FILTERS
comprehensive annual maintenance contract for axle mounted disc brake system of lhb coaches ( ftrtil make).
View Insights
annual maintenance contract for m/s. faiveley make axle mounted disc brake system fitted in lhb coaches at carriage workshop, lallaguda, secunderabad.
corrigendum : work of re-insulation of generator rotor coils, damper segment of generator rotor unit no. 4, packing, transportation from sgtps ph-ii to firm workshop and vice versa, work of generator rotor repairing for the rectification of rotor earth of 210, sgtps
corrigendum : design, engineering, manufacturing, supply, installation, testing commissioning of stator core, winding and reinsulation of rotor poles with class f insulation of unit1
comprehensive repair/renewal of ccb brake system in 3-phase electric locomotive.
'comprehensive repair/renewal of ccb brake system in three phase electric locomotives' at electric loco shed, ghaziabad.
comprehensive repair, condition monitoring and maintenance of ccb brake system in 3-phase electric locos. (qty: 20 nos loco set)
corrigendum : supply of - split air conditioner, wall mount type (v3) isi marked to is 1391 (part 2) (q2) , ss and sc centre lathe all geared for fitter trade , pillar type drilling machine , drilling machine bench , cut section model for pneumatic components of pneumatic trainer kit , cut-section models for hydraulic components of hydraulic trainer kit , power saw machine hydraulic feed system , ss and sc centre lathe all geared for machinist trade , tool and cutter grinder , drilling machine pillar , radial drill , universal milling machine , surface grinding machine , cylindrical grinder , single door direct cool refrigerator carrying with hfc and hc , frost free refrigerator , three four door refrigerator inverter type , core drill machine , bench drilling machine , window ac , duct able split ac one and half ton , cassette air conditioner , rotary hermetic compressor , deep freezer , display cabinet , water cooler storage type , ice candy plant , air conditioning direct system , package ac , bus ac tutorial model , automatic ice cube mc , storage type water cooler hot and cold , visi cooler , vrf vrv unit with two indoor units , split ac inverter technology , working model of air brake assembly , cut section of cross ply and radial tyres , cut section working model of automatic transmission gear box , demonstration board of mpfi system , drum brake assembly in working condition , front axle rzeeppa joint with stand for dismantling and assembly , tyre and split rim wheel assembly , tube tyre vulcanizing machine , diesel engine six cylinder in running condition , working condition of petrol mpfi engine assembly with fault simulation board , ss and sc centre lathe all geared for machinist grinder , pedestal grinder fitted with coarse and medium grain size grinding wheels , ag 4 grinder , portable drilling machine , simulators for mr mixed reality vr virtual reality , water cooled induction brazing machine , plastic machine with hot air gun , swaging and flooring tool kit 450 tubing , arbor press hand operated 2 ton capacity , automotive diesel smokemeter , diesel engine crdi 4 stroke dismantling and assembling with swivelling stand , drilling machine bench to drill up to 12mm dia along with accessories , grinding machine general purpose de pedestal with 300 mm dia wheels rough and smooth , hydraulic jack hi lift type 3 ton capacity and 5 ton capacity , multi scan tool , working condition of diesel engine crdi 4 stroke engine assembly with fault simulation board - workshop outfit | quantity - 104
retrofitment of twin pipe air brake system in existing single pipe wagons in visakhapatnam division for a period of 12 months
