Businesses Supplying Terminal Box Can Track Every Active And Upcoming Terminal Box Tender On Tender247, Sourced From Official E-Procurement Portals Nationwide. Tenders In This Category Typically Specify Quantity, Technical Or Quality Specifications, Delivery Schedule, And Applicable Quality Or Compliance Standards Relevant To The Item. Tender247 Tracks Terminal Box Tenders Closely, So A Search Returns The Issuing Organization, Tender Value, Emd, And Submission Deadline Without Visiting Multiple Portals. Each Terminal Box Tender Listing Includes The Tender Reference Number, Issuing Organization, Estimated Value, Emd, And Bid Submission Deadline. Suppliers Of Terminal Box Can Register On Tender247 For Real-Time, Category-Based Notifications And Never Miss A Deadline.
FILTERS
Category: terminal box
Live Terminal Box Tenders 2026
161 |Bid Value:₹ 15.00 Lakh |EMD:₹ 30.00 K |23-09-2026 4 Days Left|T247 ID-104163753
servicing calibration and complete overhauling of 33 kv ht breaker vacuum type sf6 gas operated breaker of 1600 amp rating outdoor type mounted in 33 kv switch yard of existing make ie crompton greaves typemodecapacity by taking out 33 kv trolley from ht panel after switching off electric supply checking of all mechanical electrical control system for proper functioning eg spring charge system triping system remote operation indication system upward-downwardin-out movement of ht 33 kv breaker trolley etc including diassembling of operating mechanism parts well cleaning with petrol and crc-226 and replacing unserviceable spare parts reassembling of parts including well cleaning the complete panel board main busbar decarbonizing all joints busbar cts pts spouts metal parts applying the proper lubrication greasing with ap-3 grease and making 33 kv breaker perfect operating in manual and electric mode and calibration checking of indoor control panel of 33 kv circuit breaker by chechingh of tripping system through idmt over current and earth fault relay at plug setting through primary current injection method to ensure proper function of trip coil control circuit etc during fault condition setting by expert from authorised engineer and agency of authorised company of circuit breaker including submission of calibration certificate complete all as specified and directed note- replacement of unsv spare parts required to make 33 kv circuit breaker functional will be measured and paid separately as supply fixing under respective items, sf tnc control switch complete all as specified and directed, sf panel heater thermostat switch complete all as specified and directed, sf closing coil complete all as specified and directed, sf auxillary relay for buchholz relay oil temp winding temp trip 24110v dc as per exsting complete all as specified and directed, sf master relay 24110v dc as per existing complete all as specified and directed, sf remote local switch as per exsting complete all as specified and directed, supply fixing connecting and testing spring charging motoruniversal motor for outdoor type 33 kv vcb operated on 230 volts ac dc with charging time less than 15 sec of approved rating complete all as specified and directed by eic make - delco or equivalent make as approved by age i, supply and fixing of 33 kv 50 hz single phase oil filled inductive potential transformer outdoor type ratio - 33sqrt3110sqrt3 two secondary windings voltage factor - 12 continuous 15 for 30 sec creepage 900 mm windding - 1 class-10 100 va suitable for 33 kv complete all as specified and directed by engr-in-charge, sf in replacement vaccum interrupter unit of 33 kv out door type circuit breaker complete with insulator and assembly 630 amps rating all including assembling testing and commissioning at site complete all as specified and directed, supply and fix in replacement auxilary relay 110-250 volt dc suitable for over current earth fault switch gear protection complete all as specified and directed make- alsthom model no- vaa21zg8502fm or technocommercialy equivalent as approved by agei, supply and fix in replacement of 33 kv numerical 3 phase over current 1 earth fault switchgear protection relay with instantaneous high set and programmable output to simplify feeder protection wiring etc complete and testing on completion make- crompton model no cgl14c or technocommercialy equivalent as approved by agei, supply and fixing testing commisioning of electro mechanical type under overvoltage protection relay for 11 kv of make- alstom or equivalent make including neccesary wiring complete all as specified and directed note all tp accesories for testing is carried out by contractor and no extra payment to be done for testing, supply and refilling of sf6 gas suitable for ht 33 kv breaker complete all as specified and directed, sf in replacement indication lamp led type red or yellow or green or blue colour suitable for 24 v to 100 volts dc as required at site complete all as specified and directed by eic, supply and fix in repair ampare meter ammeter with digital display suitabale for measuring 33 kv electrical parameters fixed in existing panel board etc complete all as specified and directed make- secureaeschneider, supply and fix in repair voltmeter with digital display suitabale for measuring 33 kv electrical parameters fixed in existing panel board etc complete all as specified and directed make- secureaeschneider, sf in repair of strip type heater 4060 watt approx 46 in length including replacement of burnt internal wiring thermostat cut out complete all as specified and directed, ml for repair testing of control cablewiring between 3311 kv vcbs and power transformers including replacement of unserviceable and damaged cablewire with suitalbe size with connector and thimble complete all as specified and directed note control cable made up of copper will be measured and paid separately, sf in replacement of us control cable with copper conductor pvc insulated sheathed armoured of size 15 sqmm 8 core complete all as specified and directed, sf in replacement of us control cable with copper conductor pvc insulated sheathed armoured of size 15 sqmm 4 core complete all as specified and directed, servicing and maintenance of floating cum boosttrickle battery charger bank cum tripping unit for properly working on input voltage 230 v ac and output voltage 24 v dc 120 amp including replacement of us indicating lamp and meter complete all as specified and directed, supply fixing in replacement of rechargeable sealed lead acid battery maintenance free of capacity 2 volt 100 ah for breaker panel charger to provide 24 v dc supply to 33 11 kv vcbs complete all as specified and directed, servicing calibration and complete overhauling of oltc on load tap changer of 3150 kva 33kv11kv transformer of make crompton greaves after switching off electric supply checking of all mechanical electrical control system for proper functioning eg spring charge system triping system remote operation indication system upward-downwardin-out movement of tap changing mechanism oil level and winding condition heater assembly gears movements etc including diassembling of operating mechanism parts well cleaning with petrol and crc-226 and replacing unserviceable spare parts reassembling of parts including well cleaning the complete decarbonizing all joints busbar cts pts spouts metal parts applying the proper lubrication greasing with ap-3 grease and making oltc perfect operating in manual and remote control mode and calibration checking of indoor control panel rtcc remote tap changer control panel by checking of tripping system and wiring of tap changer on remote and manual mode for increace of tap and decrease of tap positionsthrough avrautomatic voltage regulating relay relay and to ensure proper function of tap changing mechanism by expert from authorised engineer and agency of authorised company of circuit breakerand transformer including submission of calibration certificate complete all as specified and directed note- replacement of spare parts required to make 33 kv oltc of 3150 kva transformer in functional condition will be measured and paid separately under respective items, supply fixing and testing of automatic voltage regulating avr relay control assembly work on aux supply 90v-260v acdc and pt supply -110 volt complete of on load tap changer control rtcc remote tap changer control panel of 3150 kva 33kv11kv