FILTERS
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 41.50 to km 69.60 (including nunkhari station) involving earthwork in formation, embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), viaducts, tunnels, protection works, blt works, p.way track works with contractor's own materials (except new/sh rails), construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, tunnel ohe with rocs, tunnel lighting, tss, sp, general power supply arrangements modifications/conversion to underground for overhead electrical ht/lt power line crossings etc on epc basis in waltair division of east coast railway.
View Insights
jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleepers, special psc sleepers (for turnouts, improvised sejs, guard rails etc), points (thick web switches) & wcms crossings, glued joints, h-beam/composite sleepers over girder bridges, improvised sejs, all p-way fittings, 2x25 kv ac ohe works, 2x25 kv tss with sp/ssp works along with scada, modification/conversion to underground for overhead electrical ht/lt power line crossings, electrical general services, construction of platforms, station buildings, service buildings, sp/ssp buildings, trd depot building with tower wagon shed, residential buildings, water supply, indoor and outdoor electrification etc. on epc basis in rgda division of east coast railway"
corrigendum : lot-2a electro-mechanical works (except gsu transformer, gis, xlpe cable and switchyard equipment) of 260 mw (2x130mw) dulhasti stage-ii h.e project, kishtwar district of ut of j and k, india
conversion of existing overhead line to underground cable in banjara hills division in banjara hills circle of ghmc area of tgspdcl
conversion of existing overhead line to underground cable in cantonment division in secunderabad circle of ghmc area of tgspdcl
conversion of existing overhead line to underground cable in paradise division in secunderabad circle of ghmc area of tgspdcl
conversion of existing overhead line to underground cable in bowenpally division in secunderabad circle of ghmc area of tgspdcl
conversion of existing overhead line to underground cable in mehdipatnam division in hyderabad central circle of ghmc area of tgspdcl
conversion of existing overhead line to underground cable in saifabad division in hyderabad central circle of ghmc area of tgspdcl
corrigendum : wbsedcl / project-iii / nit / 2026-27 / ug / sasci / 03 date 03.09.2026 - conversion of overhead network into underground cable system at jalpaiguri town under jalpaiguri district within the state of west bengal under special assistance to states for capital investment sasci scheme
corrigendum : wbsedcl/project-iii/tender/ 2026-27/ug/sasci/01 date 15.09.2026 - conversion of overhead network into underground cable system at contai town under purba midnapore district within the state of west bengal under special assistance to states for capital investment sasci scheme
corrigendum : renovation and modernization work of existing 220kv /132kv / /33kv /25kv dtps switchyard including construction of new control room building and replacement of existing 132/33kv transformer at dtps
conversion of existing overhead line to underground cable in azamabad division in hyderabad central circle of ghmc area of tgspdcl
corrigendum : wbsedcl / project-iii / nit / 2026-27 / ug / sasci / 04 date 03.09.2026 - conversion of overhead network into underground cable system at balurghat town under dakshin dinajpur district within the state of west bengal under special assistance to states for capital investment sasci scheme
corrigendum : wbsedcl / project-iii / nit / 2026-27 / ug / sasci / 06 date 03.09.2026 - conversion of overhead network into underground cable system at suri town under birbhum district within the state of west bengal under special assistance to states for capital investment sasci scheme
corrigendum : wbsedcl / project-iii / nit / 2026-27 / ug / sasci / 05 date 03.09.2026 - conversion of overhead network into underground cable system at alipurduar town under alipurduar district within the state of west bengal under special assistance to states for capital investment sasci scheme
conversion of existing overhead line to underground cable in charminar division in hyderabad south circle of ghmc area of tgspdcl
conversion of existing overhead line to underground cable in asmangadh division in hyderabad south circle of ghmc area of tgspdcl
conversion of existing overhead line to underground cable in greenlands division in banjara hills circle of ghmc area of tgspdcl
corrigendum : wbsedcl / project-iii / nit / 2026-27 / ug / sasci / 02 date 03.09.2026 - conversion of overhead network into underground cable system at egra town and nandigram market area under purba medinipur district within the state of west bengal under special assistance to states for capital investment sasci scheme
conversion of existing overhead line to underground cable in begumbazar division in hyderabad south circle of ghmc area of tgspdcl
