FILTERS
setting up of 1500 mw/6000 (for 4-hour and >1 cycle ) mwh standalone battery energy storage systems under tariff based global competitive bidding in rajasthan with/without viability gap funding support under boo model.
View Insights
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between tanda road (excluding) to jamaniya (including) from km 101.29 to km 125.92 (length: 24.63 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 41.50 to km 69.60 (including nunkhari station) involving earthwork in formation, embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), viaducts, tunnels, protection works, blt works, p.way track works with contractor's own materials (except new/sh rails), construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, tunnel ohe with rocs, tunnel lighting, tss, sp, general power supply arrangements modifications/conversion to underground for overhead electrical ht/lt power line crossings etc on epc basis in waltair division of east coast railway.
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between jamaniya (excluding) to tirla (excluding) from km 125.92 to km 147 (21.08 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h- beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
construction of 3rd line work including earthwork, blanketing, minor bridges, major bridges, lc work and other miscellaneous works for 25.0t and dfc feeder route of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of chandil- madhukunda section in adra division of south eastern railway on engineering, procurement & construction (epc) mode.
design, engineering, manufacturing, supply, erection, testing & commissioning of 125 mvar statcom at 220kv sagapara substation on turnkey basis including civil works
design, engineering, manufacturing, supply, erection, testing & commissioning of 125 mvar statcom at 220kv tharad substation on turnkey basis including civil works
design, supply, erection, testing and commissioning of 400/220kv equipments and materials on turnkey basis including civil works for 400kv dholera-ii gis substation.
corrigendum : cluster c implementation of standalone battery energy storage system (bess) of 41mw/102.5mwh capacity at uttarkashi, haridwar, roorkee, tehri upcl under capacity charged based competitive bidding mechanism
corrigendum : 400kv transformer package 4tr-22 bulk for 4 x 500 mva, 400/220/33kv 3 ph transformers under bulk procurement of 765kv & 400kv class transformers and reactors of various capacities (lot -8).
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at mavdi road sub division of rajkot city-3 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-18)
construction of doubling of track work including earthwork, blanketing, minor bridges, lc work and other miscellaneous works for 25t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the adra-sanka-rukni doubling project of adra division, south eastern railway on engineering, procurement & construction (epc) mode.
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at nanamava sub division of rajkot city-3 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-17)
construction of 132/33 kv, 2x50 mva gis substation at hathi bhata (ajmer) alongwith associated transmission lines including survey, supply of all equipments/materials, erection (including civil works), testing and commissioning
construction of various 220 kv and 132 kv transmission lines associated with proposed 220 kv gss lohawat including survey, supply of all equipments/materials, erection ( including civil works), testing and commissioning on turnkey basis against specification no. rvpn/ehv/bn-9019002612
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at morbi-road sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-8)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at laxminagar sub division of rajkot city-2 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-12)
corrigendum : design, supply, erection, testing and commissioning for ohe upgradation from existing 1x25kv system to 2x25kv at feeding system with feeder and earthing works in mahabubnagar(mbnr)(incl)-secunderabad(sc)(incl)-medchal(med)(incl) section of hyderabad division under south central railway. total 141 rkm/282 tkm
corrigendum : establishing of 220 kv single circuit between 220 kv gss nph and 220 kv gss vkia (approx. 13km)
design, detail engineering, manufacture, supply, installation, testing and commissioning of 25kv ac traction (rigid ohe), 33 kv auxiliary sub stations(ass) and associated cabling works for underground section of corridor-2 of patna metro rail project
ph&me department - kuppam area development authority (kada) - design & construction of integrated water supply, underground drainage, storm water drainage and underground power supply system for the priority area of kuppam municipality under hybrid annuity model (ham)
corrigendum : cluster b implementation of standalone battery energy storage system (bess) of 23mw/57.5mwh capacity at dehradun (rural and urban) upcl under capacity charged based competitive bidding mechanism
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at kalawad road sub division of rajkot city-3 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-16)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at ranchhodnagar sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-3)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at mahila college sub division of rajkot city-2 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-9)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at sorathiawadi sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-5)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at udyognagar sub division of rajkot city-2 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-13)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at pradyumannagar sub division of rajkot city-2 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-10)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at aji industrial sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-7)
site survey including underground utility verification, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete works for turnkey based contract for conversion of existing overhead lt line network including consumer service lines into under ground cable network using fsp/msp & ring main system at kothariya road sub division of rajkot city-1 division of rajkot city circle under pgvcl with gis mapping / geo urja mapping (developed by guvnl) and asset tagging under gujarat wire free city mission. (package-6)
design, detail engineering, manufacture, sitc of 25 kv ac traction (rigid ohe), 33 kv auxiliary sub stations (ass), associated cabling and scada systems from r. k. ashram to kartavya bhawan of phase-v(a) delhi mrts project.
