corrigendum : construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & commissioning and all appurtenant works under jurisdiction of western railway
View Insights
corrigendum : lot-1- construction of diversion tunnels, cofferdams, main dam including hm works of diversion tunnels, approach roads and bridges of kamala h.e. project (1720mw), kamle district, arunachal pradesh
construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in the state of chhattisgarh.
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between tanda road (excluding) to jamaniya (including) from km 101.29 to km 125.92 (length: 24.63 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
construction of 10 nos. elevated metro stations and viaduct, from baranagar metro station (excluding) to mangal pandey metro station (ch: 4.68 km to ch: 16.98 km approx.) in connection with baranagar- barrackpore metro corridor of kolkata metro railway line.
package- bbvs: "construction of 10 nos. elevated metro stations and viaduct from baranagar metro station (excluding) to mangal pandey metro station (ch: 4.68 km to ch: 16.98 km approx.) in connection with baranagar- barrackpore metro corridor of kolkata metro railway line, west bengal, india".
corrigendum : part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
corrigendum : design andconstruction of elevated viaduct and 12 elevated stations (including architectural finishing) viz. collectorate, panipech, ambabari, chomu puliya, vidhya nagar sec-2, vidhya nagar, vki road no 5, vki road no 9, vki road no. 14, harmada, harmada ghati & todi mod under jaipur metro phase- ii mrts
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between jamaniya (excluding) to tirla (excluding) from km 125.92 to km 147 (21.08 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
corrigendum : engineering, procurement and construction (epc) agreement with schedule g-1 for third line track between manikpur (excluding) to iradatganj (including) (ch: 1257.180 to 1340.820) including electrification & signaling works along with construction of rob on lc no. 404/c2, 406/2t, 407/2e & 418c/2e and rub in lc no 426 in connection with manikpur-iradatganj 3rd line project of north central railway
1) design and construction of elevated viaduct and 11 elevated stations (including architectural finishing) viz. b2 bypass circle, durgapura, gopalpura, gandhinagar, nehru place, ram bagh circle, narayan circle, sms hospital, ashok marg, government hostel and khasa kothi (phase-ii), architectural finishing works of 10 stations viz. prahladpura, manpura, bilwa kalan, bilwa, goner mod, sitapura, jecc, kumbha marg, haldighati gate and pinjrapole gaushala; modification of part operational corridor of phase-1 and constructing khasa kothi (phase-1) station under jaipur metro phase- ii mrts, 2) design and construction of elevated viaduct and 12 elevated stations (including architectural finishing) viz. collectorate, panipech, ambabari, chomu puliya, vidhya nagar sec-2, vidhya nagar, vki road no 5, vki road no 9, vki road no. 14, harmada, harmada ghati & todi mod under jaipur metro phase- ii mrts.
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
corrigendum : construction of viaducts at 12 locations cut and cover tunnel at 02 locations and pedestrian underpass (pup) at 01 location from km 517.250 to km 547.080 section of new nh-66 (old nh-47) in the state of kerala on epc mode
construction of 4.97 km elevated viaduct from koteshwar road dead end to start of ramp of underground section, including 4 nos. elevated stations viz. ashram road, koteshwar prachin mandir, sabarmati river, sardar nagar and design, construction and completion of 1.01 km of underground section comprising of twin cut & cover tunnel between ramp to dead end, including ramp and 01 no. underground metro station for ahmedabad metro rail project, phase-2a
corrigendum : construction of additional major bridge and its approaches across river teesta (at sevoke) starting around km 591.310 of nh-10 (old nh-31) in the district of darjeeling west bengal on epc mode under nh(o)
construction of additional major bridge and its approaches across river teesta (at sevoke) starting around km 591.310 of nh-10 (old nh-31) in the district of darjeeling, west bengal on epc mode under nh(o)
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house, staff quarter, compound wall, supplying and erecting pumping machinery including all electro-mechnical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (rhs) for industries (gidc) and rural areas of bharuch and vadodara districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch
improvement of morth identified blackspots through construction of grade separators at selected locations along nh 75 corridor bw km.216.91 to km.302.42 with an effective improvement length 25.6 km under nh(o) on epc mode in the state of karnataka
corrigendum : construction of iconic hybrid cable stayed and suspension bridge across krishna river on nh -167k (design chainage km 87.360 to km 88.437) in the states of telangana and andhra pradesh on engineering, procurement and construction (epc) basis
corrigendum : construction of 03 nos. of 3 lane robs and 07 no of vups on 6l delhi agra section old nh-2 (new nh 44 and 19) from km. 20.500 to km. 200.000 in the state of haryana and uttar pradesh on epc mode.
corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h- beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
engineering, procurement and construction (epc) tender for"construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, lc work and other miscellaneous works for 25t indian railway standard loading from raxaul (excl.) to narkatiaganj (excl.) (i.e. ch.189.400 to 227.200) (total- 37.80 km) in connection with doubling of raxaul - narkatiaganj section in samastipur division of east central railway"
construction of 3rd line work including earthwork, blanketing, minor bridges, major bridges, lc work and other miscellaneous works for 25.0t and dfc feeder route of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of chandil- madhukunda section in adra division of south eastern railway on engineering, procurement & construction (epc) mode.
engineering procurement and construction (epc) for "construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 26.292 km) in connection with the doubling of the bakhtiyarpur-rajgir - tilaiya section"
jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleepers, special psc sleepers (for turnouts, improvised sejs, guard rails etc), points (thick web switches) & wcms crossings, glued joints, h-beam/composite sleepers over girder bridges, improvised sejs, all p-way fittings, 2x25 kv ac ohe works, 2x25 kv tss with sp/ssp works along with scada, modification/conversion to underground for overhead electrical ht/lt power line crossings, electrical general services, construction of platforms, station buildings, service buildings, sp/ssp buildings, trd depot building with tower wagon shed, residential buildings, water supply, indoor and outdoor electrification etc. on epc basis in rgda division of east coast railway"
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house with panel room, staff quarter, compound wall, office building, supplying and erecting pumping machinery including all electro-mechanical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (lhs) for industries (gidc) and rural areas of bharuch and surat districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch & surat
providing project general management services for various constructionsites/sections for new line, doubling, bypass line, rob/rubs projectsbeing executed by construction organization in the jurisdiction of northwestern railway.
construction of road over bridge (rob) including roads and allied facilities at tuna tekra on engineering, procurement and construction (epc) mode
construction of four lane railway over bridge cum elevated corridor in lieu of lc no.28 on ahmedabad- botad railway line on 60.0 m wide tp road connecting sarkhej circle to sanand sarkhej road crossing over l. j circle and sanand junction at s.g. hightway, ahmedabad - on epc mode.
construction of twelve mega/major bridges between ambamahuda and kui in c/w taranga hill abu road via ambaji new bg line project in ajmer division.
corrigendum : construction of 6 lane viaduct and service road from baikampady (km.365.200) to kiocl junction (km.368.275) of nh-66 in the state of karnataka on epc mode
earthwork in formation, construction of major & minor bridges, retaining wall, drains, supply of ballast, p. way materials & track linking works, construction of building and allied works from ch 9/190 km (take-off) to ch 15/342 km (de) in connection with proposed siding for the work of rail connectivity for proposed phase-ii silo (02 nos. -20mty) at lakhanpur area of mcl at jharsuguda, odisha. pkg-ii
mcl lakhanpur phase ii - earthwork in formation, construction of major minor bridges, retaining wall, drains, supply of ballast, p. way materials track linking works, construction of building and allied works from ch 9/190 km takeoff to ch 15/342 km de in connection
corrigendum : construction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (ch. 269.000) telibandha chowk (ch. 268.000) and agrasen chowk (265.500) in raipur city portion of nh-53 at raipur-aurang section in chhattisgarh.
engineering, procurement and construction (epc) agreement for construction of new bg rail line including earth work, blanketing, minor bridges, major bridges, track works, station building, buildings and other miscellaneous works for 25t indian railway standard loading from sitamarhi (excluding) to rewasi (including) (i.e.ch. 0.700 to 12.400) (total length = 11.70km) in connection with sitamarhi-sheohar new bg rail line project in east central railway in the state of bihar
construction of two lane bridge across mahisagar river on gj sh-11, gotri-sevasi-sindhrot road km. 8/800 to 9/400 dist. vadodara
request for proposal for engineering, procurement & construction (epc) mode for construction of major bridges (34 nos) between hosapete (excl.) and ballari (excl.) stations, as part of ballari- hosapete 3rd & 4th line project.
construction of 4-lane flyover along with approaches and service roads at simrahi bazar from design ch. 170.210 km to ch. 172.250 km on nh27 (total length 2.04 km.) in the state of bihar on epc mode.
