FILTERS
outsourcing of comprehensive consultancy services for preparation of structural design & drawings conforming with is 1893: 2016 for earthquake resistant design of structures and preparation of detailed estimate for both civil and electrical works for - construction of himalaya kanya housing project, phase-iv, at siliguri bhakti nagar, dabgram, sheet no. 4, jl no. 2, p.s. bhakti nagar, district jalpaiguri
View Insights
12(2nd call) of 2026-27 of sse/wbswc - preparation of as built drawings of existing infrastructure and obtaining provisional and final noc for fire and emergency services department for the godown of malda warehouse.
12(2nd call) of 2026-27 of sse/wbswc - preparation of as built drawings of existing infrastructure and obtaining provisional and final noc for fire and emergency services department for the godown of memari-i warehouse.
12(2nd call) of 2026-27 of sse/wbswc - preparation of as built drawings of existing infrastructure and obtaining provisional and final noc for fire and emergency services department for the godown of bankura warehouse.
preparation and submission of drawing, plan, vetted estinates including execution of the retrofiting of the heritage mahtab manzil, bu as per approved proposal on turnkey basis under quality and cost based selection (qcbs) methodology ( 2nd call)
consultancy services for preparation of dpr, designs and drawings and allied works including net zero certifications for the work of construction of permanent office building for cyberabad municipal corporation land situated adjoining kotha kunta in sy.no.5 of 11 part and 5 of 12 part, izzath nagar village, serilingampally mandal, ranga reddy district
appointment of pmc for improvement of last mile connectivity in the economic and it hub of hinjewadi, including preparation of dpr, detailed estimates, drawings, geometric designs and cross-sections as per urban street design guidelines, tender doc.
inspection report alone with ndt test, measurement of reinforcement bar diameter reduction, depth of carbonation content test and preparation of structural drawing as per report at mangrove interpretation centre building at sajnekhali, south 24 parganas.
inspection report alone with ndt test, measurement of reinforcement bar diameter reduction, depth of carbonation content test and preparation of structural drawing as per report at mangrove interpretation centre building at sajnekhali, south 24 parga
custom bid for services - soil investigation and arch and str drawing consultancy services for provn of trg for integrated air defence combat simulator (iadcs) at mil station jamnagar
design, drawing, estimate and construction of gray water management plant capacity 30 kld gray water management plant with required civil work as mentioned in the scope of work at khelar gajendra high school,khelar gp, kharagpur-i block
design, drawing, estimate and construction of gray water management plant capacity 30 kld gray water management plant with required civil work as mentioned in the scope of work at barkola vivekananda high school, kharagpur-i block,barkola gp - design, drawing, estimate and construction of gray water management plant capacity 30 kld gray water management plant with required civil work as mentioned in the scope of work at barkola vivekananda high school
design, drawing, estimate and construction of gray water management plant capacity 30 kld gray water management plant with required civil work as mentioned in the scope of work at siromoni bm high school,siromoni gp
design, drawing, estimate and construction of gray water management plant capacity 20 kld gray water management plant with required civil work as mentioned in the scope of work at panchkhuri desbandhu high school,panchkhuri g.p
expressions of interest (eoi) are invited from qualified parties for the second phase of dpr preparation for project no. 395/27 (municipal office and shopping complex). this project is being implemented as a 'spin-over' initiative under the adoor municipality's 2025-26 annual plan, with the municipal secretary serving as the implementing officer: work covers the completion of the office and bus stand complexes currently under construction via municipal contracts. requirements include civil works (excluding architectural drawings for floors 1 through 3 of the municipal office), electrical, plumbing, and sanitary installations, landscaping, bus stand and parking yards, internal partitioning, vetted structural drawings for new constructions, soil investigation reports, and furniture layouts. additionally, the project encompasses the council hall (dais and seating), electronic cctv systems for various office sections, it cabling, fire safety systems, intercoms, lifts, and gates. competitive expressions of interest (eoi) are invited from experienced, authorized firms or individuals for the preparation of detailed project reports (dprs)including detailed estimates (via price software) and technical sanction procurementcovering the design (revised plans, working drawings, 3d exterior/interior architectural views, color coding, and furniture/wall layouts) and inspection of components such as compound walls, security cabins, additional drainage systems, drinking water storage, electrification (including backup and solar systems), and wastewater management systems, in accordance with the kerala municipality building rules and subject.