restoration of unit-ist including procurement of material/consumables required - "installation of bulk head on penstock line opening or miv locking for complete arresting water leakages. bulk head to be provided by j&k, pdcl.", "opening of all oil, water and air and grease, pipe lines of turbine and generator.", "installation of erection devices for dismantling / removing of draft tube cone (upper and lower), & runner assembly.", "dismantling of adjusting rings of draft tube, cone.", "dismantling of draft tube upper and the lower, cone.", "installation of bulk head on draft tube opening., bulk head, to be provided by j&k pdcl.", "opening of the supporting plates of regulating rings after disengaging from the connecting rods, of guide vane servomotors.", "dismantling of the existing shaft sleeve, assembly.", "dismantling of guide vane levers, guide vane, links etc.", "dismantling of all the turbine guide bearing, pads and storing them safely.", "decoupling of turbine shaft and the generator, shaft assembly.", "dismantling of all the guide vanes and guide, vane servomotors, etc.", dismantling of all the guide vane bushes from the top cover bush housings. however before their dismantling, diameters of all the pivot bushes shall be measured and recorded., dismantling of the turbine top cover assembly including the lower fixed labyrinth ring., dismantling of the turbine shaft assembly., "dismantling of the existing damaged shaft sleeve, assembly.", dismantling of all the guide vane bushes from the pivot ring assembly. however before their dismantling, diameters of all the pivot bushes shall be measured and recorded., "inspection of all the dismantled studs, dowels, bolts/ nuts, pins to identify their replacement by, new ones.", dismantling of pivot ring assembly., post dismantling activities, "balancing of rotor assembly conducting the impedance measurement of all the rotor pole coils followed by their polarity testing., completing the jointing of all the assembled/ tested rotor poles involving soldering, breezing and proper insulation. measurement of the insulation resistance of the rotor pole winding to check its final healthiness. balancing of rotor assembly including providing of weight", "balancing of rotor assembly including providing, of weight", "thorough cleaning of the complete generator stator core all along its periphery both inside as well as from its outside surface using a suitable, cleaning agent viz mto.", "thorough cleaning of all oil coolers along with, water tubes and pressure testing of the same with assembly.", "thorough cleaning of all turbine guide bearing, oil coolers and pressure testing of the same and assembly.", "thorough cleaning of the complete generator stator winding overhang portions all along its periphery on both its connection-end side as well as from its non-connection end side using a, suitable cleaning agent viz mto.", "blue-matching of rebabitated pads for checking quality of, rebabitating with a surface plate.", "blue-matching of thrust collat bottom surface with the top insulation surface for thrust runner, disc at service bay.", "blue-matching of rebabitated pads with the, coresponding journal surface on the thrust collar assembly.", blue-matching of rebabitated pads with the coresponding journal surface on the lower bearing journal on the generator shaft assembly., polishing of all the turbine guide bearing pads and blue-matching them with the coresponding journal surface on the turbine bearing journal on the turbine shaft assembly., "conducting the dry-out of the generator stator, winding assembly.", measurement of the insulation resistance of the rotor pole winding to check its final healthiness, "conducting the dry-out of the generator rotor, assembly.", boxup activities, assemblies of the top cover assembly in position with replacement of all its old fasteners by new ones which are to be procured., "replacement of 8mm rubber cord by a new, one.", "trial assembly of runner with pivot ring and, measurement of bottom labyrinths clearances.", trial assembly of runner with turbine top cover and measurement of top labyrinth clearances., re-assembly of pivot ring assembly in position., "re-assembly of all guide vanes in the pivot ring, assembly.", "lowering of turbine shaft assembly in the turbine, pit using the erection device.", "re-assembly of all the guide vane bush housings in the top cover and replacement of its damaged fasteners by new ones which are to be, procured", "assembly of regulating ring along with, connecting rods of