supply, installation, testing & commissioning of conversion of (1) 66kv halvad - soladi line (2) 66kv dhrangadhra - hirapur line (3) 66kv dhrangadhra - bavli line (4) 66kv surendranagar- wadhwan - rajsitapur line (5) 66kv limbdi - sayla line (6) 66kv limbdi - chornia line (7) 66kv chornia - khandiya line with acsr dog conductor into equivalent htls conductor (equivalent weight of acsr dog conductor with higher ampacity) of surendranagar circle (except gap type conductor)
operation and maintenance of lift canal system of upper indravati project in the district of kalahandi comprising all electro mechanical instrumentation equipment installed in pump house, mcc room including pumps and motors, switchyard , transmis - operation and maintenance of u.i lift canal system
sitc of c-band up-convertor, 8-channel mcpc audio encoder,dvb-s/s2 modulator and professional ird receivers for 32 nos . captive earth stations
the sitc of c-band up-convertor, 8-channel mcpc audio encoder,dvb-s/s2 modulator and professional ird receivers for 32 nos . captive earth stations
conversion of 11 kv and lt overhead line network to underground cable network in market area in mancherial municipal corporation under nagarabhivrudhi fund.
swr-sbc division- provision of additional loop line at cnpa, bspl, siga and new crossing station at pulikere (dpj-pcv) along with electronic interlocking
corrigendum : establishing 2x20mva, 110/11 kv substation at kawloor(shettikera) and construction of 110kv lilo line using lynx conductor from existing 110kv khanapura-saidapura sc line to proposed 110/11kv kawloor(shettikera) substation for a distance of 0.040km in yadgir taluk & district on partial turnkey basisincluding supply of all materials/equipments (excluding supply of 11kv switchgear) and erection (including civil works) of all materials/equipments, testing and commissioning.
work of conversion of existing 11 kv overhead line to 11 kv underground cable for kasarpal feeder phase - 1 from 33 / 11 kv sub station, sal sub station, in the jurisdiction of sub division i, bicholim, under division v, bicholim
scr construction organization: hyderabad division - secunderabad - dhone section - provision of new additional loop line (as common loop line) at divitipalli station in telangana state
corrigendum : 132kv main bus bar extension through xlpe cable, 132kv switchyard extension work, construction of 05 nos. 132kv ais bay, 132kv main bus bar strengthening from single tarantulla to twin moose for imlc shahjahanpur on turnkey basis
1. internal development works in sector-8 of the greater bareilly residential scheme, comprising sewer lines, water lines, rcc drains, parks, boundary walls, and road construction. 2. development works for sector-5 (specifically the public utility area situated between the 12.00m and 18.00m service roads) and the remaining areas of the greater bareilly residential scheme. 3. internal development works in sector-10 of the greater bareilly residential scheme, comprising sewer lines, water lines, boundary walls, rcc drains, parks, gates, and road construction (lig part). 4. internal development works in sector-10 of the scheme, comprising sewer lines, water lines, boundary walls, roads, parking areas, and earth-filling work (ews part). 5. provision of furniture for the library in sector-8 of the ramganga nagar residential scheme, as part of social and cultural amenities. 6. remaining works for the library in sector-8 of the ramganga nagar residential scheme, as part of social and cultural amenities. 7. installation of floodlights on the gateways constructed on the main roads of bareilly city (shahjahanpur road and badaun road). 8. tree plantation work at the natraj rotary and bca office rotary, located on the divider of the 45.00m wide main road stretching from natraj chowk to gau raksha chowk in greater bareilly. 9. external electrification work using underground cabling in sector-2 of the greater bareilly residential scheme. 10. construction of 11 kv underground power feeders to supply electricity to various sectors of the scheme from the 33/11 kv electrical substation currently under construction in sector-7 of the greater bareilly residential scheme. 11. external electrification work using underground cabling in sector-1 of the greater bareilly residential scheme. 12. electrification work using underground cabling in sector-04 of the greater bareilly residential scheme. 13. electrification work using underground cabling in sector-03 of the greater bareilly residential scheme. 14. road widening from barrier 20-2 to the 'bada bypass' on the pilibhit bypass road; installation of lighting on the proposed divider; and 5 years of operation and maintenance. (hindi document)
reactive power compensation at 11kv feeder level by installing capacitor units in davanagere and harihara divisions of bescom jurisdictions on total turnkey on percentage quoting basis for a period of one year
rate contract for 24v 10a dc/dc converter total qty 9000 nos
construction of balance work of cement concrete (cc) road, footpath, storm water line, retaining wall, and existing electric line shifting work from juni indore muktidham to pandrinath square via chandrabhaga main road under the kayakalp scheme.
