FILTERS
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house, staff quarter, compound wall, supplying and erecting pumping machinery including all electro-mechnical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (rhs) for industries (gidc) and rural areas of bharuch and vadodara districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch
View Insights
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house with panel room, staff quarter, compound wall, office building, supplying and erecting pumping machinery including all electro-mechanical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (lhs) for industries (gidc) and rural areas of bharuch and surat districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch & surat
earthwork in formation, construction of major & minor bridges, retaining wall, drains, supply of ballast, p. way materials & track linking works, construction of building and allied works from ch 9/190 km (take-off) to ch 15/342 km (de) in connection with proposed siding for the work of rail connectivity for proposed phase-ii silo (02 nos. -20mty) at lakhanpur area of mcl at jharsuguda, odisha. pkg-ii
mcl lakhanpur phase ii - earthwork in formation, construction of major minor bridges, retaining wall, drains, supply of ballast, p. way materials track linking works, construction of building and allied works from ch 9/190 km takeoff to ch 15/342 km de in connection
providing and exec of fmn, pmt and surf wks incl bituminous courses, modular imb fencing with solar lights, elevated sentry posts, ilcb and foot track bet bp-56 and bp-57, incl imb rd-03 and approach rd-02 under (p) sewak in chandel district, manipur
requirement of safety fencing in kan-bdag section under sr. den/4/hwh for raising of sectional speed to 130 kmph.
doubling of track between turavur - mararikulam (tuvr - makm) section:- proposed earth work in formation, modification of lcs, provision of s&t accommodation and gate lodges, provision of cable ducts , side drains, retaining walls, construction of platforms, construction of fobs, protective works, proposed extension of minor bridges, between turavur (excluding) and cherthala (excluding) stations (km 24/000- km 32/100) (tuvr-srtl reach)
doubling of track between turavur - mararikulam (tuvr - makm) section:- proposed earth work in formation, modification of lcs, provision of s&t accommodation and gate lodges, provision of cable ducts, side drains, retaining walls, construction of platforms, construction of fobs, provision of platform shelters, protective works, proposed extension of minor bridges along with p.way works at cherthala yard (km 32/100-km 34/300) (length = 2200 m) and mararikulam yard (km 43/300-km 45/100) (length = 1800 m)
doubling of track between alappuzha - ambalapuzha (allp - ampa) section: proposed earth work in formation, modification of lcs, provision of s&t accommodation and gate lodges, provision of cable ducts , side drains, retaining walls, construction of platforms, provision of platform shelters, protective works, proposed extension of minor bridges along with p way works at alappuzha yard (km 54/100-km 58/800).
working survey, soil investigation, design, build & operate(with trial run of 3 months) contract for providing, supplying, lowering, laying & jointing rising main, gravity main and distribution pipeline, supply, installation, testing & commissioning of hscf/multistage pump with associated mechanical and electrical equipments, instruments & accessories, clear water sump, pump house, staff quarter, compound wall, approach road (r.c.c) at various hw/shw/village for 174 villages of missing link of kaprada & dharampur with 05 years of comprehensive o&m of entire scope of work. dist.: valsad
balance work of earthwork in cutting and filling in embankment with mechanical compaction, supplying, spreading and compaction of stone dust blanketing, extension of minor bridges, construction of gate lodge, extension of level crossing gates, retaining wall, demolition of infringing structures, linking of track, points & crossing, supplying, stacking & spreading of machine crushed stone ballast, transporting of p. way materials and other ancillary works from ch-48.940km. at kalyani (excluding) to ch-71.588 at ranathat (excluding) in connection with construction of 3rd line between naihati & ranaghat.
1. construction of knowledge center at t.p. scheme no. 04, seedar, f.p. no. 48 in kaliyabid-seedar-awadiya ward in bhavnagar city., 2. construction of a building for traffic in t.p. scheme no. 2, awadiya (first), f.p. no. 48/3 in awadiya-sakkar-awadiya ward in bhavnagar city., 3. construction of r.c.c. road and compound wall in savaripura ward, ghorad smshan., 4. construction of a park in bhavnagar city, nagzadi, t.p. scheme no. 3, f.p. no. 103, airport road., 5. work of laying 800 mm diameter di pipeline in hillpark area of seedar. ( gujarati image)
construction of new community health center (80 bed) at tarapur, ta-tarapur, dist-anand; new construction of chc building upgraded 80 beded with compound wall, road, electrical & furniture work at dholera ta & dist: ahmedabad.