consultancy services phase 1 and 2 for mumbai port - consultancy services phase 1 and 2 for mumbai port
wbhb/dd(ew)-ii/nieq-14/2026-27 - outsourcing of consultancy services for comprehensive consultancy for development of layout for plots of different categories with associated infrastructural facilities at the 7.05 acres land of wbhb at siliguri satellite township project jalpaiguri
providing consultancy services for architectural, structural and mep services and other services design and drawings for the work of upgradation of sri jayadeva hospital 400 bed to 600 bed at sjicsr campus krs road, mysuru. (including gst)
earth work for strengthening of bank & dowel of main canal (0-2.0 km) work includes: excavation of earth, loading, carriage upto 1 km, unloading, lead of 200 mtr and 1.8 mtr lift with manual compaction, dressing making profile but excluding mechanical compaction & royalty will be applicable from time to time on govt. order and work will be done as per the l-section and cross section drawing & survey report provided by the department including all cost of required material, labor and t & p for proper completion of work as per direction engineer -in charge at main canal of nagapur pump canal kanpur nagar. (hindi image)
survey, investigation, preparation of design & drawings, installation, testing and commissioning of lift irrigation scheme consisting intake canal, jack well cum pump house, pumping machinery, rising main, bleeders and manifolds, pipe distribution network with ms/hdpe/o-pvc pipes including structures all along the pipe distribution network for providing irrigation facility to 1765.0 ha of left out area in jamakhandi and mudhol taluks, bagalkot district including filling up of 7 no mi/zp tanks by lifting water from krishna river under mareguddi lift irrigation scheme and filling of galagali barrage by lifting water from downstream to upstream from krishna river including supply of spares, accessories and tools including operation and maintenance of the entire system for five years from the date of successful commissioning of the entire system on turnkey basis
outsourcing of consultancy services for comprehensive consultancy for development of layout for plots of different categories with associated infrastructural facilities at the 7.05 acres, more or less, land of wbhb at siliguri satellite township project (sstp), jalpaiguri, mouza binnaguri, jl no. 3, p.s. rajgunj, district jalpaiguri.
obtaining dtcp approval for the building proposed in expansion of tnpl nursery and primary school at tnpl unit ii (phase iii)
custom bid for services - consultancy services for structural and architectural drawing
providing services for geotechnical investigation structural design good for construction drawings site development design and drawing including mechanical electrical plumbing and fire fighting design and drawings for cost of pucca school building on
r/16/ct-tender/26-27 (2nd call) - preparation of detail project report (dpr) with architectural drawings and structural drawing and detailing (reinforcement detailing) inconsideration with demolition of the existing hostel building and construction of the new hostel building.
conducting differential global positioning system (dgps) survey & demarcation forest in area of thane wildlife forest division - 1) visiting given forest site, taking points of existing boundary, details in forest area like allotment, structure plot, road, transmission line, water bodies, high tide level and low tide level etc. of forest area by differential global positioning system (dgps). 2) collecting old survey number map & tipan phalani etc. essential record from concern land record office & govt. office 3) fixing the forest boundary on site after verification by concern forest authority as per land record survey number map & tipan record etc. 4) preparing the scaled color hard copy of three sets and soft copy of auto cad drawing of survey map including details of allotment, structure, encroachment, forest boundary etc. 5) providing the scaled drawing on google image hard copy of three set & soft copy of drawing in kml format
request for expression on interest eoi for idendtification of development agencies for development of drawing, specifications, process, tools and fixtures, manufacture of spares for aero engine application
construction of recreatio club cum gynmasium along toilet facilities at icar-ciwa, bhubaneswar. sh- preparation and submission structural design and drawings.
inviting consultant for preparation of dpr, design and drawing and taking technical sanction from respective department under municipal council warora
consultancy services for detailed survey, investigation, preparation ofdesign, drawings, estimates, detailed project report, package estimate, dtp for intake structure, pumping machineries,electrical works,delivery chamber,raising main with surge protection works etc. with detailed cost estimates for supplement the water to suffering atchkat area around 3000 acres of tail end portion (beyond 3.25km) of ittigi branch of sugur distributory under rbllc by lifting water from tungabhadra river near i
design, consultancy and preparation of dpr/boq along with all architectural plans/ survey/ soil investigation/ analysis/ structural drawings/hvac/ for construction of various buildings under the territorial jurisdiction of rnb division rajouri.
