FILTERS
corrigendum : drinking wsp for 1473vill of chittorgarh pratapgarh rajsamand udaipur district from jakhamdam under jjm pkg2
View Insights
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 41.50 to km 69.60 (including nunkhari station) involving earthwork in formation, embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), viaducts, tunnels, protection works, blt works, p.way track works with contractor's own materials (except new/sh rails), construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, tunnel ohe with rocs, tunnel lighting, tss, sp, general power supply arrangements modifications/conversion to underground for overhead electrical ht/lt power line crossings etc on epc basis in waltair division of east coast railway.
corrigendum : work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house, staff quarter, compound wall, supplying and erecting pumping machinery including all electro-mechnical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (rhs) for industries (gidc) and rural areas of bharuch and vadodara districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch
construction of 200 mld stp and 150 mld tertiary treatment plant alongwith treated water distribution network upto narol industries and other associated works at old pirana, ahmedabad, gujarat
corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h- beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
sauni yojana additional link 2&4 engineering, procurement and construction (epc) contract for construction of pumping station at wadhwan bhogavo ii reservoir and supplying and laying of twin ms pipeline of 3200 mm dia. (id) and plate thickness of 18.5 mm from pumping station to link-4 package-1 approach channel (22.074 km length) with all allied works etc. complete including operation and maintenance of the commissioned project for 10 years
corrigendum : work for construction of water treatment plants cwrs and cwphs near wtps clear water transmission main from wtp various ipss laying of rising mains to different esrs construction of esrs distribution system in villages providing fhtcs including
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house with panel room, staff quarter, compound wall, office building, supplying and erecting pumping machinery including all electro-mechanical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (lhs) for industries (gidc) and rural areas of bharuch and surat districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch & surat
corrigendum : contruction of industrial buildings and other infrastruture at bhabha atomic research centre, dodda ullarthi challekere taluk, chitradurga district karnataka. sh construction of various precast rcc buildings and peb buildings including other ancillary buildings such as canteen, gas bank , project house , entry portal in zone-i(gate complex with security gate), entry portal in zone -ii (gate complex with security gate), guard houses,fire pump house, pump room for rain water harvesting sewage treatment plant , site development works, specialised works, local body approvals, and other miscellnious works including internal water supply, sanitory installations drainnage and comprehensive electrical and mechanical services comprasing substation equipment, dg sets, internal electrical installaitons and fans lt panels cabling lighting protection system, fire alarm and public addresss system.........and other specialised e&m services (package-ii)
corrigendum : sewerage projects in 30 ulbs under sbm 2.0 under the jurisdiction of adilabad, karimnagar and warangal ph divisions (package-i) under ls contract system with hybrid annuity model
construction of residential towers at bacheli complex under capacity expansion of bailadila iron ore deposit-10/11a, nmdc bacheli, chhattisgarh comprising 5 nos. type-iii residential towers (s+10), 1 no. type-iv residential tower (s+10), 2 nos. staff hostels (s+10), 2 nos. executive studio apartments(s+10), 3 nos. transit and apprentice hostels(s+10), 1 no. shopping complex and guest house (g+1), 2 mld stp, site development (civil, water supply and firefighting works), external electrical works and demolishing works on epc mode
construction of gravity pipe network for filling up of tanks to provide drinking water to thippasandra & kudur hoblies in magadi taluk off-taking from chinage 30.030 km of tg halli ramanagara gravity feeder under yettinahole project comprising of supply, installation, testing and commissioning of gravity ms/hdpe pipes including structures.
design, construction and commissioning of peb sheds, structures, buildings, water supply arrangement, drainage, sewerage, fire fighting works, road works, track works, traversers, shower testing arrangements, static and oh water tanks, tubewells, parking facilities, boundary wall/fencing, eot cranes, supply installation and commissioning of machinery and plant, electric substations, and power supply arrangements, general electrical works, associated telecom & it works etc. i.e. including all civil, electrical, mechanical, it & telecom works in connection with construction of new workshop at rail coach factory (rcf), kapurthala, punjab (india) on epc mode.
providing, supplying, lowering & laying of integrated ms gravity main disposal pipeline for conveying of treated sewage from f.p. no. 332 and 327, tp-84 stp to treated water pumping station at f.p. 105, t.p. 37 (variyav), surat municipal corporation (part-b).