modernization of the aptransco tlc stores at vijayawada based on master plan & architectural design: construction of peb blocks 1 & 2, common toilets, watch tower and security cabin etc., including facade works, electrification, plumbing, cc roads and platforms (2nd call)
reconstruction of damaged masonry structures and execution of other works on the kosi distributary, falling under the jurisdiction of the upper division, agra canal, mathura (district mathura), restoration and demarcation of canal land for the nandgaon distributary from km 0.000 to km 46.800, falling under the jurisdiction of the upper division, agra canal, mathura (district mathura).
corrigendum : provision of perimeter chain link fencing at umroi under ge umroi
slope stabilization along with construction of rcc retaining compound wall at raoli hill level reservoir m a road, f north ward.
corrigendum : provn addn alt of perimeter security wall with guard posts, guard rest room and security lights at certain locations at af stn awantipur
strengthening at km 9/2 - 12/8, 16/0 - 18/0 and 27/0 - 30/2 of devipattinam - nainarkoil road (via) pottagavayal road including reconstruction of culvert at km 11/6 and construction of retaining wall at km 11/8.(m-93) - strengthening at km 9/2 - 12/8, 16/0 - 18/0 and 27/0 - 30/2 of devipattinam - nainarkoil road (via) pottagavayal road including reconstruction of culvert at km 11/6 and construction of retaining wall at km 11/8.(m-93)
construction of 120.00 mtr. long span bridge (4 span of 30.00 mtr. each) (psc girder bridge at rampur on una santoshgarh road at rd 1.760 in distt. una (h.p.) (sh c o bridge with approaches, dismantling of structures like culverts, bridges, r/walls)
corrigendum : renovation works including installation of ms angles, ms chain, hook, tiles, stone, railing on public ghats situated in har ki paudi area and along right and left banks of upper ganga canal, mayapur escape channel and ghats situated in dhudhiyabundh
supply, installation, testing and commissioning of 700 digital water level recorder (dwlr) (non-vented pressure type) with telemetry, including fencing and establishment of data acquisition system along with its maintenance for real time ground water level monitoring system.
notice inviting e-tender for the work of 1st year maintenance and tagging of 60,000 tree saplings and fencing around the plantation area at dera planted by 132 eco task force for a period of one year under south forest division
construction of balance work scope of isolation bay road, txy link road and construction work of cooling pit with road fire pit road cfr roads watch towers and cng work in airside area of shirdi airport village kakadi tal kopargaon dist ahilyanagar
construction of shree jawalaji shakti vihar residential colony at jawalamukhi distt kangra hp - construction of road with toe wall retaining walls drains cutting and filling and laying paver blocks and providing drainage system etc
corrigendum : scheme for the repair of chains, railings, and flooring at various ghats located in the swargashram area on the left bank of the ganga river, under the yamkeshwar block of district pauri garhwal, for the kumbh mela 2027.
corrigendum : modernization of various rural link road (from earth work upto premix carpet including constn. of culverts,drains,ret.walls and road furniture/safety measures ) under 555 cr project distt gurdaspur mc batala group no-7
corrigendum : modernization of various rural link road (from earth work upto premix carpet including constn. of culverts,drains,ret.walls and road furniture/safety measures ) under 555 cr project distt gurdaspur mc batala g-3
corrigendum : modernization of various rural link road (from earth work upto premix carpet including constn. of culverts,drains,ret.walls and road furniture/safety measures ) under 555 cr project distt gurdaspur mc batala g-4
corrigendum : modernization of various rural link road (from earth work upto premix carpet including constn. of culverts,drains,ret.walls and road furniture safety measures under 555 cr project distt gurdaspur mc batala group no-1
work of imp./stg./wdg. of 07 nos. roads approved under work programme 2026-27 in kalka constituency. 1. link road khera to jattan majri( road id 8610), 2. link road marranwala (road id 2922), 3.link road ramnagar to sotewala (8611), 4.link road ratpu - wdg with 150 mm gsb and stg with 225 mm wbm 150mm gsb, 225 mm wbm, 80 mm ipb, retaining wall, toe wall, side drain etc. widening and stg of rad, construction of drain stg of road stg ,drain etc wbm,ipb,etc strengthening of link road pin
balance work for safety fencing along the track for running of trains in nergundi - gurudijhatia section under the jurisdiction of aden-i/cuttack of khurda road division.
corrigendum : repair, restoration, and reconstruction works at arulmigu sambomahadheva temple, mahadhevapattinam village, mannarkudi taluk, thiruvarur district. - repair and restoration works of swamy sannathi, ambal sannathi, arthamandabam, mahamandapam, yagasalai, bhairavar, suriyan sannathi, and re-construction of chandikeshwarar sannathi, compound wall, madappalli, store room, motta gopuram.