investigation boq preparation of drawing for peripheral road and - investigation boq preparation of drawing for peripheral road and connecting ramp at ntpc barh ash dyke
custom bid for services - hiring of consultancy services towards preparation, design of 3d drawings for renovation of sagarika
investigation boq preparation of drawing for peripheral road and connecting ramp at ntpc barh ash dyke
providing consultancy services for preparation of plans, elevations, architectural drawings, structural designs and drawings and detailed cost estimates for construction of various buildings at sri venkateswara swamy vari devasthanam, dwaraka tirumala (chinna tirupathi), eluru district
engagement of consultant for preparation of design, drawing, dpr, tender documentation and proof checking for the up-gradation of kajauli pump house, construction of wtp phase-2 at sinpur, and laying of rising main at sas nagar
hiring of consultancy for prep of structural drawing of work provision of 03 x single offr accn - | quantity - 1
corrigendum : cs for ie for the dev. of 4/6l of access controlled kanpur kabrai 0 (kanpur ring road) to design km117.700 in up (sec1)and overlay/strengthening other road safety and imp.works existing kanpur kabrai sec.7.430 to 130.100 (0 to 123.860)nh 34 in up - section-1: development of 4/6 lane of access controlled kanpur - kabrai greenfield highway, starting from design km 0+000 (kanpur ring road) to design km 117+700 (near village kabrai in district mahoba) in the state of uttar pradesh and section-2: overlay/strengthening, other road safety and improvement works on existing kanpur - kabrai section from km 7+430 to km 130+100 (design chainage 0+000 to 123+860) of nh-34 (old nh-86) in the state of uttar pradesh on dbfot pattern at bot (toll) mode under nh(o).
corrigendum : independent engineer services for development of the ropeway system from sonprayag to kedarnath in the state of uttarakhand on dbfot mode
corrigendum : cs for ie services for development of 4 lane badvel to nellore highway from badvel gopavaram village on nh nh-67 (ch.630.960) to guruvindapudi village on nh-16 (ch.739.094) in andhra pradesh on build-operate-transfer (toll) mode for a tl 108.134 km.
engineering, procurement and construction (epc) agreement for construction of 3rd and 4th railway line adjacent to the existing broad gauge (bg) electrified double line including civil engineering works, track works, signalling & telecommunication works, over head electrification, electrical general services & all other allied works between delhi subjimandi (szm) to ambala cantt (umb) in delhi & ambala divisions of northern railway
corrigendum : independent engineer services for development of link / connector corridor between national highway-19 (nh-19) and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city package 2 from km 7+926 to km 18+560 (total length is 26.039 km including mcw/fob/loop/ramp) in the state of uttar pradesh on hybrid annuity mode.
corrigendum : independent engineer services for development of link / connector corridor between national highway-19 (nh-19) and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city package 1 from km 0+000 to km 7+926 (total length is 20.000 km including mcw /loop/ramp/link road) in the state of uttar pradesh on hybrid annuity mode.
corrigendum : independent engineer services for development of a link / connector corridor connecting the national highway-31 (nh-31) & varanasi ring road, along the river varuna for decongestion of varanasi city package 1 from km 0+000 to km 11+744 (total length is 28.498 km including mcw/flyover/loop/ramp/link road) in the state of uttar pradesh on hybrid annuity mode.
corrigendum : independent engineer services for development of the ropeway system from govindghat to hemkund sahib ji in the state of uttarakhand on dbfot mode.
corrigendum : ie services for const of 6l gf ac indore eastern bypass starting from design km 64.000 near pirkaradiya vill and ending at design km 113.000 on nh 347bg near vill simrol datoda pkg1 of indore n dewas district in mp on ham mode l 49.00 km - independent engineer services for construction of six lane greenfield access-controlled indore eastern bypass starting from design km 64+000 near pirkaradiya village and ending at design km 113+000 on nh 347bg near village simrol/datoda (package - 1) of indore & dewas district in the state of madhya pradesh on ham mode (length - 49.00 km).
notice inviting expression of interest for selection of the pmc project management consultant for mrc mega re development of colony project at sbi colony nerul navi mumbai
expression of interest (eoi) from reputed & experienced project management consultancy firms for participating in the selection process & engagement as project management consultant (pmc) for an epc project regarding re-development & construction of high-rise commercial & residential towers, its amenities, infrastructure works, interiors, etc. at sbis 25 acres colony, on plot no. 1 & 2, sector-13, nerul, navi mumbai.