transformer of make cromton greaves complete all as specified and directed, servicing and maintenance of three phase induction motor of capacity 13 hp 415 volts 50 hz along with servicing of gear sets used in oltc of 3150 kva transformer alongwith servicing of mechanical movable parts and accessories of tap changing mechanism on manual and remote mode including checking of contactors fuses and thermostatswithces complete all as specified and as directed, sf in replacement pin type porcelain vitreous white brown or green insulator including one galvanised mild steel spindle two galvanised iron washers and one galvanised iron nut 150mm height 150mm dia for 33000 volts grade complete all as specified and directed, sf in replacement ht 33 kv post insulator including fixing arrangements complete all as specified and directed, ml for disc type insulator porcelain vitreous in single disc assy for tension with tension clamps for conductors working pressure 33000 volts of specified size complete all as specified and as directed, supply and install ht 33 kv630 amp ht bushing insulator including fixing arrangements for 315 mva transformer complete all as specified and directed, ml in replacement spindle for pin insulator suitable for 33000 volts grade complete all as specified and as directed by engr-in-charge, ml for servicing repairs to air-break switch isolator off load rotating type 33 kv 800 amps to 1250 amps capacity with proper alignment of isolator rotating blades with fixed contact jaws arcing horns applying petrolium jelly to moving mechanism cleaning and lubricating to isolator gear box assembly tightening all nuts bolts and clamps of jumpers etc repairing to isolator gear box assembly and making in proper serviceable condition for smooth functioning testing and commissioning on load complete all as specified and directed, supplying and fixing in repairs malemoving contact rotating blade of hde copper silver plated of air brake off load isolator switch rotating type 33 kv 1250800 amps capacity with all fixing nuts bolts etc complete all as specified and directed, supplying and fixing in repairs fixed contacts made of hde copper silver plated of air brake off load isolator switch rotating type 33 kv 1250800 amps capacity with all fixing nuts bolts etc complete all as specified and directed, supplying and fixing of terminal pad for air brake off load isolator switch rotating type 33 kv 1250800 amps capacity complete all as specified and directed, supply and install ht 33 kv drop out fuse with double stack channel type insulator including fixing arrangements all as specified and directed, supply and install ht 33 kv jaw clamp including fixing arrangements all as specified and directed, ml for lightining arrester expulsion type set of three as per existing makemodelcapacity to be fixed on existing structure complete with all fitting transmission class discharge capacity 65 kilo amps suitable for 33000 volts incl taking down old one etc complete as specified and directed, sf in replacement pg parallel groove clamps as per is- 5561 2018 for 33 kv11 kv acsr conductors complete all as specified and directed by eic, supply installation testing and commissioning in replacement of air- break off load line isolator switch rotating type manually gear drive mechanism operated highest system voltage 36 kv rated current 1250 amps triple pole with earthing device each pole consist of insulating pedestals 03 nos on galvanized steel base as per bss is incuding rotating blade of hde copper and fixed contacts of same material spring loaded arcing horns of adequate section to brake magnetizing current of transformer as directed with adequate 50mm dia gi operating pipe for operation from ground level and operating handle complete with both off and on positions complete all as specified and directed, disconnecting all the electric connections from ht and lt side incl earthing terminals from the transformers and taking down transformer from plinth by using cranehydra and opening of top cover for visual inpection for the tap changer and winding condition or as required at site and reinstall at existing location including testing of 3311 kv capacity 315 mva all as specified and directed by engineer-in-charge note- replacement of unsv spare parts required to make transformer functional shall be measured and paid seperate as sf under respective item of work, supply fixing of hv bushing with terminal rod complete all as specified and directed, supply fixing of lv bushing with terminal rod complete all as specified and directed, labour for repairs to the leaks of transformer from tap switch fins any pats of body by replacing gasket seal or repairs to the leaks of transformer body fins by welding brazing etc complete all as specified and directed, ml in repair replacement of prv pressure relief valve of outdoor transformer capacity 3150 kva 33kv11 kv as existing size model complete with its connected wiring and control all as specified directed by engr-in-charge, ml for servicing of buchholz relay of outdoor transformer capacity 3150 kva 33kv11 kv as existing size model complete by connected wiring oil levels lekage arresting and checking of oil level complete all as specified directed by engr-in-charge, sf of breather assembly transparent type filled with silica gel of fresh blue colour suitable for transformer of capacity up to 3150 kva complete all as specified and directed, supply fixing of circular oil level gauge indicating meter with complete float valve assembly for fixing on conservator tank of 3150 kva 33kv11 kvtransformer complete all as specified and as directed, dehydrationfiltration of transformer oil of transformer and oltc by centrifuging machine without disturbing electric supply by heatingfiltration of oil to achieve dielectric strength not less than 60 kv when measured at 25 mm gap for one minute and topping up to oil level mark at the conservator complete all as specified and directed by engineer-in-charge note- i the contractor shall make his own arrangement for centrifuging machine motorised break down kit and all tp and manpower required at site centrifuging and topping up etc and unit rate quoted shall be deemed to include for the same ii new transformer oil as required shall be measured and paid separatly under respective item as supply only iii the rate quoted by contractor shall deem to be included for three phase generator supply for dehydaration if required iv record of new insulating oil used for replacement and topping up oil in transformer shall be maintained duly signed by rep of contractor and age em, supply only new transformer oil as per is for topup with dielectric strength not less than 60 kv complete all as specified and directed by engineer - in - charge make- savitapower oilhp, ml for hiring of cable fault detector to detect exact position of fault for xlpe pvc ht cable 11000 33000 volts grade heavy duty aluminium conductor of any size complete all as specified and directed by engr-in-charge, ml for fixing in repair end joint kit for 11 kv earthed grade cable for indoor termination heat shrink type joint complete with jointing material and accessories suitable for 3 core xlpe armoured aluminium conductor cable of size 120 sqmm to 185 sqmm complete all as specified and testing after jointing complete note- item rate quoted including required tprefixing reconnection of cable in the panelpole cable joints complete all as specified and directed, supply jointing and testing in replacement of indoor type cable end termination joint heat shrinkable suitable for aluminium conductor cable of size 240 sqmm x 3 core to 300 sqmmx 3core 11000 volts grade complete all as specified and directed note- item rate quoted including required tprefixing reconnection of cable in the panelpole cable joints complete all as specified and directed make- densonraychem3mcabseal, sf in repairs cable jointing kit for 33 kv earthed grade cable for outdoor termination heat shrink type end joint complete with jointing material and accessories suitable for 3 core xlpe armoured aluminium conductor cable of size 300 sqmm complete all as specified and directed note- item rate quoted including required tprefixing reconnection of cable in the panelpole cable joints complete all as specified and directed make-densonraychem3mcabseal, ml in repairreplacement for earthing complete with