design, supply, installation, testing, and commissioning of a sewage treatment plant (open technology) of 143 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years for of tp 84 (kosad-bharthana kosad-mota varachha-abrama) & tp 86 (kosad) under in new east (sarthana) zone-b, surat municipal corporation. (w-22).
architectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at six 06 elevated stations
design, supply, installation, testing, and commissioning of a sewage treatment plant (open technology) of 143 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years for of tp 84 (kosad-bharthana kosad-mota varachha-abrama) & tp 86 (kosad) under in new east (sarthana) zone-b, surat municipal corporation.
design build and operate contract for comprehensive water supply improvement works for jirania panisagar kamalpur and teliamura cluster va towns of tripura
corrigendum : pre qualifcation bid of hosatel 09 - construction of new hostel 09 of 1000 students capacity ground plus 13 upper floors including civil works finishing works water supply and sanitary installations internal electrical installation cable laying fire-fighting system automatic fire a
providing, supplying and laying of 2235 mm od and 17.5 mm th. ms rising pipeline from proposed twps at f.p. 105, tp-37 (variyav) to tena khadi, surat municipal corporation.
corrigendum : 60 mld stp north zone - construction of mps of capacity 120 mld (peak flow) construction of 60 mld stp providing laying jointing testing and commissioning of following pipelines and other works as under at north zone gausabad amritsar town district amritsar under amrut 2.0
architectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at five 05 elevated stations
design, supply, installation, testing, and commissioning of a sewerage treatment plant (open technology) of 100 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years at valak in new east zone-b(sarthana) of surat municipal corporation.
ph&me department - kuppam area development authority (kada) - design & construction of integrated water supply, underground drainage, storm water drainage and underground power supply system for the priority area of kuppam municipality under hybrid annuity model (ham)
construction of proposed water supply and sewerage network of block 1a and 1b package 4 at ujjain simhast 2028 area
engineering, procurement, design and construction of m.s. & h.d.p.e. lift irrigation pipeline project for transmission of 100 cusecs of water tapping from jalundra-madhavgadh pipeline by providing, supplying and laying of various dia. & thickness m.s. & h.d.p.e. pipe for filling enroute ponds of dahegam taluka of gandhinagar district with opreration and maintenance of project for 10 years including 3 years defect liability period
corrigendum : composite works of construction of office building (2b plus g plus 12 stories) for delhi pollution control committee with rcc framed structure design including water supply, sanitary installation, internal etc..
corrigendum : survey, investigation, preparation of design & drawings, installation, testing and commissioning of lift irrigation scheme consisting intake canal, jackwell cum pump house, pumping machinery, rising main, bleeders and manifolds, pipe distribution network with ms/hdpe/o-pvc pipes including structures all along the pipe distribution network for providing irrigation facility to 1765.0 ha of left out area in jamakhandi and mudhol taluks, bagalkot district on turnkey basis
work of design, manufacture, supply, replacement & commissioning of 350nb and 200 nb cast basalt lined pipes and fittings with existing m.s.erw pipes of ash disposal for koradi 3x660mw project.
construction of proposed water supply and sewerage network of block 3 and 4 package 6 at ujjain simhasth 2028 area
corrigendum : rehabilitation & modernization of bulk and semi- bulk water supply system in visakhapatnam under ucf scheme
corrigendum : kharak kalan and khurd, dis... - augmentation water supply system in village kharak kalan and khurd construction of stp mps and ips laying of sewer line and construction of manholes
riverfront development project phase-i of amreli, dist. amreli, gujarat under sjmmsvy (re invitation) : construction of riverfront development work phase-i (civil, electrical, water supply, sewerage, storm water, irrigation & horticulture works including 3 years of maintenance after commissioning) for phase-01 from somnath mahadev mandir bridge to kamnath bridge for 0.76 km of thebi riverbank and from amreli kukavav bridge to kamnath bridge for 0.89 km of vadi riverbank within town of amreli, dist. amreli, gujarat under programme of sjmmsvy
construction of model bus station at kuppam, chittoor district (including civil works, yard work, water supply & sanitary arrangements, electrification, firefighting system, havc works, cctv and pa system, stp works and land scrapping works) (payment mode through nidhi portal govt. of ap)
corrigendum : chang, part a-dnit for ra... - construction of stp mps and ips laying of sewer lines and construction of manholes augmentation water supply system in village chang
under ground pipe line irrigation gravity flow with micro irrigation system in the command area of jlmc and its system from rd 45.630km to rd 82.64km of sip, laxmiposi, mayurbhanj, odisha. on epc turn key basis including o and m for 5 years
development works including construction of asphalt roads (18m, 12m, 9m & 7.5 m wide), rcc drains, culverts, sinking of borewell with pump installation and hdpe rising main, construction of 10 ll oht & 5 ll sump with pump house, layout electricficaton, compound wall, and footpath for dr. qamar-ul-islam residential project ( 50-50 sharing porject ) at hagaraga village in kalaburagi taluku & district.