construction of 132/33 kv, 2x80 mva gis substation at shiv enclave (sanganer) (jaipur) alongwith associated transmission lines including survey, supply of all equipments/materials, erection (including civil works), testing and commissioning
corrigendum : construction of 132 kv gss deepla (sedwa), (district- barmer) along with associated line, bays, and capacitor bank and 132 kv gss gohar ka tala (dhanau) (district - barmer) along with associated line, bays, and capacitor bank under bn- 9016002603.
design, supply, erection, testing and commissioning of 2x25 kv auto-transformer (at) feeding system, including 220/55 kv makkajipalli (mkj) traction substations, dharmavaram (dmm) sectioning posts (sps), nagasamudram (ngm) and penukonda (pkd) sub-sectioning posts (ssps), in bangalore-dharmavaram section in bangalore division of south western railway
supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
working survey, soil investigation, design, build & operate(with trial run of 3 months) contract for providing, supplying, lowering, laying & jointing rising main, gravity main and distribution pipeline, supply, installation, testing & commissioning of hscf/multistage pump with associated mechanical and electrical equipments, instruments & accessories, clear water sump, pump house, staff quarter, compound wall, approach road (r.c.c) at various hw/shw/village for 174 villages of missing link of kaprada & dharampur with 05 years of comprehensive o&m of entire scope of work. dist.: valsad
corrigendum : construction work of 132 kv dc phagi sez oh and underground cable line and associated bays and 132 kv gss pachewar alongwith line 132 kv dc malpura to pachewar and capacitor bank and associated bay on supply and etc basis under bn9015002604
corrigendum : construction of 220 / 132 kv gss budhadeeth (distt.- kota) on turnkey basis under bn-9018002605 - construction of 220/132 kv gss budhadeeth (distt.- kota) including survey, supply of all equipments/materials, erection (including civil works), testing and commissioning on turnkey basis under bn-9018002605
corrigendum : supply of - supply of 765kv, 330 mvar reactors - | quantity - 4
supply, erection, testing and commissioning of i) up-gradation of 132kv switching station to 220-132-33kv substation at pedana with double bus and bus coupler arrangements ii) erection of 220kv dc line from 400kv gudivada ss (under construction) to 220kv pedana ss in krishna district on turnkey basis
corrigendum : supply of - supply of 03 nos. 400kv, 125mvar reactor - | quantity - 3
corrigendum : supply of 11kv, 2mvar capacitor banks with associated equipments
design, supply, erection, testing, and commissioning of power supply installation i.e. 01 tss, 02 ssp & 01sp on 2 x 25 kv, ac 50hz ohe installations system in wadsa-gadchiroli new line section of nagpur division over s.e.c. railway.
providing 10 mvar/20 mvar capacitor banks along with associated bay equipment, control & protection panels, at various 66 kv and 110 kv sub-stations under kalaburagi, bengaluru, tumakuru and hassan operation zones of kptcl on total turnkey basis, including supply of all materials/equipments and erection (including dismantling & civil works) of all materials/equipments, testing and commissioning
design, supply, erection, testing, and commissioning of 2 x 25 kv, ac 50 hz ohe electrification system in barakhera (excl.) to ajaygarh (incl.) section in khajuraho panna new bg rail line section of jabalpur division, west central railway, jabalpur in connection with lalitpur - singrauli new bg rail line project.
corrigendum : repair, maintenance, and installation of plant systemsequipments (version 2) - ofc routes,telephone exchanges, bts sites; combined maintenance of ofc routes,media equipment,bts,towers,power equipment and infrastructure in sambalpur ba; service prov..
supply, installation, testing & commissioning for shifting / modification of 66kv electrical utilities of tpddl from indian railway line to haryana border section of rithala kundli corridor of delhi metro phase iv.
design, supply, erection, testing & commissioning of 2x25kv, 50hz single phase a.c. traction overhead equipment with 65 sq.mm catenary and 107/150 sq.mm contact wire, lt supply transformer stations including modifications to the existing ohe in view of proposed doubling between alamapur road -dupadu section with associated yard modifications on mahabubnagar-dhone section & modification of 1x25 kv sp at kotla to suit double line in hyderabad division of south central railway