using copper earth plate electrode 600 mmx 600 mmx315 mm thick buried directly in ground earth pit not less than 225 mtr deep below ground level with top edge of the earth plate not less than 150 m below ground level and earth plate surrounded with adequate quantity of charcoal dust mixed with salt to a packed thickness of 15 cm all round the plate using 20x3mm copper earth strip as earth lead moulded and riveted to earth plate at one end and connected to main equipment at switchcontrol board at another end gi earth lead incased in and including 50 mm dia gi light grade pipe from upper end of earth plate upto equipment with including 20 mm dia bore gi pipe light grade as water pipe from earth chamber to upper edge of the earth plate gi funnel with wire mesh fixed on water pipe and provision of pcc 124 type b1using 20 mm graded stone agg as in pits chamber and rcc pit cover 50 mm thick of precast rcc 124 type b-1 using 20 mm graded stone agg including necessary excavation and earth work in softloose soil all as shown in electric plate no 3 of ssr part-i and testing on completion complete all as specified and directed by engr-in-charge, ml in repairreplacement for earthing complete with using galvanized steel earth plate electrode 600 mmx 600 mmx 60 mm thick buried directly in ground earth pit not less than 225 mtr deep below ground level with top edge of the earth plate not less than 150 m below ground level and earth plate surrounded with adequate quantity of charcoal dust mixed with salt to a packed thickness of 15 cm all round the plate using 32x6 mm gi earth strip as earth lead moulded and riveted to earth plate at one end and connected to main equipment at switchcontrol board at another end gi earth lead incased in and including 50 mm dia gi light grade pipe from upper end of earth plate upto equipment with including 20 mm dia bore gi pipe light grade as water pipe from earth chamber to upper edge of the earth plate gi funnel with wire mesh fixed on water pipe and provision of pcc 124 type b1using 20 mm graded stone agg as in pits chamber and rcc pit cover 50 mm thick of precast rcc 124 type b-1 using 20 mm graded stone agg including necessary excavation and earth work in softloose soil all as shown in electric plate no 3 of ssr part-i and testing on completion complete all as specified and directed by engr-in-charge, sf in repairreplacement of earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduitpipe or fixed to poles or any other indicated situation for loop earthing etc as required by copper strip 20x3 mm all as specified and as directed, sf in repairreplacement of earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduitpipe or fixed to poles or any other indicated situation for loop earthing etc as required by galvanized iron strip 32x6mm complete all as specified and directed, labour for cutting trimming of tree branches up to 80 mm wide all around from the outer face of alignment of 33 kv ht over head electric line which are going touching or falling or acsr conductor poles or near by sub stns etc at any height from gl and making clearance 15m form conductor and removing to a distance up to 100 mtr where directed by engineer-in-charge note- i trimming of the branches on one sides of the conductor ii actual length of cutting will be measured iii the distance as motioned above will be maintained during contract current period same location subject to at least 6 months period between two trimminglopping iv measurement will be taken including all conductor as one only, mlfor preparatiom of old treated steel surface of any description of 33 kv yard and applying one coat of synthetic enamel paint complete all as specified, mlfor preparatiom of old treated pcc plastered surface of wall foundation of 33 kv yard and applying one coat of white wash complete all as specified, clearing away all grass vegetation saplings shrubs brush wood undergrowth roots and trees not exceeding 30 cm girth measured one metre above ground level and removing rubbish upto a distance of 50 metres outside the periphery of the area under clearance softloose soil and getting out including sprinkling anti vegitation chemical for complete area with spray machine complete all as specified directed, a line isolator 33 kv horizontal type - servicing of line isolator horizontal break outdoor type including cleaning of contact by ctc liquid proper oiling greasing on contacts moving rod handle for proper function of moveable rod for smooth on off position and checking the incoming and outgoing connection including replacement of terminal lugspg clamps with nut bolts etc and testing with following i meggar testing between phase to phase phase to earth shall be carried out, b ht potential transformer or 33 kv 110 volt outdoor type - cleaning of bushing and terminal of ht potential transformer 33 kv 110 volts outdoor type by ctc liquid and checking of oil level and oil dielectric strength bd test and proper connection checkingtightining of control wiring and testing with following - i meggar testing between phase to phase phase to earth, c ht 33 kv or 11 kv outdoorindoor type current transformer ct cleaning of bushing and terminal by ctc solution of ct 33 kv or 11 kv of any ratio and any type and checking of oil level and oil dielectric strength bdv test and for 11 kv checking of wiring circuits and decarbonising of cablebusbar jointsand proper connection checkingtightining of control wiring and testing with following i testing between phase to phase phase to earth to be carried out by external current injection kit, d 3311 kv vcbbreaker control relay panel 02 nos 33 kv panel - cleaning of control relay panel inside outside and checkingtightningrewiring if required cost of new wire is included in quoted rate all the control cable connection of ct pt vcb meters trivector meter transformer complete and testing with the following - i over current earth fault relay tripping by external current injecting kit on primarysecondary side ii buccholz relay alarm tripping testing iii oil temperature alarm tripping testing iv winding temperature alarm tripping testing v all selector switchesindication lamps such as localremoteonoff accept reset push button indication lamp checkedreplaced if required complete the cost of switchindication lamps will deemed to be included in quoted rate, etransformer 33 11 kv up to 315 mva - cleaning of power transformer 33 11 kv outdoor type externally including all accessories such as conservator tank marshaling box bushings bucholz relay radiator bushings oil level indicator complete and checking the incoming and outgoing terminal connection complete with the following testing - i transformer oil dielectric strength bd voltage test ii buccholz relay alarm trip testing iii oil temprature alarm trip testing iv winding temprature alarm trip testing v meggar testing between hv to earth vi meggar testing between lv to earth vii meggar testing between hv to lv viii earth resistance test for body earthing ix replacement all packing and viewing glass in marshilling box if required, f do fuse 33 kv cleaning of 33kv ht insulators checking the incoming outgoing joint connection replacing with new do fuse of approved rating including replacement of conductor clapms by replacing rusted nut bolts etc and testing with the following - i meggar testing between phase to phase phase to earth, ml for cement concrete for filling in foundations or making good of road pcc floor supports etc type b1 124 using 20 mm graded crushed stone aggregate including necessary form work and fair finishing of exposed surface of concrete facia finish with cement mortar complete all as directed, supply of fuse wire made up of tinned copper of rating 20 amp to 60 amp complete all as specified and directed note- fuse wire shall be taken on charge and record of consumption of same shall be maintained by ageje em, supply of ht insulation tapes roll isi marked for terminating high voltage 3311 kv cables for insulation sealing of connection of wire and cable for bus bar insulation transformer terminal insulation etc complete all as specified and directed, supply and fixing in replacement of danger notice plate 33000 volt and 11000 volt of 16mm thick ms sheet vitreous enamelled white with letters figuers and conventional skull and bones in signal red colour and fixed with ms clamps made out of flat iron 25x3 mm nuts-bolts of approved size for ht 25 x 20 cm and complete all as specified and directed, ml for hardcore of broken stone or boulders gauge of 40mm to 63 mm deposited spread and levelled in layers n exc 15cm thick around ht four poletwo pole structure and transformer area complete all as specified, repair to earth pit earth pit cover of 3311 kv switchyard by using pcc 124 and plastering in cm 13 complete including excavation returning filling and removal etc complete all as specified and directed, supply and laying in replacement of ht high voltage insulation mat size 2mx1m made of elastomeric polymers material having a high insulation registance thus imparting total saety to human being from any leakage current having high insulation registance of class a of size 30 mm thick and 1 m width suitale for 33 kv confirming to is-15652 2006 including pasting of mat with sr-998 by adding thinner as per requirement complete all as specified and directed
