FILTERS
corrigendum : jambutake industrial area.. permanent water supply scheme and provision of infrastructure facilities.. construction of jackwell, approach road, approach bridge, 1.50 mld capacity water treatment plant (wtp), 300 cum elevated service reservoir (esr), 1000 cum sump, and provision of pumping machinery for water.
View Insights
construction of proposed water supply and sewerage network of block 2 package 5 at ujjain simhasth 2028 area
corrigendum : ujhana- augmentation of wa... - ujhana augmentation of water supply scheme in village. ujhana mahagram distt jind ujhana providing sewerage scheme in village ujhana (swarn jayanti mahagram yojna distt jind ujhana providing sewerage scheme in village ujhana swarn jayan
working survey, soil investigation, design, build & operate(with trial run of 3 months) contract for providing, supplying, lowering, laying & jointing rising main, gravity main and distribution pipeline, supply, installation, testing & commissioning of hscf/multistage pump with associated mechanical and electrical equipments, instruments & accessories, clear water sump, pump house, staff quarter, compound wall, approach road (r.c.c) at various hw/shw/village for 174 villages of missing link of kaprada & dharampur with 05 years of comprehensive o&m of entire scope of work. dist.: valsad
construction of high level laboratory to upgrade sickle cell institute c.g. as a center of excellence at raipur, i/c. water supply, sanitery fittings & electrification work at distt. raipur,c.g.(division no. 2, raipur).
bhiwani town (2nd and 3rd w... - augmentation of w s scheme bhiwani town construction of water works structures and boosting stations at various location including rcc ss tanks boundary wall clear water tanks pump chambers r w suction well rising main lines electric etc
corrigendum : construction of 2500 seater lecture hall g plus 3 complex along with utility cum ess block pump room ug sump including water supply and sanitary installations electrical installations vrv vrf system fire fighting and fire alarm system lift ups system lan system cctv ibms other civil and e and m development works etc for iit mandi kamand hp in epc mode i subwork/packages: construction of 2500 seater lecture hall g plus 3 complex along with utility cum ess block pump room ug sump including water supply and sanitary installations electrical installations vrv vrf system fire fighting and fire alarm system lift ups system lan system cctv ibms other civil and e and m development works etc for iit mandi kamand hp in epc mode i
corrigendum : construction of 1200 seater girls hostel with five hostel blocks (g plus 4) (blocks a,b,c,d & e) and one dining block (g plus 3) (block f) including water supply, sanitary installation, internal electric installations, fire fighting, fire alarm system, lifts, cctv, dg set, ups system, hvac, solar and development works at bhu, varanasi (sh: balance work).
survey design supply erection testing & commissioning of kalaghatgi tfs for filling up of 107 tanks located on left & right bank of river by lifting water from bedthi river on turn-key basis phase 1 work consisting of following components construction of jack well cum pump house vt pumps & ht motors, transformers, substation, transmission line rising main , distribution network for filling up of 30 tanks on left bank by ms hdpe pipes including o&m for 5 years after commissioning on turnkey basis
comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-6 nos.), ii.) single village piped water supply schemes (svs-0), iii.) ward level piped water supply schemes in quality affected wards (wls_quality-54 nos.) and iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality-369 nos.) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
corrigendum : (3rd call) godavari pushkaralu 2027 tier-1 irrigation department works at various pushkar ghats for construction of 1)asta tirthams(pakshi tirtham vyasa tirtham sangama tirtham chitsuka tirtham extension of brahma tirtham with bharathi platforms narasimha tirtham hanuma tirtha subramanya ghat and gravel road from pakshi tirtham to sironcha bridge) 2)mandapas(temples mandapas aparkarma bhavan pinda pradana mandapam toilet block) and 3) asta tirtham services (internal electrical works internal water supply and plumbing works electrical works site landscape works and site amenities at kaleshwaram(v). mahadevpur(m) jayashankar bhupalpally(d)
comprehensive operation and maintenance and special repair of 54 nos ward level piped water supply schemes (quality), 369 nos ward level piped water supply schemes (non quality) & 6 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years.
survey, design & construction of works consisting of 6 . 5 0 mld water treatment plant, over head tanks, building works, laying of pipeline, road reinstatement works & sitc of pumping plants, automation works and all other appurtenant works including civil & electro-mechanical works with 05 years o&m including supply of all materials, labour, t&p etc. required for proper completion of kaulagarah water supply scheme under amrut 2.0 programme.
construction of sewage treatment plant (stp) (8 mld at sonasavri nallah section) for interception and diversion (i and d) works along with gravity main works project of itarsi town under sbm 2.0.
canal water based water supply project for construction of 12.0 mld water treatment plant and other related works including operation and maintenance for a period of 5 years at rampura phul district bathinda, punjab under amrut 2.0 scheme.
