FILTERS
de-stringing of existing panther conductor and stringing and supply of htls conductor (using existing disc insulators) along with all accessories of: i. 132kv sonabil-depota transmission line, ii. 132kv sonabil -ghoramari transmission line, iii. 132kv ghoramari-depota transmission line.
View Insights
de-stringing of existing panther conductor and stringing and supply of htls conductor (using existing disc insulators) along with all accessories of:i. 132kv sonabil-depota transmission line, ii. 132kv sonabil -ghoramari transmission line, iii. 132kv ghoramari-depota transmission line.
construction of 132 kv s/c transmission line on d/c towers from draba gss to mendhar gss, district poonch, (hilly and snow bound area) of u.t of jk
establishing 2x20 mva, 66/11kv sub-station at neralekere in magadi taluk, bengaluru south district and construction of 66kv dc line on dc towers from existing 220/66kv anchepalya substation to the proposed 66/11kv neralekere substation for a distance of 6.806km using 110kv narrow based towers with panther conductor along with construction of 02 nos. of 66kv terminal bay at existing 220/66kv anchepalya substation on partial turnkey basis including supply of all matching materials/equipments
modification of 33 kv / 11 kv / 0.4 kv over head power line, which is infringing due to falling in alignment of under construction 3rd & 4th line between gonda kacheri to goldenganj section, 3rd & 4th line between burhwal-sitapur section, 3rd line between aunrihar-varanasi section, kld-brk (ph-ii & ph-iii) new line and cpa-mda elevated track.
supply, erection, testing and commissioning of 132/33kvss korlam and connected lines in srikakulam district on turnkey basis
establishing 2x20mva, 110/11kv sub-station at halapura (joladarasi) and construction of 110kv lilo line using lynx conductor from 110kv maski - hutti line to the proposed 110kv sub-station at halapura (joladarasi) for a distance of 9.39km in maski taluk & raichur district including supply of all matching materials/equipments (excluding supply 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, testing and commissioning
construction of various transmission elements (various 220kv and 132kv transmission lines) associated with 220kv gss palana (district-bikaner) (turnkey project) against specification no. rvpn/ehv/bn-9019002613.
supply,erection,testing and commissioning of ctt\anchor towers along with connecting stringing works including dismantling of existing towers and conductors, and transportation of dismantled scrap to the designated location in crda seed capital area required for shifting\diversion of existing 4 nos 220kv transmission lines with ug cable in crda region, guntur district
corrigendum : establishing 2x20mva, 110/11kv sub-station at adakalabandi (kodala) and construction of 110kv dc line using panther conductor from existing 110kv gondadagi sub-station to the proposed 110/11kv sub-station at adakalabandi(kodala) for a distance of about 7.907km in wadagera taluk, yadgir district
establishing 2x20mva, 66/11kv sub-station at sasvihalli village along with construction of 02 nos. of 66kv terminal bays at existing 66/11kv bennihalli sub-station and construction of 66kv dc line on 110kv dc towers using panther conductor from existing 66/11kv bennihalli sub-station to proposed 66/11kv sasvihalli village sub-station for a distance of 7.085km in harapanagalli taluk, vijayanagara district on partial turnkey basis
establishing 2x20 mva, 66/11kv substation at hunasekatte village in bhadravathi taluk, shivamogga district and construction of 66kv 630sqmm ug cable lilo line from existing 66kv santhekadur-bhadra line to the proposed hunasekatte substation for a distance of 0.597km- and construction of 66kv line on 110kv dc towers on existing 66kv santhekadur-bhadra line for a distance of 0.811km bhadravathi taluk, shivamogga district
corrigendum : construction of 66kv double circuit transmission line to proposed 66kv substation at dhana (baghbania) under es division nalagarh
corrigendum : construction of 132kv dedicated transmission line to traction sub-station of imphal railway station on turnkey basis.