AI summaryBid / No Bid DecisionGenerate annexuresDraft Full Bid
supply installation testing and commissioning of 2 x10 cylinder main manifold for oxygen with nrv pipe connection and with middle frame with chain compatible for control panel wall mounting type gas manifold fabricated with 58x 15 swg copper pipe as per bs en 1057 brass blocks as per is 319 equally spaced at 250 mm fitted on duly powder coated ms frame 95 x 45 hydraulically tested at 300 bar with high pressure non return valve 125 metre long 516 x l6g copper tail pipe tested at 300 bar with standards isiso 7396-12016 a12017 htm 02-01 part a2006 ce cdsco, supply installation testing and commissioning of 2 x4 cylinder main manifold for oxygen with nrv pipe connection and with middle frame with chain compatible for control panel wall mounting type gas manifold fabricated with 58x 15 swg copper pipe as per bs en 1057 brass blocks as per is 319 equally spaced at 250 mm fitted on duly powder coated ms frame 95 x 45 hydraulically tested at 300 bar with high pressure non return valve 125 metre long 516 x l6g copper tail pipe tested at 300 bar with standards isiso 7396-12016 a12017 htm 02-01 part a2006 ce cdsco, supply installation testing and commissioning microprocessor based 2 source fully automatic control panel lcd display -touch screen for oxygen with 40 micron filters both sides left bank right bank 2100 lpm it shall be dome loaded fully automatic control panel and shall have touch screen display the manifold shall consist of two bank regulators dome bias used to reduce the cylinder pressure to the two lines regulators which in turn controls the final line pressure the manifold has an intermediate and line relief valve that is internally connected to a common vent port terminating into a l2 fnpt pipe the header bars shall be equipped with high-pressure shutoff valves outside the cabinet to allow for emergency isolation of the header bars the header bar shall incorporate integral check valves for each station the manifold is equipped with pressure transducers which sends information to the main circuit board for operation of the fail-safe relay which transmits a remote signal to the master alarm or buzzer the external shut-off valves connecting to the header bars must be ball valves capable of withstanding pressure of 3 000 psi with standards isiso 7396-12016 a12017 htm 02-01 part a2006 isiso 10524-22018 isiso 10524-42008 cecdsco should also be installed with leak measurement device it should be specifically designed for measuring the flow of oxygen catering to the requirements of hospital where precise oxygen flow control is critical providing features for easy installation versatile units election and comprehensive diagnostic functions it should incorporate at hermalmass flow sensor designed for measuring oxygen it should utilizes a calorimetric measuring principle eliminating the need for additional pressure and temperature measurements it should supports digital interfaces such as modbus rtu and rs485 facilitating seamless communication with other systems should also provide sanalog 420ma and pulse outputs ensuring compatibility with different data acquisition and control systems anda user- friendly display for unit selection and diagnostic functions it should be designed to achieve a high level of accuracy with specified measuring ranges 0-90 nm hand accuracy levels of 15 of measured value and 03 of full - scale value it should operate effectively in a temperature range of -3oto80c and can withstand operating pressure s ranging from-1 to 16 bar it should be with display degreased or 02 service the flowmeter should be designed for case of maintenance it should include diagnostic functions that can be read on the display or accessed remotely facilitating proactive maintenance, supply installation testing and commissioning terminal units for gas of british standard metal gas outlets with stainless steel probe are ce marked as a class iib medical device 9342eec with notified body british standards institute and stamped ce with standards isiso 7396-12016 a12017 htm 02-01 part a2006 isiso 10524-22018 isiso 10524-42008 cecdsco it should have one-piece chromed fascia plate shall frame the outlet with the back rough-in mounted the outlet shall adjust from 38 10 mm to 1 25 mm variation in wall thickness it should have modular design and include a gas specific 16 ga 16 mm steel mounting plate designed to permit on-site ganging of multiple outlets in any order on 5 127 mm spacing it should be cleaned and degreased for medical gas service factory assembled and tested it should be indexed to eliminate interchangeability of gas services it should have 360 swivel inlet pipe for easy installation and should have universal rough-in assembly to accept quick disconnects or diss front adaptors or bs adaptors medical oxygen gas, medical air gas, vacuum, supply installation testing and commissioning of bpc flow meter with dehumidifier bottle of specifications flow range 0-15 lpm for adult accuracy 10 of the scale value or 02 lpm whichever is higher material brass chrome plated float aisi 316 with mesh filter aisi 3 16 wire mesh inletoutlet connection 38 bsp rh calibration 50 psig 345 bar at 21c operation mode manual with a knob to adjust flow supply it shall fully comply and meets with active medical device of class ila and in compliance with the en iso150022008 standard it should be duly ce marked and comply with 9342eec medical devices general it shall be ce marked with the notified body number specified it shall be provided with a copy of the certificate of origin its pressure compensated to prevent back pressure build upon flow indicator expanded scale providing higher reading accuracy durable polycarbonate flow tube with cover flowmeter should be placed in the vertical position lt should be lightweight of 200 g the flowmeters should be of 0-15 lpm range for oxygen and with inlet pressure 50-60psi 45 bar the closing of the knob should be without any leakage polysulphone 250 cc humidifier bottle should be unbreakable reusable to disinfectants and complements with standards isiso 150022008 isiso 7396-12016 a12017 htm 02-01 part a2006 cecdsco, supply installation testing and commissioning of ward vacuum unit adult 1000 ml with vacuum regulator a clear autoclavable polycarbonate jar with varying capacities a vacuum range of 0 to 760 mmhg a regulator with an adjustable knob for precise control and a gauge to measure negative pressure often with a range of 0 1o -760 mmhg the jar is designed to be shatterproof and autoclavable while the regulator typically has an aluminium body brass inner parts and a neoprene diaphragm conform to relevant standards isiso 10079-3 2014 for devices isiso 7396-12016 a12017 htm 02-01 part a2006 ce cdsco, supply installation testing and commissioning of medical grade copper pipes bsen 133482016 ce cerified kite marked copper pipes used should be solid drawn seamless deoxidized phosphorus non-arsenical half hard tempered and degreased manufactured as per bsen 133482016 in cither r250 half hard or r290 hard meeting the requirements as per the medical grade copper pipe standards degreasing of pipe shall be such that there is less than20mgm2020mgdm2 of hydrocarbons on the degreased surface when tested by method specified by bsen13348 2016 1t should also have lloyd third-party inspection of copper pipes the supplier should provide manufacturers