the guide vane servomotors in the unit.", "lowering of lower bracket assembly along with brake jack assembly in position with all its, fasteners duly tightened.", "lowering of generator rotor assembly in the generator pit, supporting on the jacking pads.", "lowering of upper bracket assembly in position with all its, fasteners duly tightened.", "re-assembly of thrust collar assembly on the generator shaft by shrunk fitting method., checking the vertical movement of thrust collar, assembly.", "reassembly of thrust runner disc assembly, thrust pads, h.s., lubrication system, etc.", "checking of rotational level of generator shaft and correcting, the same", coupling of generator and turbine shaft flanges., "re-assembly of the francis runner assembly and its coupling with turbine shaft using new, coupling bolts & nuts.", "assembly of all associated turbine components viz guide vane servomotors, guide vane lever, & link mechanism.", "carrying out the combined rotational checks of the turbine & generator shafts and correcting the alignment, leveling & equal ioad sharing of, the thrust pads.", "centering of the shaft and setting of bearing clearances in, ugb, lgb & tgb in a concentric manner.", "checking and connecting of all oil pipe lines &, charging of governor.", "bedding & setting of all guide vanes with respect to steel liner, of top cover and lower ring to achieve proper, clearances.", "boxing up all bearings including their oil & water, pipe lines.", "complete assembly of draft tube upper cone, including full tightening of all bolts.", "complete assembly of lower cone with full, tightening of bolts.", "complete assembly of adjusting ring with full, tightening of all the bolts.", "complete assembly of shaft sealing system, including assembly of water pipelines", "complete assembly of oil bath of thrust bearing, with full tightening of bolts.", "assembly of grease pipeline of upper bushes and lower bushes and assembly of water pipe, line of lower bush", "measurement of insulation resistance value of, stator and rotor winding.", "spinning of the machine, dry out and then, synchronizing/ loading of the unit.", "carrying out the dry-out of the generator with windage loss method till the satisfactory levels of ir & the pi values is, achieved.", voltage build-up and subsequent synchronization of the unit followed by loading in steps and checking the unit vibrations at every step till the unit reached the rated load., carrying out the measurement of unit vibrations & dynamic balancing of the unit as required., labyrinth (stationary upper lower), shaft seal (flapper set), "all general purpose consumables, d&h make mo-309 5s welding electrodes, 0-rings, general purpose fasteners, stainless steel shims, insulation paints, etc. required during the, restoration work." for its restoration at ushp-ii, kangan.
repair of 12 mw gas expansion turbine rotor.
corrigendum : supply of - 100276975 - 10 - m4650996036 - radial seals set,ucrstage-iaphseals03 , 100276975 - 20 - m4650996035 - axial seals set,aph,ucrstagei ,27vim80in , 100276975 - 30 - m4650996034 - bypass seals set,ucr stage-i aph 01 , 100276975 - 40 - m4750016761n - axial seals,paph,27.5 vim 2000,cw ccw , 100276975 - 50 - m4750016762n - bypass seals set,paph,27.5 vim 2000 , 100276975 - 60 - m4750016763n - rotor post seals set cw ccw ,27.5 vim , 100276975 - 70 - m4750016757 - radial seal,corten-a,paph 27.5 vim 2000 , 100276975 - 80 - m4750026651n - axial seals,saph,30vim 2000,cw ccw , 100276975 - 90 - m4750026652n - bypass seals set,saph,30 vim 2000 , 100276975 - 110 - m4650010462 - t-bar,2-52-013- 00580,bhel , 100276975 - 120 - m4750016255 - t- bar,bhel,boiler,paph27.5vit m 2000 , 100276975 - 130 - m4750016502 - rotor angle set, ce ,paph 27.5 vim 2000 , 100276975 - 140 - m4750016503 - rotor angle set, he ,paph 27.5 vim 2000 - | quantity - 64
corrigendum : repair, maintenance, and installation of plant systemsequipments (version 2) - manufacturing unit; sgc 3rd and 4th barrel rotor; service provider
changing of brake blocks of brake hanger and pull rod hole adjustment of electric and diesel locomotives at loco shed, izzatanagar.