corrigendum : 09/2026-2027/se/swc/01 - jack pushing work along railway land for laying 1400 mm dia(approx 515 m) and 1000 mm dia (approx 515 m) ms casing pipe and 1000 mm dia (approx 515 m) and 700 mm dia (approx 515 m) carrier pipe through it ...of sankrail piped water based w/s scheme
jack pushing work along railway land for laying 1400 mm dia(approx 515 m) & 1000 mm dia (approx 515 m) ms casing pipe and 1000 mm dia (approx 515 m) & 700 mm dia (approx 515 m) carrier pipe through it in between km post - 15/13x - 15/29 and laying of 1000 mm dia (approx 1325 m) ms casing pipe and 800 mm dia (approx 1325 m) carrier pipe through it in between railway ohe mast no km - 15/15x & 15/
corrigendum : construction of bus stand, workshop ,and e-bus depot nadaun, tehsil nadaun district hamirpur, h.p - part-i-civil work of bus stand , workshop, and e-bus depot i/c bus charging bay and covered parking i.e. building portion i/c ws, si , site development, boundary wall, rain water harvesting tank, septic tank, c/o pavement work, c/o approach road,
epc contract for providing, laying, jointing, testing and commissioning of ms pipeline from existing diyodarlakhani main pipeline from ch. 17.50 km (sec-2 ips to jerda) to existing ramsan sump of tspl pipeline project, taluka: deesa, district: banaskantha
corrigendum : detailed nit for balance work of retrofitting works of rwss of 97 villages and dhanies of nawa tehsil under jjm in rural area of nawa tehsil with ten years operation and maintenance (up to vtc) excluding one year dlp - as per td
development work of remaining roads, drains, sewerlines, waterlines and parks in pocket c, madhuban bapudham (part-c)
construction of national institute of open schooling (nios) at sector-40,atal nagar,village uparwara,naya raipur (c.g.) (1 no office block b plus g plus 2),1 no guest house g plus 1 & 1 no type v quarter g plus 1 icluding water supply,sanitary installation, drainage development and electrical installations.
(i) pardhade: provision of high-level platform at pardhade station of length (375x3.75mx2) (pf 1&2) (pid: 01.01.53.25.3.50.026), (ii)sirsoli- raising of platform from rail level to high level at sirsoli railway station, dn rl pf: 360 m x 4m) & up rl pf : (360m x 4m) (pid : 01.01.53.25.3.50.027), (iii)mahaswad- raising of platform from rail level/medium level (220mx 9.10m) & (144mx9.10m) to high level dn loop pf (240mx7m). (pid : 01.01.53.25.3.50.028), (iv)waghoda : raising and extension of platforms from rail level to high-level platform (555mm x6mm,) including toilet, sitting arrangement, drinking water and drainage arrangement etc. at waghoda railway station. (pid: 01.01.53.25.3.50.030), (v)dongargaon : raising and extension of platform from rail level to high level up (360m x 8m) & dn (380m x 8m), including toilet, sitting arrangement, drinking water and drainage arrangement etc at dongargaon station. (pid : 01.01.53.25.3.50.031), (vi)provision for divyangjan amenities at asirgarh, bagmar, mandwa & duskheda on railway stations.(nsg-6) (pid : 01.01.53.25.3.50.029).
package no-3 design, build, operate and transfer (dbot) of interception and diversion works in nipani, mugalakoda, naaganura, sadalga, sankeshwar, saundatti-yellamma, shedbaala and examba ulbs of belagavi district with 5 years operation and maintenance(including 2 year defect liability period) under swachh bharat mission (urban)2.0 fund
shifting of bescom utilities at orr from pes college to laggere pipeline road in package-2 of bmrcl phase-3 project.
providing, supplying, lowering, laying, jointing, hydrotesting, and commissioning of mild steel (ms) pipeline, including all associated and allied works, for the onshore laying and offshore installation of the nc9 bulk water pipeline including piling and encasing works in creek along the surajbari bridge, including all necessary crossings and structural supports at maliya, taluka maliya, district morbi. [second attempt]
design and construction of sewage treatment plant (stp) of 5.0 mld capacity at sindhi nallah section with interception and diversion (i&d) works along with gravity main works of itarsi used water management project under sbm 2.0
construction of english medium college at old central jail premises, agartala, tripura, during the year 2026-27 sh balance portion building portion including internal water supply, sanitary installation, sewage and drainage works. 2nd call
providing drinking water supply to proposed textile park (under pm mitra scheme) near nadisinoor village from proposed barrage across bhima river near madri village under dc works including operation & maintenance for a period of 5 years (including 1 year dlp) through design, build operation and transfer (dbot) mode lumpsum - no variation
corrigendum : operation maintenance and security of water supply scheme of industrial area pithampur district dhar
corrigendum : amrut- 2.0 - wss to thalassery municipality - providing dedicated water supply to kodiyeri (zone -i) and paral (zone - ii) - supplying and laying balance distribution network and providing fhtcs-pipeline work
comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply 16 scheme (pws), ii) ward level piped water supply schemes in non quality affected 157 wards (wls_non quality) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
12/proc./mpjnm/2026-27 - balance work of lump sum contract for engineering procurement construction testing commissioning trial run and operation and maintenance for 10 years of sada multi village drinking water supply scheme district gwalior
development work of remaining roads, drains, sewerlines, waterlines and parks in pocket c, madhuban bapudham scheme (part-a)
package no-01 design, build, operate and transfer (dbot) of interception and diversion works in badami, belagali, jamkhandi, kamatagi, mahalingpur, mudhol, rabkavi banhatti and shiruru ulbs of bagalkote district with 5 years operation and maintenance (including 2 year defect liability period) under swachh bharat mission (urban) 2.0 fund
1. construction of knowledge center at t.p. scheme no. 04, seedar, f.p. no. 48 in kaliyabid-seedar-awadiya ward in bhavnagar city., 2. construction of a building for traffic in t.p. scheme no. 2, awadiya (first), f.p. no. 48/3 in awadiya-sakkar-awadiya ward in bhavnagar city., 3. construction of r.c.c. road and compound wall in savaripura ward, ghorad smshan., 4. construction of a park in bhavnagar city, nagzadi, t.p. scheme no. 3, f.p. no. 103, airport road., 5. work of laying 800 mm diameter di pipeline in hillpark area of seedar. ( gujarati image)
chikhaldara water supply scheme, taluka chikhaldara, district amravati (under msjnm).
comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply 16 scheme (pws), ii) ward level piped water supply schemes in non quality affected 110wards (wls_non quality) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
intercepting sewer line, gravity main, treated effluent main, 10.00 mld sewage treatment plant at nagar palika parishad mahoba, district mahoba.
construction of 75.00 mtr wide peripheral road and sewer line between sector-5 and sector-6, yeida. wc-3
comprehensive operation and maintenance of surface water based cheriya bariyarpur multi village pipe water supply scheme of capacity 5.65 mld including supply of manpower, maintenance of infrastructure and mechanical parts, maintenance of fhtc, scada and electricity payment of electro mechanical parts including building, lighting and other accessories of wtp based on actual consumption of electricity. covering 70 wards under five panchayat (sripur, khajapur, pabra, bariyarpur, sahpur) of cheriya bariyarpur block under p.h.division, teghr a in district begusarai for five years. salient features of cheriya bariyarpur mvs:- 1. source river gandak a. intake well (6.73 mld) b. gangway 2. water treatment plant (5.65 mld) a. pre settling tank - 2nos b. pst pump house - 1 nos c. cascade aerator 1 nos. d. flash mixer 1 nos. e. clarifloculutor-1 nos. f. filter house - 1nos. g. clear water reservoir (800 cum) & pump house- 1 nos. h. backwash sump-1 nos. 1. centrifuge building j. chemical house k. staff quarter l. mesr (750 kl) staging-26 mtr and five zonal esr (175 kl-470kl with (12 meter-17 meter) stagging m. boundry wall n. rising main -11634 mtr. o. distribution main-72150 mtr. p. total pump capacity-235.5 kw(approx) q. total no. of house connection-12343 no.
construction of 75.00 mtr wide peripheral road and sewer line between sector-09 and airport yeida wc-03
work for water rejuvenation project including ghat redevelopment, riverfront development and allied infrastructure along the kshipra river in ujjain package 2
(1) provision of waiting hall with halt agent room, toilet, drinking water facility & divyangjan facilities at (i) morda tanda & (ii) mohadi railway station.(pid: 01.01.53.25.3.50.040).(2) mordad tanda: -provision of high-level platform of 410 m x6 m at mordad tanda station. (pid: 01.01.53.25.3.50.028).(3)naydongri provision of high-level island platform (300m x 9.20m) at nayadongri railway station. (pid: 01.01.53.25.3.50.028).(4)mohadi :- proposed high-level platform of (410 m x6 m) with station building and minimum essential amenities including divyangjan facilities. (pid: 01.01.53.25.3.50.031)(5)galan - provision of high-level platform up & dn (410mx6m) at galan railway station. (pid: 01.01.53.25.3.50.031)(6) hirapur: proposed raising of rail level pf to high level platform pf no 1 & 2/3 (island) at hirapur railway station (300.00m x9.00m) (pid: 01.01.53.25.3.50.027).(7) provision of divyangjan amenities at nagardevla railway stations (nsg-6) (pid : 01.01.53.25.3.50.029)
package no-12 design, build, operate and transfer (dbot) of interception and diversion works in bankapura, hanagal, hirekerur and savanur ulbs of haveri district with 5 years operation and maintenance(including 2 year defect liability period) under swachh bharat mission (urban)2.0 fund
improvement of imphal planning area water supply system at chinga wtp and singjamei chanam pukhri mapal
corrigendum : canal water based water supply project for construction of 5.00 mld water treatment plant wtp and other related works including 5 years o and m part 2 at samrala town district ludhiana punjab under amrut 2 scheme
design, construction, successful testing and commissioning of water supply scheme pulwama town under urban development sector-capex budget on epc mode for an amount of rs. 1786.23 lacs. - same as above