test certificate of copper pipes for physical properties and chemical composition copper pipes joined by silver brazing method for copper to brass inert gas welding technique should be used by passing nitrogen gas inside the copper pipes during brazing in order to avoid carbon deposition inside the copper pipes all copper pipes and fittings like bends tees reducers and straight couplings should be as per eni254-1 copper pipes to be fixed with walls with suitable saddles and supports after erection all the pipes should be cleaned or purged with the help of dry nitrogen gas should be tested with dry nitrogen 12 mm thickness 1 mm, 15 mm tickness 09 mm, 22 mm thickness 09 mm, 28 mm thickness 09 mm, 42 mm thickness 12 mm, supply installation testing commissioning of isolation valve of ball valve its shall have a body of brass metal ballstem shall be of stainless steel or other materials depending on the application ball valve seatsseals are made of ptfe epdm viton or other materials depending on the fluid and temperature with standards isiso 7396-12016 a12017 htm 02-01 part a2006 isiso 10524-22018 isiso 10524-42008 cecdsco 12 mm isolation ball valve, 15 mm isolation ball valve, 22 mm isolation ball valve, 28 mm isolation ball valve, 42 mm isolation ball valve, supply installation testing and commissioning of air compressors 100 oil free oil less reciprocating piston compressor tefc motor standard with dynamically balanced flywheel for low vibration must have 5 microns oversized filter for large dirt holding capacity with electric sensor tank drain a rated control panel also provided with two-way cooling from fan and flywheel to eliminate excess heat composite piston technology with insulated wrist pin to reduce bearing heat 800 lpm, supplying installing testing and commissioning of indigenous electrical control panel for duplex vacuum duplex compressed air plant, 1000 air receiver tank, supply installation testing commissioning of heatless decicant air dryer designed for - 1so7183-1986 e dryer quality class -iso8573-12010 e class 2 pre-filter quality class - iso8573-120 10 e class 1 consistent dew point performance noise level 70 dba i pressure drop 03 kgem2 g it is of aluminium construction free from corrosion scale formation at inner and outer sides uses high crush strength adsorbent materials lt shall also consist of pre and post microbial filter of suitable grade and class 60 cfm, supply lnstallation testing and commissioning of coarase filter for medical air for oil removal coalescing and particulate its flow from 20 to 1810 m3hour particle removal 001 um, supply lnstallation testing and commissioning of activated carbon filter for medical air for odour removal and particle removal its flow from 20 to 1810 m3hour particle removal 001 um, supply installation testing and commissioning of bacteria filter for medical air of borosilicate filter element 99 995 efficiency and must compliant with health technical memorandum 2022 to meet air flow rates from 850 -7504 litresmin 30-265 scfm, supply installation testing and commissioning vacuum pump with motor starter silencer with fitting and bracket cast iron construction - cylinders and frame are designed with 100 cast iron for durability and long life cylinders - separately cast cylinders with deep fins allow for 360 cooling removing the heat of compression individual bolting of the cylinders to the frame for easy inspection and maintenance low oil level protection -the low oil level switch protects the pump from operating without proper lubrication piston rings - each piston is equipped with 2 compression rings and 2 oil control rings to maintain maximum operating efficiency and low oil carryover valves - stainless steel valves are readily accessible and inexpensively replaced if necessary connecting rods -one piece design permits precision aligned machining of both crankpin and piston pin bearings resulting in longer bearing life also allows for simple maintenance-no bolts to come loose or adjust 600 lpm, supply installation testing and commissioning of vacuum tanks tanks are designed for the safe and efficient storage of compressed medical air the air tanks meet stringent medical standards making them reliable components in hospitals clinics and other healthcare environments it shall be painted to avoid corrosion it shall be made of high-quality carbon steel to ensure durability corrosion resistance and long service life it should includes safety valves pressure gauges and drain valves to monitor and maintain safe operating conditions vertical or horizontal options to accommodate available space and facility layouts maximum working pressure is 8 bar to 13 bar custom options available as pe standard gbis01150 4-2011 hgt20584-2011 tsg21-2016 its working temperature s100c 1000 ltr for vacuum system water volume, supply installation testing and commissioning of zonal valve box with pressure gauge the valve box shall be constructed of 18-gauge steel complete with a baked white enamel finish affixed to the opposite sides of the box will be two adjustable steel brackets for the purpose of mounting the box to the structural support the steel brackets shall accommodate various finished wall thicknesses between 38and 1- 316and shall be field adjustable the frame assembly shall be constructed of anodized aluminium and shall be mounted to the back box assembly by standard 6x38 tapping screws as provided with the exception of the security valve box the removable front shall consist of an opaque window with a pull-out ring pre-mounted to the center of the window with the exception of the security valve box access to the zone shut-off valves shall be by merely pulling the ring assembly to remove the window from the frame the window can be reinstalled without the use of tools only after the valve handles have been returned to the open position with the exception of the security valve box and the alarm valve combination units the window shall be marked to prohibit unauthorized persons from tampering with the valves with the following silk-screen caution medical gas controlvalvesclose only in emergency and with the exception of the security valve box and thealarmvalve combination units each valve shall be supplied with an identification bracket which shall be bolted directly on to the valve box for the purpose of applying an approved medical gas identification label the front panel shall be labelled to instruct persons to close the valves only in an emergency the valve boxes hall be constructed so that the front panel cannot be attached to the box while any valve inside is in the closed position lt should have openings to the box sinterior shall be dust-tight it should have each pipe inside the boxes hall come with it shown pressure gauge that can be viewed through the clear window all ases and their respective gauges shall be clearly labelled with the proper color coordinationisiso 7396-12016 a12017 htm 02-01 part a2006 isiso 10524-22018 isiso 10524-42008 cecdsco 3 gas oxygen vacuum medical air, supply installation testing and commissioning of digital medical gas area alarm it should fully complies and meets nfpa-99 standards only the alarm shall be microprocessor based witha 10screcn and capable of monitoring up to 8 sensors sensors shall be mounted locally in the rough-inbox by installing the copper pipe provided or mounted remotely sensors shall be automated for gas specific detection arca alarm shall be fabricated from18gauge steel with a 38od type k copper pipe for connection to the service line the default set-points shall be - 20 variation from normal condition in the calibration mode high lowest -points shall be adjustable by on board push buttons to view the set points and audible alarm sound level press and hold the mute button for twenty 20 seconds the digital sensors can be mounted locally or remotely utilizing shielded twisted pair wiring up to 500 ft the sensors shall be designed to create interference barrier for increased rfiemi protection the lcd brightness and volume shall be field adjustable the lcd display shall be readable in poor lighting conditions screen text shall be customizable for gas locations the sensors shall be gas specific with a diss nut and a nipple the lcd sensors operating range shall be the following mid-pressure0-99 psi oxygen and vacuum the alarm shall conform to ul standard 1069 the alarm