i&cadd-jcrdlis-phase-ii-intake pump house- 12.8 mw motor no.2 rotor earth fault rectification at intake pump house under jcrdlis
supply of - split air conditioner, wall mount type (v3) isi marked to is 1391 (part 2) (q2) , heavy duty screwdriver insulated , electrician screwdriver thin stem insulated handle , hammer cross peen with handle , pully puller with 3 legs , bearing puller , hacksaw frame , drill strainless steel twist block , contactor and auxiliary contacts 3 phase 415 volt 25 amp with 2 no and 2 nc , contactor and auxiliary contacts 3 phase 415 volt 32 amp with 2 no and 2 nc , load bank , miniature circuit breaker 16 amp , elcb and rccb 25amps double pole , rheostat , hp mercury vapour lamp , high pressure sodium lamp , low pressure sodium lamp , led 100w , rubber mat , digital multi meter , alternative current voltmeter moving iron analog , kilo wattmeter analog portable type housed in bakelite case , 3 point direct current starte , 4 point direct current starter , ac starters forward star delta starter , electric induction plate , dc power supply regulated short circuit protected voltage and current adjustable , battery charger voltage and current adjustable with display for voltage current , current transformer , hand drill machine electric with hammer action 13mm , multiple output dc power supply , digital storage oscilloscope , function generator , autotransformer , analog component trainer , milli ammeter dc , universal ic tester handheld digital ic tester , wireless communication modules for interfacing with microcontrollers , electronics maintenance work station , microcontroller atmega328 core 8051 ready to run programmer for atmega328p , application kits for microcontrollers atmega328 , seven segment dpm trainer , lcd based dpm , smps 5v 10a 50w , ups 700va , smart phone of different make , french curve set of three , scale plastic 24inch , leg shaper wooden , waste bin big 30 litre , pattern punch plastic , pattern notcher metal , pattern hanging stand metal , stand for hanging dresses metal , electric automatic steam press , sewing machine single needle lock stitch industrial model , double needle lockstitch machine industrial model , button hole machine , dummy kid different sizes , cast iron globe valve , cast iron sluice gate valve , slip on forged steel flange 150nb , gas welding table with positioner with fire bricks , diesel engine crdi 4 stroke , mpfi petrol engine , tandem master cylinder with booster , cut section model of mock layout of a motor car , spring tension tester - workshop outfit | quantity - 230
stripping and fitment of air brake components in all kinds of wagons at wagon repair shop, w. c. rly., kota for a period of 12 months.
supply of 1). rotor of 250kw, 3.3kv,1488 rpm squirrel cage induction motor, make ngef, type eavm450m4ex and sr.no.168.095.02 for ash water pump motor. 2). nde side end shield of 250kw, 3.3kv, 1488 rpm squirrel cage induction motor, make ngef, type eavm450m4ex and sr.no.168.095.02 for ash water pump motor. 3). de side end shield of 250kw, 3.3kv, 1488 rpm squirrel cage induction motor, make ngef, type eavm450m4ex and sr.no.168.095.02 for ash water pump motor.
supply of - non invasive hb meter , sample rotor for laboratory , electrolyte machine , uri analyser , electrocardiogram machine , bipap machine , emergency crash cart , portable dental xray , uvc radiation chamber of dental - medical and lab items | quantity - 13
supply of - vacuum concentrator , rotor for the vacuum concentrator , suitable voltage stabiliser for the vacuum concentrator system , microcentrifuge , rotor for the microcentrifuge - supply and installation vacuum concentrator with all items as per bid | quantity - 5
supply of - wire rope set , mka 2 , wear tear set b140 , magnet body set b140 , overhaul set b140 , wear tear set b003 , magnet body set b003 , overhaul set b003 , geared limit switch , current collector carraige , voltage relay , brake control , switching element - supply of critical spare parts of 9 ton demag make crane | quantity - 13
procurement of brake block assembly (shoes) for san locomotives & other consumable material at chp i, v/m , 250 mw, tps, parli v.
refurbishment of released rotors of vacuum pumps of ash handling system
supply of - rotor ss , coupling rod pin , coupling rod bush , shaft , coupling rod ss , rubber starter bounded to ms sleeve 7021 , sling web, 3m,5ton,nyln , rod drill, 40mm,1600 mm , h t nut bolt - boq bid | quantity - 227
supply of spare parts for tetra pak make 10 kl cream separator model no. 3191 from oem/ proprietary basis. (bearing, ball bearing, ball bearing, bushing, sleeve, worm wheel shaft, sleeve, worm wheel 50 hz, spring, ring, ball bearing, ball bearing, bearing ball, break lining, spring)
3rd year (overhauling) maintenance schedule of air brake system make m/s ftrtipl in spic (self propelled inspection car) no. 230052 at rny division/nfr.
