including civil works, yard work, water supply & sanitary arrangements, electrification, firefighting system, havc works, cctv and pa system, stp works and land scrapping works) (payment mode through nidhi portal govt. of ap)
doubling of track between alappuzha - ambalapuzha (allp - ampa) section: proposed earth work in formation, modification of lcs, provision of s&t accommodation and gate lodges, provision of cable ducts , side drains, retaining walls, construction of platforms, provision of platform shelters, protective works, proposed extension of minor bridges along with p way works at alappuzha yard (km 54/100-km 58/800).
1 dismentaling of c type quarter at sub jail godhra dist panchmahal 2 dismentaling of c type quarter and toilet room at sub jail chhotaudepur 3 construction of psi-1 & 2 room at virpur police station, dist mahisagar (including electrification) 4 special repair to cat b-48 (railway police staff quarter) at srp gr-05 godhra dist panchmahal (including electrification) 5 special repair to cat morva hadaf police line, dist panchmahal (including electrification) 6 construction of school building, girls hostel, staff quarters, mess building, class iv quarters, infrastructure etc. for girls school complex at muvada vadoth taluka pavijetpur dist. chhota udepur (including electrification)
scr construction organization- nanded division- proposed yard arrangements at dinegaon yard from km. 167.500 to 170.200 (2.70kms) and jalna yard at km. 174.975 to 177.450 (2.475kms) (total:5.175kms) in connection with proposed doubling of track from chhatrapati sambhaji nagar to parbhani stations and as a part of jalna- jalgaon newline: execution of earth work in formation, construction of minor bridges, fob, station building, rbg rooms, goompties, staff quarters, high level platform, collection of ballast, transportation of p.way materials, laying and linking of track and other connected miscellaneous works etc
corrigendum : construction of new building of ccgrt, navi mumbai by demolishing the existing building at plot no. 101, sector 15, institutional area, cbd belapur, navi mumbai - 400 614, maharashtra
integrated irrigation, drainage and water infrastructure modernization project in sorthi ghed area phase-2 package-2:- deepening and desilting of rivers and drains, sub package-1:- excavation and re-sectioning of various rivers/drains in sorthi ghed porbandar district.
shoranur-mangaluru section: (1) proposed re-construction of br. no. 829 (proposed dn line) at km 603/700-800 as 3x12.2m clear span psc slab between pallippuram and kuttippuram stations (2) proposed re-construction of br. no. 1177 (proposed up line) at km 822/300-500 as 6x12.2m clear span psc slab between kanhangad & kotikulam stations (3) proposed re-construction of br. no. 1188 (proposed dn line) at km 827/500-700 as 4x12.2m clear span psc i girder & slab between kanhangad & kotikulam stations including earthwork & blanketing for formation on approaches, collection of ballast, linking of track and other miscellaneous works in palakkad division of southern railway.
custom bid for services - 9060c26c66 rprc261382 rate contract for supply erection and dismantling of scaffolding jobs at panipat refinery and petrochemical complex
integrated irrigation, drainage and water infrastructure modernization project in sorthi ghed area phase-2 , package-2:- deepening and desilting of rivers and drains, sub package-2:- excavation and re-sectioning of various rivers/drains including construction of various new canals in sorthi ghed porbandar district.
balance work of earthwork in cutting and filling in embankment with mechanical compaction, supplying, spreading and compaction of stone dust blanketing, extension of minor bridges, construction of gate lodge, extension of level crossing gates, retaining wall, demolition of infringing structures, linking of track, points & crossing, supplying, stacking & spreading of machine crushed stone ballast, transporting of p. way materials and other ancillary works from ch-48.940km. at kalyani (excluding) to ch-71.588 at ranathat (excluding) in connection with construction of 3rd line between naihati & ranaghat.
site enabling works package for great nicobar island gas engine power project (108 mw 5 mw)
construction of new boundary wall, watch tower & old boundary wall dismantling (pkg.no.en-01b1)
construction of ohe depot & tower wagon shed, drain works, return wall/toe wall, dismantling of old fob and construction of new foot over bridge at dhutra station & other miscellaneous work related with jharsuguda to sardega mahanadi coalfields limited line in chakradhar division under the jurisdiction of dy ce/con/rourkela of s. e. railway.
earthwork, blanketing, turfing in approach of bridge no. 16 (up & dn line) and transportation, launching & erection of 1x30.5m+3x61m+1x30.5m owg girder and other miscellaneous work in connection to rebuilding of bridge no. 16 between khagaria-umeshnagar of sonpur division
corrigendum : tender for engineering, procurement and construction for development of off dock container stacking yard at loco shed area of kds, syama prasad mookerjee port, kolkata.
corrigendum : operation and maintenance for 10 years of the 10.315 km puruliya bypass section of nh-32 including balance work and dismantling and re-construction of defective or damaged section in the state of west bengal
construction of service building, s&t rooms, gate lodge at level crossing, rail/ high level passenger platforms, fencing, extension of minor bridges etc. provision of station name board, including dismantling of existing building structure & fencing, up gradation/ extension of level crossing, construction of limited height subway/ road under bridge in lieu of lc by pushing method of precast box segments under running traffic condition including construction of approaches, provision of height gauges at lhs and l-xings etc. and linking of bg track & turnouts, provision of glued joints & sejs, dismantling of existing track & turnouts, handling, lifting, loading, leading, unloading and spreading of ballast, handling of p.way material including working in bni/ ni period and other allied works at dalel nagar, chodiala, aghwanpur station on lucknow-moradabad-saharanapur section in c/with "longer loops in both direction at dalel nagar & chodiala" and "extension of siding to accommodate full train load" in the jurisdiction of dy ce/c/mb unit on moradabad division
providing 10 mvar/20 mvar capacitor banks along with associated bay equipment, control & protection panels, at various 66 kv and 110 kv sub-stations under kalaburagi, bengaluru, tumakuru and hassan operation zones of kptcl on total turnkey basis, including supply of all materials/equipments and erection (including dismantling & civil works) of all materials/equipments, testing and commissioning
establishing 2x20mva, 110/11kv sub-station at halapura (joladarasi) and construction of 110kv lilo line using lynx conductor from 110kv maski - hutti line to the proposed 110kv sub-station at halapura (joladarasi) for a distance of 9.39km in maski taluk & raichur district including supply of all matching materials/equipments (excluding supply 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, testing and commissioning