shall comply with the electro magnetic compatibility standards fcc part1s class a and 1ces 003 class a isiso 7396-12016 a12017 htm 02-01 part a2006 isiso 10524-22018 isiso 10524-42008 ce cdsco 3 gas oxygen vacuum medical air, supply installation testing and commissioning of horizontal vertical bed head panel double duct it shall be duly ce marked and comply with 9342eec medical devices general shall have ce no or nfpa-99 standards or cga standards or htm02-01 or eniso7396 12 it should be with 2 channels to provide a modular surface mounted unit with integrated accessory rails for equipment management it should have 2 separate partition rows wise for medical gases and electrical switch sockets length should be 1800mm all medical gas piping shall be hard-piped and brazed to a single point of connection fascia panels top middle and bottom cover panels shall be removable for access for easy installation and maintenance it should be pre-piped with provision for 2 to 6 gas outlets as required bed head panels does not include gas out let cost it should have 4 electrical sockets rj-451 rj-1 it should have one stainless steel vertical pole with iv stand and 4 hooks on which dedicated accessories can be mount out of two partitions one partitions should have medical gas piping shall be hard- piped and brazed to a single point of connection fascia panels top bottom cover panels shall be removable for access for easy installation and maintenance design to meets the need of the 1cu wards designed to makel recovery more pleasant should be made of an innovative polycarbonates hee ton to which it is applied a colorful film featuring pictures recommended by user supply installation testing and commissioning of iv pole cum syringe stand supply installation testing and commissioning of ss wire basket, hp medical gas anti-static hose assembly oxygen vacuum medical air4 medical air 7 nitrous oxide carbon dioxide, construction of manifold and plant room and electrical work in plant and manifold room
AI summaryBid / No Bid DecisionGenerate annexuresDraft Full Bid
supply installation testing and commissioning of 2 x10 cylinder main manifold for oxygen with nrv pipe connection and with middle frame with chain compatible for control panel wall mounting type gas manifold fabricated with 58x 15 swg copper pipe as per bs en 1057 brass blocks as per is 319 equally spaced at 250 mm fitted on duly powder coated ms frame 95 x 45 hydraulically tested at 300 bar with high pressure non return valve 125 metre long 516 x l6g copper tail pipe tested at 300 bar with standards isiso 7396-12016 a12017 htm 02-01 part a2006 ce cdsco, supply installation testing and commissioning of 2 x4 cylinder main manifold for oxygen with nrv pipe connection and with middle frame with chain compatible for control panel wall mounting type gas manifold fabricated with 58x 15 swg copper pipe as per bs en 1057 brass blocks as per is 319 equally spaced at 250 mm fitted on duly powder coated ms frame 95 x 45 hydraulically tested at 300 bar with high pressure non return valve 125 metre long 516 x l6g copper tail pipe tested at 300 bar with standards isiso 7396-12016 a12017 htm 02-01 part a2006 ce cdsco, supply installation testing and commissioning microprocessor based 2 source fully automatic control panel lcd display -touch screen for oxygen with 40 micron filters both sides left bank right bank 2100 lpm it shall be dome loaded fully automatic control panel and shall have touch screen display the manifold shall consist of two bank regulators dome bias used to reduce the cylinder pressure to the two lines regulators which in turn controls the final line pressure the manifold has an intermediate and line relief valve that is internally connected to a common vent port terminating into a l2 fnpt pipe the header bars shall be equipped with high-pressure shutoff valves outside the cabinet to allow for emergency isolation of the header bars the header bar shall incorporate integral check valves for each station the manifold is equipped with pressure transducers which sends information to the main circuit board for operation of the fail-safe relay which transmits a remote signal to the master alarm or buzzer the external shut-off valves connecting to the header bars must be ball valves capable of withstanding pressure of 3 000 psi with standards isiso 7396-12016 a12017 htm 02-01 part a2006 isiso 10524-22018 isiso 10524-42008 cecdsco should also be installed with leak measurement device it should be specifically designed for measuring the flow of oxygen catering to the requirements of hospital where precise oxygen flow control is critical providing features for easy installation versatile units election and comprehensive diagnostic functions it should incorporate at hermal mass flow sensor designed for measuring oxygen it should utilizes a calorimetric measuring principle eliminating the need for additional pressure and temperature measurements it should supports digital interfaces such as modbus rtu and rs485 facilitating seamless communication with other systems should also provide sanalog 420ma and pulse outputs ensuring compatibility with different data acquisition and control systems anda user- friendly display for unit selection and diagnostic functions it should be designed to achieve a high level of accuracy with specified measuring ranges 0-90 nm hand accuracy levels of 15 of measured value and 03 of full - scale value it should operate effectively in a temperature range of -3oto80c and can withstand operating pressure s ranging from-1 to 16 bar it should be with display degreased or 02 service the flowmeter should be designed for case of maintenance it should include diagnostic functions that can be read on the display or accessed remotely facilitating proactive maintenance, supply installation testing and commissioning terminal units for gas of british standard metal gas outlets with stainless steel probe are ce marked as a class iib medical device 9342eec with notified body british standards institute and stamped ce with standards isiso 7396-12016 a12017 htm 02-01 part a2006 isiso 10524-22018 isiso 10524-42008 cecdsco it should have one-piece chromed fascia plate shall frame the outlet with the back rough-in mounted the outlet shall adjust from 38 10 mm to 1 25 mm variation in wall thickness it should have modular design and include a gas specific 16 ga 16 mm steel mounting plate designed to permit on-site ganging of multiple outlets in any order on 5 127 mm spacing it should be cleaned and degreased for medical gas service factory assembled and tested it should be indexed to eliminate interchangeability of gas services it should have 360 swivel inlet pipe for easy installation and should have universal rough-in assembly to accept quick disconnects or diss front adaptors or bs adaptors medical oxygen gas, medical air gas, vacuum, supply lnstallation testing and commissioning of bpc flow meter with dehumidifier bottle of specifications flow range 0-15 lpm for adult accuracy 10 of the scale value or 02 lpm whichever is higher material brass chrome plated float aisi 316 with mesh filter aisi 3 16 wire mesh inletoutlet connection 38 bsp rh calibration 50 psig 345 bar at 21c operation mode manual with a knob to adjust flow supply it shall fully comply and meets with active medical device of class ila and in compliance with the en iso150022008 standard it should be duly ce marked and comply with 9342eec medical devices general it shall be ce marked with the notified body number specified it shall be provided with a copy of the certificate of origin its pressure compensated to prevent back pressure build upon flow indicator expanded scale providing higher reading accuracy durable polycarbonate flow tube with cover flowmeter should be placed in the vertical position lt should be lightweight of 200 g the flowmeters should be of 0-15 lpm range for oxygen and with inlet pressure 50-60psi 45 bar the closing of the knob should be without any leakage polysul phone 250 cc humidifier bottle should be unbreakable reusable to disinfectants and complements with standards isiso 150022008 isiso 7396-12016 a12017 htm 02-01 part a2006 ce cdsco, supply installation testing and commissioning of ward vacuum unit adult 1000 ml with vacuum regulator a clear autoclavable polycarbonate jar with varying capacities a vacuum range of 0 to 760 mmhg a