establishing 2x20mva, 110/11kv sub-station at kandakur in gurmitkal taluk, yadgir district and construction of 110kv lilo line using lynx conductor from existing 110kv ramasamudra-konkal sc line to proposed 110/11kv sub-station at kandakur for a distance of 6.912km in yadgir taluk, yadgir district on partial turnkey basis
establishing 2x20mva, 110/11kv sub-station at amdihal and construction of 110 kv lilo line using lynx conductor from 110kv mudagal-bayyapur line to proposed 110kv sub-station at amdihal for a distance of 6.64 kms in lingasugur taluk, raichur district on partial turnkey basis including supply of all matching materials/equipments (excluding supply 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, testing and commissioning.
corrigendum : construction of 66kv double circuit transmission line to proposed 66kv substation at thana under es division nalagarh
tender for the work of establishing of 2x20 mva, 66/11 kv sub-station at mylapura along with construction of 66kv lilo line using drake conductor on 110kv nbt towers for a distance of 4.422kms in chintamani taluk,chikkaballapura dist on ptk basis
establishing 2x20mva, 110/11kv sub-station at kunibenchi village and construction of 110kv lilo line from guledagudda-ilkal line to proposed 110kv sub-station at kunibenchi for a distance of 3.083kms using lynx conductor in ilkal taluk, bagalkote district on ptk basis including supply of all matching materials/equipments (excluding supply 11kv swg) and erection (including dismantling and civil works) of all materials/ equipment, t&c
supply, installation, testing & commissioning for shifting / modification of 66kv electrical utilities of tpddl from indian railway line to haryana border section of rithala kundli corridor of delhi metro phase iv.
corrigendum : construction of 2nd 132 kv single circuit transmission line from 132 kv substation banduar to palatana otpc by htls conductor - as per bid document
establishing 2x20mva, 66/11kv sub-station at hadinaru and construction of 66kv lilo line on 110kv dc towers using coyote conductor from proposed 66kv immavu-ayrahalli (on going) sc line to the proposed 66/11kv hadinaru for a distance of 3.589km in nanjangudu taluk, mysuru district on partial turnkey basis
establishing 2x20mva, 110/11kv sub-station at naranapura by construction of 110kv lilo line using lynx conductor from existing 110kv ajjampura-shivani line to proposed 110/11kv naranapura sub-station for a distance of about 2.571km in ajjampura, taluk, chikkamagaluru district
establishing 2x20mva, 110/11kv sub-station at masuti in kolhar taluk, vijayapur district along with construction of 110kv lilo line from ongoing 110kv telagi lilo line (110kv b.bagewadi-telagi-mamdapur line) for a distance of 0.906km using lynx conductor and dismantling/releasing and restringing of assets pertaining to the work of establishing 2x20mva, 110/11kv sub-station at masuti in kolhar taluk, vijayapur district on partial turnkey basis
corrigendum : development of 132 kv line in line-out lilo of 2nd circuit of surjamaninagar tptl bodhjungnagar 132 kv double circuit line with htls conductor - as per bid document
supply, erection, testing and commissioning of 220\33kv sub-station at dwarapudi by making single lilo of 220kv vemagiri - samalkota dc line in east godavari district on turnkey basis.
supply, erection, testing and commissioning of i) 132/33kv sub station at vuyyuru (ii)02 nos 132kv bays (telecom portion only) (iii) 132kv dc line from 400kv gudivada sub station to the proposed 132/33kv ss vuyyuru in krishna district on turnkey basis
supply, erection, testing & commissioning of lilo of both circuits of existing 220kv d/c amrelivisavadar line at proposed 220kv vaghaniya (bagasara) s/s on m/c tower with al59(61/3.50) conductor with 48f opgw cable having length 7.329 km.
supply, erection, testing & commissioning of lilo of both circuits of existing 220kv d/c amreli-visavadar line at proposed 220kv vaghaniya (bagasara) s/s on m/c tower with al-59(61/3.50) conductor with 48f opgw cable having length 7.329 km
corrigendum : construction of 66kv double circuit transmission line to proposed 66kv substation hilltop, barotiwala under es division nalagarh on turnkey basis
re-conductoring and strengthening of the 132 kv mawlai to sohra single circuit transmission line and 132 kv nehu to lad nongkrem to mustem to khliehriat sub-station by acsr panther conductor and related services (line length 101.452ckm).