corrigendum : ie services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o
corrigendum : independent engineer services for development of a link / connector corridor connecting the national highway-31 (nh-31) & varanasi ring road, along the river varuna for decongestion of varanasi city package 2 from km 11+744 to km 19+420 (total length is 14.720 km including mcw/loop/ramp) in the state of uttar pradesh on hybrid annuity mode.
corrigendum : consultancy services for ae for supervision of construction of 4-lanning of ujjain-jhalawar section of nh-552g from ch.0.000 village khilchipura to ch.86.500 village aakli-kadiya (package-1) in madhya pradesh on epc mode under nh(o).
corrigendum : part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
corrigendum : ie for const of 6l gf ac indore e by km113.00 on nh 347bg vill simrol datoda vill and at km139.630 nanded vil pkg2 of indore l26.630 km n rnu of nh52 ex.18.000 khandwa vill to km27.00 ahilyapur vil 4lto6l pkg2 of indore l9.00 km in mp nho tl35.630km
corrigendum : design andconstruction of elevated viaduct and 12 elevated stations (including architectural finishing) viz. collectorate, panipech, ambabari, chomu puliya, vidhya nagar sec-2, vidhya nagar, vki road no 5, vki road no 9, vki road no. 14, harmada, harmada ghati & todi mod under jaipur metro phase- ii mrts
corrigendum : supervision consultancy services for rehabilitation and upgradation of existing road to 2-lane with paved shoulders configuration in purulia to chandil section of nh-18 including purulia bypass in the states of west bengal and jharkhand
corrigendum : engineering, procurement and construction (epc) agreement with schedule g-1 for third line track between manikpur (excluding) to iradatganj (including) (ch: 1257.180 to 1340.820) including electrification & signaling works along with construction of rob on lc no. 404/c2, 406/2t, 407/2e & 418c/2e and rub in lc no 426 in connection with manikpur-iradatganj 3rd line project of north central railway
corrigendum : consultancy services for ae for supervision of construction of 4-lanning of ujjain-jhalawar section of nh-552g from ch.86.500 village aakli-kadiya to ch.159.263 jhalawar (junction with nh52) (package-2) in madhya pradesh and rajasthan epc nh(o).
1) design and construction of elevated viaduct and 11 elevated stations (including architectural finishing) viz. b2 bypass circle, durgapura, gopalpura, gandhinagar, nehru place, ram bagh circle, narayan circle, sms hospital, ashok marg, government hostel and khasa kothi (phase-ii), architectural finishing works of 10 stations viz. prahladpura, manpura, bilwa kalan, bilwa, goner mod, sitapura, jecc, kumbha marg, haldighati gate and pinjrapole gaushala; modification of part operational corridor of phase-1 and constructing khasa kothi (phase-1) station under jaipur metro phase- ii mrts, 2) design and construction of elevated viaduct and 12 elevated stations (including architectural finishing) viz. collectorate, panipech, ambabari, chomu puliya, vidhya nagar sec-2, vidhya nagar, vki road no 5, vki road no 9, vki road no. 14, harmada, harmada ghati & todi mod under jaipur metro phase- ii mrts.
development of satellite township phase-l, package 3 (group housing 02) including allied works at rakh gund aksha, bemina, srinagar (j and k) on design, engineering, procurement and construction (epc) basis with operation and maintenance of 2 years.
corrigendum : development of satellite township phase-l, package 3 (group housing 02) including allied works at rakh gund aksha, bemina, srinagar (j and k) on design, engineering, procurement and construction (epc) basis with operation and maintenance of 2 years
corrigendum : project management consultancy services for construction of new integrated terminal building and allied works including extension of apron at srinagar airport (2nd call)
consultancy services for authoritys engineer for supervision of construction of intermediate lane of pango to jorging road from design km 40+000 to design km 82+060 section of frontier highway (nh-913) (design length: 42.06 km, package-ii, greenfield alignment) in the state of arunachal pradesh on epc mode.
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house, staff quarter, compound wall, supplying and erecting pumping machinery including all electro-mechnical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (rhs) for industries (gidc) and rural areas of bharuch and vadodara districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch
corrigendum : selection of consultant for preparation of detailed project report for the preparation of detailed project report (dpr) for extension, renovation and modernisation (erm) of salaulim irrigation project (sip) in sanguem taluka, goa
appointment of pgms agency for providing project general management services for chief administrative officer (construction), south coast railway, visakhapatnam, a.p.
independent engineer services during tolling, operation, maintenance and transfer of lucknow ayodhya section (from existing km 15.400 to existing km 137.970) section of nh-28 (new nh27) in the state of uttar pradesh.