regulator with an adjustable knob for precise control and a gauge to measure negative pressure often with a range of 0 1o -760 mmhg the jar is designed to be shatterproof and autoclavable while the regulator typically has an aluminium body brass inner parts and a neoprene diaphragm conform to relevant standards isiso 10079-3 2014 for devices isiso 7396-12016 a12017 htm 02-01 part a2006 ce cdsco, supply installation testing and commissioning of medical grade copper pipes bsen 133482016 ce certified kite marked copper pipes used should be solid drawn seamless deoxidized phosphorus non-arsenical half hard tempered and degreased manufactured as per bsen 133482016 in cither r250 half hard or r290 hard meeting the requirements as per the medical grade copper pipe standards degreasing of pipe shall be such that there is less than20mgm2020mgdm2 of hydrocarbons on the degreased surface when tested by method specified by bsen13348 2016 1t should also have lloyd third-party inspection of copper pipes the supplier should provide manufacturers test certificate of copper pipes for physical properties and chemical composition copper pipes joined by silver brazing method for copper to brass inert gas welding technique should be used by passing nitrogen gas inside the copper pipes during brazing in order to avoid carbon deposition inside the copper pipes all copper pipes and fittings like bends tees reducers and straight couplings should be as pereni254-1 copper pipes to be fixed with walls with suitable saddles and supports after erection all the pipes should be cleaned or purged with the help of dry nitrogen gas should be tested with dry nitrogen 12 mm thickness 1 mm, 15 mm tickness 09 mm, 22 mm thickness 09 mm, 28 mm thickness 09 mm, 42 mm thickness 12 mm, supply installation testing commissioning of isolation valve of ball valve its shall have a body of brass metal ballstem shall be of stainless steel or other materials depending on the application ball valve seatsseals are made of ptfe epdm viton or other materials depending on the fluid and temperature with standards isiso 7396-12016 a12017 htm 02-01 part a2006 isiso 10524-22018 isiso 10524-42008 ce cdsco 12 mm isolation ball valve, 15 mm isolation ball valve, 22 mm isolation ball valve, 28 mm isolation ball valve, 42 mm isolation ball valve, supply installation testing and commissioning of air compressors 100 oil free oil less reciprocating piston compressor tefc motor standard with dynamically balanced flywheel for low vibration must have 5 microns oversized filter for large dirt holding capacity with electric sensor tank drain a rated control panel also provided with two-way cooling from fan and flywheel to eliminate excess heat composite piston technology with insulated wrist pin to reduce bearing heat 800 lpm, supplying installing testing and commissioning of indigenous electrical control panel for duplex vacuum duplex compressed air plant, 1000 air receiver tank, supply installation testing commissioning of heatless decicant air dryer designed for - 1so7183-1986 e dryer quality class -iso8573-12010 e class 2 pre-filter quality class - iso8573-120 10 e class 1 consistent dew point performance noise level 70 dba i pressure drop 03 kgem2 g it is of aluminium construction free from corrosion scale formation at inner and outer sides uses high crush strength adsorbent materials lt shall also consist of pre and post microbial filter of suitable grade and class 60 cfm, supply installation testing and commissioning of coarase filter for medical air for oil removal coalescing and particulate its flow from 20 to 1810 m3hour particle removal 001 um, supply installation testing and commissioning of activated carbon filter for medical air for odour removal and particle removal its flow from 20 to 1810 m3hour particle removal 001 um, supply installation testing and commissioning of bacteria filter for medical air of borosilicate filter element 99 995 efficiency and must compliant with health technical memorandum 2022 to meet air flow rates from 850 -7504 litresmin 30-265 scfm, supply installation testing and commissioning vacuum pump with motor starter silencer with fitting and bracket cast iron construction - cylinders and frame are designed with 100 cast iron for durability and long life cylinders - separately cast cylinders with deep fins allow for 360 cooling removing the heat of compression individual bolting of the cylinders to the frame for easy inspection and maintenance low oil level protection -the low oil level switch protects the pump from operating without proper lubrication piston rings - each piston is equipped with 2 compression rings and 2 oil control rings to maintain maximum operating efficiency and low oil carryover valves - stainless steel valves are readily accessible and inexpensively replaced if necessary connecting rods -one piece design permits precision aligned machining of both crankpin and piston pin bearings resulting in longer bearing life also allows for simple maintenance-no bolts to come loose or adjust 600 lpm, supply installation testing and commissioning of vacuum tanks tanks are designed for the safe and efficient storage of compressed medical air the air tanks meet stringent medical standards making them reliable components in hospitals clinics and other healthcare environments it shall be painted to avoid corrosion it shall be made of high-quality carbon steel to ensure durability corrosion resistance and long service life it should includes safety valves pressure gauges and drain valves to monitor and maintain safe operating conditions vertical or horizontal options to accommodate available space and facility layouts maximum working pressure is 8 bar to 13 bar custom options available as pe standard gbis01150 4-2011 hgt20584-2011 tsg21-2016 its working temperature s100c 1000 ltr for vacuum system water volume, supply installation testing and commissioning of zonal valve box with pressure gauge the valve box shall be constructed of 18-gauge steel complete with a baked white enamel finish affixed to the opposite sides of the box will be two adjustable steel brackets for the purpose of mounting the box to the structural support the steel brackets shall accommodate various finished wall thicknesses between 38and 1- 316and shall be field adjustable the frame assembly shall be constructed of anodized aluminium and shall be mounted to the back box assembly by standard 6x38 tapping screws as provided with the exception of the security valve box the removable front shall consist of an opaque window with a pull-out ring pre-mounted to the center of the window with the exception of the security valve box access to the zone shut-off valves shall be by merely pulling the ring assembly to remove the window from the frame the window can be reinstalled without the use of tools only after the valve handles have been returned to the open position with the exception of the security valve box and the alarm valve combination units the window shall be marked to prohibit unauthorized persons from tampering with the valves with the following silk-screen caution medical gas controlvalvesclose only in emergency and with the exception of the security valve box and the alarmvalve combination units each valve shall be supplied with an identification bracket which shall be bolted directly on to the valve box for the purpose of applying an approved medical gas identification label the front panel shall be labelled to instruct persons to close the valves only in an emergency the valve boxes hall be constructed so that the front panel cannot be attached to the box while any valve inside is in the closed position lt should have openings to the box sinteri or shall be dust-tight it should have each pipe inside the boxes hall come with it shown pressure gauge that can be viewed through the clear window all cases and their respective gauges shall be clearly labelled with the proper color coordinationisiso 7396-12016 a12017 htm 02-01 part a2006 isiso 10524-22018 isiso 10524-42008 ce cdsco 3 gas oxygen vacuum medical air, supply installation testing and commissioning of digital medical gas area alarm it should fully complies and meets nfpa-99 standards only the alarm shall be microprocessor based with a 10screcn and capable of monitoring up to 8 sensors sensors shall be mounted locally in the rough-inbox by installing the