augmentation substation by addition of 50mva, 100/22kv ptr along with 1x100kv ais bay and 22kv gis consisting 6x22kv feeder, 1x22kv incomer bay, 1x22kv pt & interconnector bay along with allied civil works at 100/22kv mumbra ss under ehv o&m dn, kalwa vashi zone(tf will be supplied by msetcl)
design , engineering, supply of materials ,erection ,testing and commissioning of 02 nos. of 132 kv line bay at 132/33 kv gss ,saria with other civil works at turnkey basis.
corrigendum : design engineering supply of materials equipments erection testing and commissioning of 02 nos. of 132 kv line bay at 132/33 kv grid substation saria with other civil works on turnkey basis.
design, engineering, supply of materials/equipments, erection, testing and commissioning of 02 nos. of 132 kv line bay at 132/33 kv grid substation, saria with other civil works on turnkey basis.
work no. 01 external electrification (h.t. & l.t. line) in hanumat vihar housing scheme - work no. 01 external electrification (h.t. & l.t. line) in hanumat vihar housing scheme
tvt upgradation - upgradation of 66kv tvt feeders to 110kv double circuit line using acsr wolf conductor from paruthippara substation to thirumala substation
construction of double circuit 132 kv pampore khrew transmission line
construction of 66kv sc link line on 110kv nb dc towers with panther conductor for a distance of 11.070kms from 66/11kv badanaguppe sub-station to 66/11kv jannur sub-station and construction of 1 no. of 66kv terminal bay at 66/11kv badanaguppe sub-station & 1 no. of 66kv terminal bay at 66/11kv jannur sub-station in chamarajanagara taluk and district on total turnkey basis
supply, erection, testing& commissioning of 132kv 2x(3+0) 1cx800sq.mm u/g cable laying 132kv lilo chiloda from 132kv ranasan vijapur line.(from prop.ap 5/0(dd+3)cable termination tower to 132kv chiloda ss(ckt-1 &2-route length-1.40km) under ksy-ii.
supply, erection, testing and commissioning of 132/33kv elchuru sub station along with connected 132kv dc line(0.5 km) from lilo point of 132 kv marturu- vinukonda line to the proposed 132/33kv substation at elchuru in bapatla district on turnkey basis
re conductoring of existing 132kv single circuit transmission line from palatana gbpp to 132 kv udaipur sub station tptl by high temperature low sag htls conductor with allied accessories - as per bid document
corrigendum : empanelment of agencies for new 33/11kv substation, additional /augmentation of ptr at existing 33/11 kv s/s, ht lines, lt lines, dtr, service line, meter related works and any other associated works as per sor schedules in bhind circle of mpmkvvcl
empanelment of agencies for new work and any other associated works as per sor schedules in narmadapuram circle of mpmkvvcl - empanelment of agencies for new 33/11 kv substation, additional / augmentation of ptr at existing 33/11 kv s/s, ht lines, lt lines, dtr, service line, meter related works and any other associated works as per sor schedules in narmadapuram circle
empanelment of agencies for new 33/11 kv substation additional augmentation of ptr at existing 33/11 kv s/s ht lines, lt lines dtr, service line, meter related works and any other associated works as per sor schedules in circle of mpmkvvcl.
empanelment of agencies for new 33/11kv substation, additional /augmentation of ptr at existing 33/11 kv s/s, ht lines, lt lines, dtr, service line, meter related works and any other associated works as per sor schedules in circle of mpmkvv
establishing 2x5mva, 33/11kv sub-station at ujalamba village in basavakalyan taluk, bidar district and construction of 15km of 33kv s/c line from 110/33/11kv manthal muss to proposed 33/11kv ujalamba sub-station along with construction of 10km 11kv link lines on total turnkey basis.
malappuram package no.07 - supply, construction and reconductoring of 11 kv lines using ht abc, along with supply and installation of distribution transformers under dyuthi special scheme - electrical circle manjeri (part ii) - mpm pkg no.07 -supply, construction and reconductoring of 11 kv lines using ht abc,with supply and installation of dtrs for development of distribution infrastructure on a turnkey basis under ds scheme at various locations under ec, manjeri(part-ii)