3rd year poh maintenance schedule of air brake system of make m/s ftrtipl in spic no. 230001 in tinsukia division
supply of - assy rear brake rh with dust cover , aal , rivet brake lining , switch, air brk,11kv,800a,3p , fixt lght, 110v,60w,l ed,flp , cone, zinc, w by tail rope , thmbl rope, rope capel,19mm , trifor capacity , fan pulley,pv160,4 grv,c sctn - boq bid | quantity - 186
providing, fixing/installation, testing & commissioning of horizontal dynamic rotor balancing machine (minimum 50 kg capacity) complete with pc based measuring system, vfd drive, electrical panel, software, tooling, test rotor, calibration kit, all accessories, foundation drawings, operating manuals on site installation, calibration, training and comprehensive warranty of 24 months at muhammdabad gohna.
providing fixing/installation, testing & commissioning of horizontal dynamic rotor balancing machine (minimum 50 kg capacity) complete with pc based measuring system, vfd drive, electrical panel, software, tooling, test rotor, calibration kit, all accessories, foundation drawings, operating manuals on site installation, calibration, training and comprehensive warranty of 24 months at muhammdabad gohna.
repair and overhauling service - multifunction machines mfm; rotor or armature rewinding with h class insulation of 135 k w d c driive motor; yes; service provider premises , repair and overhauling service - multifunction machines mfm; replacemnet of commutator of 135 kw dc drive motor; yes; service provider premises
supply of - contactor for / rev with double coil, dc88-5 36v, rot switch 1p 2way for rev for(rev/for switch), carbon brush for (1.5kw/2.3 h.p/3.5 h.p./4.7hp), brush rocker assy. for prime mover - 2.3/3.5/4.7 hp, epc switch s/pole on/off ed125 48 x 125a, ignition switch sw (w/spl, master cylinder assly-brakes india make, rar brake wheel cylinder assy, brake shoe with liner - leading, brake shoe with liner - trailing, brake tube accessories, wheel & tyre assy - dia 535 mm x 127 mm width x 5 hole, brake oil dot3, foot pedal assy, gear box oil sae 90, brake switch, lovejoy coupling sw-100, rot switch 1p 2 way for forward/reverse 416111316, brake tube accessories fw43143, hand brake &pin assy je212943, hand brake rod end fw45208, hand brake rod end fw43075, battery traction 296/299/300ah 36v exide make, master cylinder assy, wheel cylinder assy, rotary switch on/off, horn 12v, wheel & tyre assy, epc switch, ignition switch, fuse 8a, horn push button, brake switch, carbon_brush_(1.5 _ 4.7 hp), brake shoe leading, brake shoe trailing, brake tube accessories, spider (sw100), brake oil dot3 (2l), gear oil ep 140 (2l), oil seal axle shaft, steering gear with column assy, sliding seat with cushion, battery cable & plug assy, head light led 12v, light switch (pull type), steering tie rod assy, service charge for palakkad, service charge for pondicherry, service charge for sriperumbudur, frieght for palakkad, frieght for pondicherry, frieght for sriperumbudur, frieght for hvdc pugalur, | quantity - 101.
supply of - break shoe change mirror air filter carburetor chain socket petrol pipe , full pulling power system removing and full service fuel injector system , clutch booster assembly , gear box assy stripping checking all parts, main shaft teeth burning , transfer case mounting bracket , transfer case male and female , removing and fitting charges , door mechanism not work hydraulic and pneumatic system removing us parts , exhaust brake system full service and overhauling , bty cut off switch , u and cv joint , hand break assembly , knuckle bearing with washer and full bush and seals , the pump assy removing stripping and checking all parts injector nozzle , brake lining with rivit , brake drum skimming , front glass wind shield glass , front glass wind shield glass beading , rotary pump removing after service fitting all pipeline connecting brake shoe , door catch , indicator flasher , reverse light switch , popular shaft flange holder , the above parts removing and fitting mechanical and electrical charges , door channel rh , exhaust brake pump and ramp assy repair and service , cabin lifting pump and ramp assy repair and service , spilicul motor new - repair of veh | quantity - 51
corrigendum : work for fabrication, replacement (reshafting) and balancing of rotor shaft of 225 kw, 6.6 kv, hp ash water pump motor of ash handling plant of unit no. 1 and 2, 210 mw, at sgtps, mppgcl, birsinghpur.