copper pipe provided or mounted remotely sensors shall be automated for gas specific detection arca alarm shall be fabricated from18gauge steel with a 38od type k copper pipe for connection to the service line the default set-points shall be - 20 variation from normal condition in the calibration mode high lowest -points shall be adjustable by on board push buttons to view the set points and audible alarm sound level press and hold the mute button for twenty 20 seconds the digital sensors can be mounted locally or remotely utilizing shielded twisted pair wiring up to 500 ft the sensors shall be designed to create interference barrier for increased rfiemi protection the lcd brightness and volume shall be field adjustable the lcd display shall be readable in poor lighting conditions screen text shall be customizable for gas locations the sensors shall be gas specific with a diss nut and a nipple the lcd sensors operating range shall be the following mid-pressure0-99 psi oxygen and vacuum the alarm shall conform to ul standard 1069 the alarm shall comply with the electromagnetic compatibility standards fcc part1s class a and 1ces 003 class a isiso 7396-12016 a12017 htm 02-01 part a2006 isiso 10524-22018 isiso 10524-42008 ce cdsco 3 gas oxygen vacuum medical air, supply installation testing and commissioning of horizontal vertical bed head panel double duct it shall be duly ce marked and comply with 9342eec medical devices general shall have ce no or nfpa-99 standards or cga standards or htm02-01 or eniso7396 12 it should be with 2 channels to provide a modular surface mounted unit with integrated accessory rails for equipment management it should have 2 separate partition rows wise for medical gases and electrical switch sockets length should be 1800mm all medical gas piping shall be hard-piped and brazed to a single point of connection fascia panels top middle and bottom cover panels shall be removable for access for easy installation and maintenance it should be pre-piped with provision for 2 to 6 gas outlets as required bed head panels does not include gas out let cost it should have 4 electrical sockets rj-451 rj-1 it should have one stainless steel vertical pole with iv stand and 4 hooks on which dedicated accessories can be mount out of two partitions one partitions should have medical gas piping shall be hard- piped and brazed to a single point of connection fascia panels top bottom cover panels shall be removable for access for easy installation and maintenance design to meets the need of the 1cu wards designed to makel recovery more pleasant should be made of an innovative polycarbonates hee ton to which it is applied a colorful film featuring pictures recommended by user supply installation testing and commissioning of iv pole cum syringe stand supply installation testing and commissioning of ss wire basket, hp medical gas anti-static hose assembly oxygen vacuum medical air4 medical air 7 nitrous oxide carbon dioxide, construction of manifold and plant room and electrical work in plant and manifold room
AI summaryBid / No Bid DecisionGenerate annexuresDraft Full Bid
beaker 100 ml a grade, beaker 250 ml a grade, beaker 500 ml a grade, measuring cylinder 100 ml, measuring cylinder 250 ml, spirit lamp 125 ml glass, plane mirror with stand, dropper 4, dropper 6, dropper 8, test tube 5x58 autoclaveble, test tube 6x1 borosil, thermometer 110 c red yellow base, round bottom flask 250 ml, flat bottom flask 250 ml, wire guage with frame, water condenser 12 glass, watch glass 3, glass stirrer, bent tube 7 shape, bent tube l shape, funnel 3 glass, rubber tubing 6mm, rubber cork 8 no, rubber cork 12 no, lense convex 2 10fl, lense concave 2, mirror convex 2, mirror concave 2, test tube holder, test tube stand wooden, conical flask 100 ml, conical flask 250 ml, burette with pinch cork 25 ml, pipette volumetric 10 ml, dropping bottle 60 ml, glass slab 75x50x18 mm, prism 38x38, reagemt bottle nm 250 ml, gas jar with lid 6x2, seperating funnel 100 ml, wall thermometer 12 meter long, test tube 5 ml borsil glass, petri dish 3, evaporating dish 3, filter paper 125 cms, magnetic compass 3, tripod stand iron 6x4x, retort stand iron 6x4, burette clamp fisher type, magnifying glass with handle 3, laser battery, acid hydrochloric, acid sulphric, acid nitric, magnesium ribbon, calcium oxide, ammonium chloride, sodium sulphate, copper chloride 100 gm, sodium hydroxide flask, silver nitrate soln 100 ml, acetic acid glacial 500 gm, sodium bi-carbonate, sodium carbonate, barium chloride, barium nitrate, bleaching powder, phenolphthlein solution 100 ml, methyl orange solution, methylene blue 100 ml, universal indicator 100 ml, lime water, sodium chloride, copper sulphate, safranine solution 100 ml, eosine solution 100 ml, potassium chloride 500 gm, pottasium bromide 250 gm, pottasium lodide 50 gm, zink metal powder, lead nitrate, ferrous sulphate, iron filing 100 gm, zinc sulphate 500 gm, alluminium sulphate, alluminium metal plate, zinc plate with terminal, copper plate with terminal, lab solvent, pottassium permagnate, idone solution, litmus solution red 500 ml, litmus solution blue 500 ml, glycerine 100 ml, potassium hydroxide flask, ph paper packet 1 to 14 ph, litmus paper blue, litmus paper red, microscope jr medical, dissection microscope with black light, rohu fish specimen, earthworm specimen, cockroach specimen, star fish specimen, moss specimen, animal cell slide, plant cell slide, parenchyma in ts slide, scleranchyma in ts slide, striated muscle slide, nerve cell slide, sprogyra slide, hydra with bud slide, amoeba binnary fission slide, 10th set of 9 slide, mitosis set of 5 slide, meiosis set of 12 slide, bb forcep, plain slide box, coverslips box, dissection box, human eye model, human ear model, human heart model 4 part, human brain model 4 part, human digestive system model, human respiratory system model, human nervous system model, human blodd circulation model, human skeleton model fiber imported, reproductive system female model, reproductive system male model, dna model steel, plant cell model, animal cell model fibre, atomic model set with 75 ball poly, std 8th science chart pvc marathi, std 9th science chart pvc marathi, std 10 th science chart pvc marathi, std 5th science chart pvc marathi, std 6th science chart pvc marathi, std 7th science chart pvc marathi, aneriode barometer 4 indina make moi, hydrometer metal body, digital thermometer, hope app tin painted, balance letter plastic body 1 kg, milameter with case 0-250 ma dc, voltmeter with case 0-10 volt, galvonometer with case 30-0-30, resistance coil in transparent case, rehostat 100 ohms, bar magnet powerfull 2, magnet u shape 2, round maget small, ebonite rod, glass rod, crocodile pin, spring balance 100 gms tubuler, lens stand v shape, ground glass screen, stop clock, drowing board 12x18 wooden, overflow vessel plastic, copper calorimeter 3x2wooden, reflection of sound app big 12x18, resistance in series with 2 meter, resistance in parallel with 2 meter, ohms law app readymade, plug key one way, meter rull full, meter rull half, battery eliminator 2 to 12 volt - 1 amp, potentio meter 4 wire, meter bridge, pn junction diode, logic gates apperatus, npn pnp appreatus, k-constant full size, potentio meter 10 wire, optical bench, rehostat 1000 ohms, resistance box 500 ohms, human torso body unisex, physics table complete, student stool ss for physics, chemistry table with wash basin, student stool ss for chemistry, biology table, student stool ss for biology complete, almirah, wind vane, anemometer, safety googles, first aid box, laboratory aprons, fire extinguisher, chemical spill tray, soil testing kit, circuit board, electric bell model, multimeter, battery holder, ray box light source, ball and ring apparatus, dynomometer, pulley set, slotted weights, mortar and pestle, digital balance beam balance, 3d human eye model frame, 3d human ear model frame, 3d human brain model frame, 3d human heart model frame, 3d human respiratory frame, 3d human digestive frame, 3d human kidney frame, 3d human skeleton frame, 3d human circulation of blood frame, 3d human nervous frame, 3d human reproduction frame, solar system model, day and night model, phases of moon model, solar and lunar eclipse model, water cycle model, student microscope, scientist potraits
AI summaryBid / No Bid DecisionGenerate annexuresDraft Full Bid