construction of proposed water supply and sewerage network of block 2 package 5 at ujjain simhasth 2028 area
working survey, soil investigation, design, build & operate(with trial run of 3 months) contract for providing, supplying, lowering, laying & jointing rising main, gravity main and distribution pipeline, supply, installation, testing & commissioning of hscf/multistage pump with associated mechanical and electrical equipments, instruments & accessories, clear water sump, pump house, staff quarter, compound wall, approach road (r.c.c) at various hw/shw/village for 174 villages of missing link of kaprada & dharampur with 05 years of comprehensive o&m of entire scope of work. dist.: valsad
construction of high level laboratory to upgrade sickle cell institute c.g. as a center of excellence at raipur, i/c. water supply, sanitery fittings & electrification work at distt. raipur,c.g.(division no. 2, raipur).
development works including construction of asphalt roads (18m, 12m & 9m wide), rcc drains, culverts, sinking of borewell with pump installation and hdpe rising main, construction of 10 ll oht & 5 ll sump with pump house, layout electrification, compound wall, footpath & construction of 1.0 mld stp at kusnoor village in kalaburagi taluka & kalaburagi district
construction of balance irrigation network by providing irrigation facilities to culturable command area (cca) of 3382.10 ha. through the construction of a pipe distribution network under a gravity irrigation system on saoli minor no. 9 at river distance (rd) 19800 m, saoli minor no. 10 at river distance (rd) 20280 m, saoli.
corrigendum : construction of 1200 seater girls hostel with five hostel blocks (g plus 4) (blocks a,b,c,d & e) and one dining block (g plus 3) (block f) including water supply, sanitary installation, internal electric installations, fire fighting, fire alarm system, lifts, cctv, dg set, ups system, hvac, solar and development works at bhu, varanasi (sh: balance work).
creation of balance irrigation potential 910 ha. by providing irrigation facilities to ica 1598 ha. by construction of pipe distribution network for yergaon distributory offtaking at km 38.270 on asolamendha main canal of gosikhurd project
survey design supply erection testing & commissioning of kalaghatgi tfs for filling up of 107 tanks located on left & right bank of river by lifting water from bedthi river on turn-key basis phase 1 work consisting of following components construction of jack well cum pump house vt pumps & ht motors, transformers, substation, transmission line rising main , distribution network for filling up of 30 tanks on left bank by ms hdpe pipes including o&m for 5 years after commissioning on turnkey basis
corrigendum : (3rd call) godavari pushkaralu 2027 tier-1 irrigation department works at various pushkar ghats for construction of 1)asta tirthams(pakshi tirtham vyasa tirtham sangama tirtham chitsuka tirtham extension of brahma tirtham with bharathi platforms narasimha tirtham hanuma tirtha subramanya ghat and gravel road from pakshi tirtham to sironcha bridge) 2)mandapas(temples mandapas aparkarma bhavan pinda pradana mandapam toilet block) and 3) asta tirtham services (internal electrical works internal water supply and plumbing works electrical works site landscape works and site amenities at kaleshwaram(v). mahadevpur(m) jayashankar bhupalpally(d)
construction of sewage treatment plant (stp) (8 mld at sonasavri nallah section) for interception and diversion (i and d) works along with gravity main works project of itarsi town under sbm 2.0.
canal water based water supply project for construction of 12.0 mld water treatment plant and other related works including operation and maintenance for a period of 5 years at rampura phul district bathinda, punjab under amrut 2.0 scheme.