sw i: bza - roof repairs and replacement of perished doors, windows and tiles of service buildings in sse/w/east/bza section under aden/buildings/bza jurisdiction.sw ii: (i) : repairs to perished doors, cupboards, mesh doors, compound wall and brightening in officers colony under sse/w/gvpt/bza.(ii): bza- repairs to perished doors, windows, mosquito roof mesh, roof leakage, tiles, drainage and safety grills in traffic, loco and green park colony under sse/w/e/bza section. sw iii: stpm - repairs to drains, rear side compound wall, perished doors, safety grills, mosquito mesh, roof leakages etc., at east (temple) colony in sse/works/stpm under aden/buildings/bza jurisdiction.sw iv: repair works (roof leakage arresting works, repair to perished doors and windows, mesh doors and mesh to windows , repairs to balcony drops and parapet walls and safety grills etc.,) in quarters of winchpet, upyard and traffic colonies in sse/w/west/bza section under aden/buildings/bza jurisdiction.sw v: renovation and conversion of old cash office into sr.dsc/rpf office under sse/w/east/bza section.sw vi: bza- repairs to prem office at drm office compound under sse/w/east/bza section.
corrigendum : construction of new design modular fence along indo-bangladesh border ibb for plug the gap in stretch from bp no. 60/15-r to 60/24-r gin-36 total length 2.40 km in aor of bop sunder under shq krishnanagar in nadia district of west bengal.
special repair of nh 503a punjab border bankhandi una lathaiani salouni bhota at various locations from km 000 to 70000 sh construction of retaining wall breast wall wing wall rcc box culverts rcc cantilever walls covered u shape drain and patch work
work of road, drainage with water pipeline and building work. compound wall, supply of barricading, work of footpath, ms grill, central verge, sign board, rcc bench, supply of water tanker, desilting of drainage, supply of cold mix materials, manhole. (gujarati document).
corrigendum : name of proposed retaining wall on storm water nala from more mala to minatai thakre work school, lendhi nala, situated in plot no. 28, new nashik division, nashik municipal corporation, nashik.
12 class room in gbhss at thiruvalam - construction of 12 classroom, science lab, toilet blocks, compound wall and pavements in gbhss at thiruvalam in vellore district.
notice inviting e-tender for the work of 1st year maintenance and tagging of 40,000 tree saplings and fencing around the plantation area at bhatti, planted by 132 eco task force for a period of one year under south forest division
corrigendum : construction of new design fence from bp no. 868/mp to bp no. 869/mp (length - 1.857 km) at gin-285 near bop satgachi and bp no. 872/12-s (length - 150 metre) at gin-286 near bop khagrabari under ftr. hq bsf guwahati in district cooch behar of west bengal.
provision of metal beam crash barrier safety fencing for prevention of cro along the track between bnsa-tpu in pbe-tpu section under aden pbe section.
corrigendum : sbd 19 dt. 16-10-25 gate no 53 and 55 - river erosion mitigation measure by repairing no 1 reclamation spur opposite border fencing between gate no 53 and 55 near bop dharamparkash on left side of river ravi
dnit for - construction of ... - const of nsb at 08 acrs stair case girls toilet, cwsn toielt and drinking water and ramp with railing at ggps bhagwi, const of classrooms with stair case boys and girls toilet, cwsn toilet, dwater, at gps loharwara, gps imlota, distt charkhi dadri
asn division: reliability improvement of ohe by provision of anti-climbing device,anti-bird disc,double contact wire etc and other reliability improvement measures.
corrigendum : ca no ce chz chm t 03 2026 27 provn of retaining wall along bldg no 2gl and 21 gl at dagshai under ge kasauli phase iii
(i) covered godown of 1600 sqm in size 80x20x6 mtr in store depot jagadhri workshop (ii) electric work for covered godown of 1600 sqm in size 80x20x6 mtr in store depot jagadhri workshop (iii) supply and installation of automated radio shuttle pallet racking system (arsprs) as per consisting items with flooring works in store depot jagadhri workshop. (iv) providing concertina wire fencing at store depot boundary wall at judw.
corrigendum : provision of safety fencing (double w type) from mb-nbd on mb-sre section
corrigendum : construction of new design fence from bp no. 983/7-s to 983/8-s (length - 0.500kms) at gin-322 near bop cg jhora and bp no. 983/8-s to 984/mp (length - 1.000 kms) at gin-323 near bop cg jhora (total length - 1.500 km) under bsf shq cooch behar in district cooch behar of west bengal.