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house with panel room, staff quarter, compound wall, office building, supplying and erecting pumping machinery including all electro-mechanical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (lhs) for industries (gidc) and rural areas of bharuch and surat districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch & surat
providing project general management services for various constructionsites/sections for new line, doubling, bypass line, rob/rubs projectsbeing executed by construction organization in the jurisdiction of northwestern railway.
request for proposal (rfp) for providing project general management services for new line, doubling, multitracking and other projects in construction organization under cao/con of east coast railway for different field offices/ hq office and ongoing projects under cao/con/bbs
corrigendum : consultancy services for ae for supervision of construction of a sixlane external port connectivity road from the junction of nh65 and nh216 to machilipatnam port via machilipatnam bypass section of nh216 in the state of andhra pradesh
corrigendum : request for proposal (rfp) for providing project general management services (pgms) for various projects of construction organization under jurisdiction of chief administrative officer (construction), central railway.
engineering procurement and construction (epc) contract for construction of new railway line from rowghat - jagdalpur(140kms) package- i from ch 12+700 to 42+600 from kurkanar to bhanpuri excluding kurkanar station and including bhanpuri station in connection of dallirajhara - rowghat - jagdalpur new railway line in the state of chhattisgarh.
detail design procurement construction testing and commissioning of extension to vidhan bhavan at nagpur construction of new adjoining administrative building part 1 at civil lines nagpur on epc basis
request for proposal (rfp) for providing project general management services for construction organization, south western railway.
request for proposal (rfp) for providing project general management services for new line, multitracking, gauge conversion, electrification and other important works etc. in construction organization under cao/c/adi of western railway for a period of 60 months.
corrigendum : detailed project report for gis based storm water master drainage plan for rudrapur city in district u.s. nagar (phase-1)
request for proposal (rfp) for providing project general management services for cao construction - northern railway.
corrigendum : appointment of pgms agency for providing project general management services for cao construction unit south central railway, secunderabad
corrigendum : request for proposal (rfp) for providing project general management services (pgms) for office of cao/con and allied offices for a period of next 5 years in connection with new bg railway line/gauge conversion/ multitracking/ doubling projects of construction organization, north eastern railway.
dpr consultancy services for construction & redevelopment of green park international cricket stadium at district kanpur, u.p. on epc mode.
design, engineering and procurement for construction work of new district jail (2000 prisoner capacity) at district moradabad, uttar pradesh, india on epc mode, design, engineering and procurement for construction work of new district jail (2030 prisoner capacity) at district kanpur nagar, uttar pradesh, india on epc mode, design, engineering and procurement for construction work of new district jail (574 prisoner capacity) at district bhadoi, uttar pradesh, india on epc mode, design, engineering and procurement for construction work of new district jail (552 prisoner capacity) at district lalitpur, uttar pradesh, india on epc mode, design, engineering and procurement for construction work of new district jail (1056 prisoner capacity) at district auraiya, uttar pradesh, india on epc mode
corrigendum : planning, designing, engine... - planning, designing, engineering, procurement, construction, installation, testing, commissioning of 50 mld capacity common effluent treatment plant (cetp) based on physico-chemical, biological (extended aeration process)
corrigendum : hiring of consultants - milestonedeliverable based - pm- setu - selection of anchor industry partner (non-hiring service) for cluster-15 (hub iti, (m) kadapa and 5 spoke itis) - andhra pradesh state; ppp and financial modelling, ppp expert, organiza..
corrigendum : detailed project report for gis based storm water master drainage plan for khatima city in district udham singh nagar
electro-mechanical works of 2x36 mw tiuni plasu hep which includes detailed design, engineering, manufacture, quality assurance, quality control, shop assembly, shop testing, supply, transportation, insurance till commissioning, delivery at site, site storage & preservation, erection, testing and commissioning, performance testing, field acceptance testing, training of employers personnel, handing over and fulfilment of guarantee for the electromechanical plant, on epc (engineering, procurement & construction) basis
corrigendum : hiring of consultants - milestonedeliverable based - selection of an anchor industry partner aip for upgradation of industrial training institute under the national scheme pm-setu for gorakhpur cluster in the state of uttar pradesh; selection of an ..
corrigendum : hiring of consultants - milestonedeliverable based - selection of an anchor industry partner (aip) for upgradation of industrial training institute under the national scheme pm-setu for lucknow cluster in the state of uttar pradesh; selection of an ..