group work - (1) dhola- dhasa section - construction of lhs of size 5.00 x 4.50 m at lc no. 18 at km 24/9-25/0 in prcl section. (size 1 x 5.00 m x 4.50 m box) (2) surendranagar - dhola section: construction of rub in lieu of manned lc no.114 at km 15/7-8 on prcl line. (size 2.00 x 5.00 m x 4.00 m box). (3) surendranagar- dhola section - construction of lhs/rub in lieu of manned lc no. 115 at km 17/3-4 in prcl line. (4) surendranagar -dhola section: construction of rub in lieu of manned lc no. 116, c-class at km 20/1-2. (5) surendranagar - dhola section: construction of rub in lieu of lc no. 127 at km 32/2-3 and lc no. 129 at km 33/9 - 34/0 on prcl line. (size 1 x 5.00 m x 4.50 m box) (6) surendranagar-dhola section - construction of lhs of size 5 x 4.50 m at lc no. 128 at km 32/9-33/0 in prcl section. (7) surendranagar - dhola section: construction of rub in lieu of lc no. 148 at km 58/4-5, lc no. 156 at km 68/8-9 and lc no. 159 at km 73/0-1 on prcl line. (size 1 x 5.00 m x 4.50 m box) (8) sihor -palitana section- construction of lhs in lieu of lc no 7 at km 6/7-8. (9) sabarmati-botad section - construction of rub in lieu of manned lc no.42, c-class at km 34/6-7 (size 4 m x 5 m box) (10) sabarmati-botad section construction of rub in lieu of manned lc no. 153, b2- class at km 159/9-160/0 (size 4 m x 5 m box) (11) sabarmati-botad section: construction of rub in lieu of lc no. 105 at km 106/5-6, lc no. 116 at km 123/2- 3.
construction of doubling of track work including earthwork, blanketing, minor bridges, lc work and other miscellaneous works for 25t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the adra-sanka-rukni doubling project of adra division, south eastern railway on engineering, procurement & construction (epc) mode.
corrigendum : construction of rob at lc no.nn-1(manned) at km 2/2-3 in between njp-abfc, lc no-br-11 at km 22/1-2 between station raiganj to bamangram connecting road dalkhola to bakkhali, raiganj.
construction of fly over bridge in rewa city from college chouraha (infront of commissioner banglow) to dhekha tiraha (infront of hotel vishnu empire) on varanasi-nagpur road distt. rewa in epc mode
construction of hl bridge over the river kathajodi to connect from mukameswar to purighat(devi gada).
name of work:sw-i-guntakal division-gooty - wadi section: proposal for construction of two-lane rob in lieu of l.c. no. 213 at km. 547/5-7 at matmari station yard.bridge proper: span as 2x36.0m composite girder. approaches: span 6 x 30.0m psc girder +1 x18.46m psc girder (on matmari side) and 6 x 30.0m psc girder (on putripli side) and approach roads with reinforced earthen walls on both sides. sw-ii:guntakal division - gooty - wadi section: proposal for construction of two lane rob in lieu of l.c. no. 215 at km. 552/8-9 between matmari and marichethal stations.bridge proper:span as 1x18.0m composite girder + 1x36.0m composite girder.approaches: span 5 x 30.0m psc girder +1 x18.46m psc girder (on mallapur side) and 8 x 30.0m psc girder (on khanpur side) and approach roads with reinforced earthen walls on both sides. sw-iii- guntakal division- renigunta-gooty section proposal for construction of two-lane rob in lieu of l.c. no. 160 at km. 363/19-23 as 1x18.0m + 1x36m + 1x18m composite girder (rhs: 5x30.0m, lhs: 5x30.0m psc girder approach spans) over tadipatri-bakkapuram road between challavaripalle-tadipatri stations
corrigendum : construction of rob in lieu of level crossing no. 229 at km 1324/16-18 in between rpgu-bnar stations in vglj-cnb section & construction of rob in lieu of level crossing no. 367 at km 1126/20-22 at jhansi yard in bina-vglj section in jhansi division of north central railway.
corrigendum : const. of grade separators at rabarika chowkdi kutiyana bypass near vill. mal choliyana n vup near kutiyana vill along with standalone service road 2.20 km on porbanadar jetpur sec of nh27 in gujarat
rfp (request for proposal) for design and construction of major bridges (28 no's) with substructure, super structure, formation on approaches of 50 m on either side of the bridges and other connected protection works including surveying, soil and other connected parameters investigations, testing and commissioning the bridges in connection with doubling of chikjajur-rayadurg-ballari section of mysore and hubballi divisions in south western railway on epc mode.
construction of new 6.0 m wide fob in lieu of existing old fob at deulti, ghoraghata, jakpur, shyamchak, fuleswar, chengail, bauria, nalpur, sankail, narayan pakuria murail, bhogpur, nandaigajan and jaleswar stations (13 nos. stations).and construction of ramped subways at dasnagar and tikiapara railway stations.
provision of goods platform with approach road & retaining wall at baghauli & bansi railway station, subways at baghauli, bakhira, mehdawal, kheshraha & bansi railway station, balance work of major bridges, construction of yard drains and station area drains at various stations in khalilabad-bansi in connection with khalilabad- bahraich new b.g. rail line project in lucknow division of n.e. railway.
doubling of track between turavur - mararikulam (tuvr - makm) section:- proposed earth work in formation, modification of lcs, provision of s&t accommodation and gate lodges, provision of cable ducts , side drains, retaining walls, construction of platforms, construction of fobs, protective works, proposed extension of minor bridges, between turavur (excluding) and cherthala (excluding) stations (km 24/000- km 32/100) (tuvr-srtl reach)