s&t work in connection with:1. amlai (aal): extension of de of up loop l/7 at kte end with dispatch facility to 03rd line for long haul formation & goods parking line along with pathway & lighting facility.2. lorha (loa): construction of dn long haul loop (cal-1500m) by extending de of existing dn loop line no.-1 at kte end with reception facility.3. lorha (loa): construction of long haul loop line with bi- directional 3rd line for handling of long haul trains at both ends.
corrigendum : addition/ alteration/ conversion of lt overhead conductor to ug cable and connected works at jodhpur military station
repairs /rectification of faults in the ht/lt under ground cable in braz area of bescom for a period one year on total turnkey on percentage quoting basis
corrigendum : survey, design, supply, installation, testing and commissioning towers for kavach-ii
modification / diversion/ replacement of 33 kv ht / 11kv ht / lt overhead electrical crossing in to underground in bhusawal-badnera (218 rkm) section including associated work in connection with 3rd & 4th line between bhusawal- badnera section.
supply erection testing and commissioning of 33kv oh line over 3nos. towers across the godavari river from 33\11kv nellipaka ss (asr district) to 33\11kv rajeev nagar ss (eluru district) on turnkey basis
enit for round the clock maintenance for routine breakdown and preventive maintenance of 4 x 9 mw and 2 x 4 mw tg sets with all auxiliaries 66 kv switchyard and bindu barrage under jaldhaka hydel project wbsedcl dist kalimpong wb pin 734503
corrigendum : for shifting of 11 kv, lt line, dtr dp 1st call. p. a. c. 48510936.00 on electrical sor 01-01-2024 and non sor, completion period 90 days (inclusive of rainy season) - for shifting of 11 kv, lt line, dtr dp with allied accessories from the proposed paved area (sabdhawan chouraha to aayyappa mandir kalibadi road) and hema school at sabdhawan chouraha, bhopal.
corrigendum : outsourcing of rough turning/semi finishing of 6,000 numbers of box-n axles at firm premises.
corrigendum : outsourcing of rough turning/semi finishing of 6000 numbers of 25t axles at firm's premises.
supply,erection,testing and commissioning of 2nd circuit stringing of 132kv garividi-rajam dc/sc line(18.564kms) and connected bays at 132kvss rajam and 220/132kvss garividi on turnkey basis
construction of new loop line at latabor at raipur division. (this work primarily involves earthwork for formation, laying of track approx 1600 track mtrs and other associated works.)
camc for igbt based traction control converter (tcc) and loco control computer (lcc) of m/s siemens. ltd fitted in hhp locos at diesel loco shed kalyan through oem for the period of 12 months (qty 46 locos) (sanctioned under bulk rsp 2023- 24 and 2024-25)
comprehenssive annual maintenance contract (camc) of m/s autometers alliance limited make igbt based auxiliary converters of three phase electric locomotives for a period of three years through oem or oem's authorized dealer at els/vskp - qty- 29 nos.
construction of new loop line at risama at raipur division. (this work primarily involves earthwork for formation, laying of track approx 1300 track mtrs and other associated works.)