supply of - stator part no. 8122 , rotor part no. 8125 , coupling rod part no. 8126 , pin retainer sleeve part no. mr50 , bearing housing ci part no. 8101 , pump housing part no. 8150 - procurement of spares for roto make pumps | quantity - 24
supply of - master cylinder seal kit jm016637,brake liner leading big jm011927,brake liner trailing small jm011928,wc assy 29666040,wheel & tyre assy fw31015, - spares for 4 wheeler battery truck | quantity - 56
supply of - pad kit disc kit , gasket , brake shoe rear , universal joint , oil filter , carburator - oil filter | quantity - 17
supply of - spair parts , break oil , wheel allignment , filter and coolent , ac serive and gas , rdiator service , wheel bearing , gear oil , break shoe , timing belt , spark plug , caliper grease , ac filter - repair of vehilcle | quantity - 94
supply of - sml wiper motor with system , sml salve cylinder assembly , sml clutch master cylinder , sml door catch inner , sml brake master cylinder with booster , sml reverse light switch , sml wheel cylinder assembly , sml fan belt , sml hub oil seal , sml clutch repair kit four in one , sml tail light assembly , sml relay starting , sml combination switch , sml indicator assembly , sml fog light assembly , sml door glass mechanism , sml head light relay , sml self starter assembly , sml alternator assembly , sml head light assembly lh and rh , sml brake light switch , re brake shoe , re kick returning spring , re oil filter , re chain sprocket set , re carburetor assembly , re air filter - spare parts of sml and re | quantity - 64
custom bid for services - repairing of rotor of induction motor marathon make 300kw at srk mine under srk-blg- bnk sub area
supply of vacuum brake related items of 700/1400 hp de locomotives at ct division dspm tps korba east.
supply of - steering tie rod end , steering closures set , front wind shield glass , tariler brake valve , valve , pressure plate - procurement of mt stores | quantity - 8
supply of - clutch plate marksman , pressure plate marksman , self starter tata sumo , release bearing marksman , relay starter solenoid tata 2.5 ton , propeller shaft tata sumo , vane pump assy als , suspension kit complete marksman , brake shoe assy mpv yuvthirath - | quantity - 18
facility management services - lumpsum based - industrial; job work of motor rotor rewinding; consumables to be provided by service provider (inclusive in contract cost)
supply of - valve fuel system delevery valve , injector nozzle , ram assy rep kit , reg elect rear door window rh , driven plate for clutvh , oil pumb with gear , door lock front lh , door lock front rh , water separator assy , brake booster , handle inside lh , elbow pipe to hose , brake shoe assy , wiper motor assy , master cyl power unit clutch , armature , brake booster assy , stopper cable , cover assy clutch , boot gear shift leaver , stator , h and pump - boq 35 | quantity - 46
supply of - rear brake disc pad , front brake disc pad , injector , air filter , actuator of turbo charger assy , self starter , carburator - mt stores | quantity - 12
supply of - hose , spring brake chamber , drying distribution unit , air pressure pipe , armature assy , field coil , caliper assy , kit pad assy front , brush carrier assy , air filter element - hose assy | quantity - 11
supply of brake disc for slab yard cranes hsm-2(e)(1items) comprising of following: - brake disc liner,f/cranes,r.s-8.00.1427 ,
supply of brake disc for slab yard cranes hsm-2(e)(1items) comprising of following: - brake disc liner,f/cranes,r.s8.00.1427
supply of - clutch master cyl assy , knuckle bearing , propeller main shaft , propeller front shaft , propeller rear shaft , acclerator cable , fuel cut on off switch 24v , clutch plate assy , pressure plate , center bolt rear , center bolt front , u bolt , side view mirror , brake pad front , brake pad rear , radiator bush , tandem master cyl assy , fuel filter assy - clutch master cyl | quantity - 75