FILTERS
corrigendum : provn of all weather water supply system with insulation for 04 x single officers accommodation p 289 p 291 p 292 and p 293 at the corps officers mess under age br ii of ge 865 ews leh
View Insights
construction of well and pipeline laying work for improvement water supply system in villages machind and karai.
laying of new potable water supply lines at various locations within chafekarnagar, model colony, dnyaneshwar paduka chowk area in ward no. 12 d.
operation & maintenance of distribution system and rising main pipeline (ci/di/upvc) of different ground based piped water supply scheme for shyamnagar w/s ,palsonda w/s & adjoining mouzas under tehatta i,tehatta ii block under kalyani sub-divn- i under nadia divn, phe dte. for the period of one year.
corrigendum : ge 861 ews-09(t)/2026-27 - repair / maint of external water supply distribution system at kheruh and sher-e-shali under ge 861 ews
work: installation of 90mm pvc pipeline for water supply system in mohalla sewarampur, sansaarpur extended area and blacktopping of connecting lanes and roads. length: 650m.
nit no. 30/1/ee(c)-35(2026-27) - repair and maintenance of water supply system by repairing of water line leakages upto 300mm dia. di/ci/ms, repairing of damaged water connections, removal of water contamination in ward no. 32 in mundka ac-08 under ee(c)-35/se(c)-03
nit no. 30/2/ee(c)-35(2026-27) - day to day repair and maintenance of water supply system by repairing of water line leakages 100 to 300 mm dia of di/ci/ms and repairing of damaged water connections, removal of water contamination in ward no 33 in mundaka ac08 under ee(c)-35/se(
construction of drinking water facility with rcc(shed) at 3(three) locations under 15th fc tied grant(1st instalment of tied grant for the year 2023-24 during the year 2024-25).
maintenance of water supply system illumination of street lights along the road leading to 10 000 cum mbr at gogal
wbphed/ee/bd-i/niet-03of 2026 - 2027 - day to day operation and maintenance of distribution system and rising main pipe line (ci / di / upvc/hdpe) and allied works of choa, hariharpara and kismat emadpur ground water supply scheme
day to day operation and maintenance of distribution system and rising main pipe line (ci / di / upvc/hdpe) and allied works of choa, hariharpara and kismat emadpur ground water supply scheme under berhampore division-i, p.h.e. dte. in the district of murshidabad. period: for ten (10) months.
corrigendum : repair maint of external water supply system and external electrification at kausani under ge ranikhet
operation & maintenance of water supply system, rising main and allied pipe lines along all components at jnm hospital, college, hostel, quarters complex under nadia division phe. dte. for one year.
dikadla mggby- providing distribution system and 1 no. pvc tubewell
corrigendum : o and m water supply schemes annual maintenance of distribution system in rwss to nedumpuram and peringara grama panchayaths for the year 2026 27 pipe line work general civil work
construction of boundary wall, drinking water facility toilet and poshan vatika at ps aamjora, g.p. tilabad under block sunderpahari in godda district group no. 2 nit no. 04/2026-27 & nit no. 07/2026-27 group no.06 .
attending to leakages of the water supply distribution system for a period of 12 months in divisions no. 46, 56, 57, kondalampatty zone.
maintenance of water supply system repairs, replacement of failed damaged parts of 3 3 kv motor feeder and soft starter panel no 4 at verna pumping station
maintenance of water supply system supply of ready to use compact dry plates for testing of water samples in the laboratories under ddw in the state of goa
strengthening of industrial water supply system at rubber park irapuram construction of two 150 mm diameter borewells as contingency water sources at site a site b including allied works
corrigendum : repair/maint of external water supply system and external electrification at almora under ge ranikhet
repair/ maintenance of water supply distribution system alongwith pump repair and cleaning of oh tanks, ug sumps with allied works at afs under ge (af) sambra - repair/ maintenance of water supply distribution system alongwith pump repair and cleaning of oh tanks, ug sumps with allied works at afs under ge (af) sambra.
dnit for consultancy services for survey of providing replacement of water supply system and providing sewerage system in village mandothi and preparation of dpr, dnit and drawings for village mandothi distt. jhajjar and all other works contingent
(racall) detailed project report for... - augmentation water supply system in village kharak kalan and khurd
gokulpur_pwss_o_and_m - day to day operation and maintenance of distribution system and rising main for gokulpur pwss under kharagpur sub division of midnapore division phe dte.
day to day operation and maintenance of distribution system and rising main pipeline (ci / di / upvc / hdpe /fhtc) and allied works, including arsenic cum iron removal plant of modified sujapur sadipur model (capacity - 30.00 cum/hr) of moktarpur piped water supply scheme within nawda block under berhampore division-i, phe dte.in the district of murshidabad.: period: for 10(ten) months.
2026_phed_5022975_2 - day to day operation and maintenance of distribution system and rising main pipeline (ci / di / upvc / hdpe /fhtc) and allied works, including arsenic cum iron removal plant of modified sujapur sadipur model (capacity - 30.00 cum/hr) of moktarpur p
operation and maintenance of water supply systems - supply of 110mm dia 6kg cm2 pipe and making foundation of hand pump , operation and maintenance of water supply systems - supply of 32 mm dia g i pipe of medium class , operation and maintenance of water supply systems - gl to 20m b g l , operation and maintenance of water supply systems - 20b g l to 40m b g l , operation and maintenance of water supply systems - 40b g l to 50b g l , operation and maintenance of water supply systems - lowering of pvc assembly compressing of pvc ribbed complete in all , operation and maintenance of water supply systems - installation of india marka ii hand pump assembly in to pvc assembly as per instruction of engineer , operation and maintenance of water supply systems - development of bore by pumping with pump or by manual contr , operation and maintenance of water supply systems - hiring charge for necessary t&p and equipment required for installation of hand pump complete
m and r to water supply distribution system at various places in zone no. 3
m and r to water supply distribution system at mayurban colony, predarshni indiranagar, gadiya vihar in zone no. 07
improvement of water supply system at 51 i sup pi asc under ge mis mhow
corrigendum : p/l water supply line and interlocking tiles in street bathinda road to nikka singh gill house in clude branches w no.1
various essential development works including compound wall, shaded shed, and drinking water system at moksh dham parisar located in village tatiyawas, gram panchayat rampura dabri.
various essential development works including boundary wall construction, shaded shed erection, and drinking water system installation within the mokshdham complex, located in gram tantiawas, gram panchayat rampura dabdi.
5. o m water supply schemes annual maintenance of distribution system in rwss to thiruvanvandoor grama panchayat for the year 2026 27 pipeline work under nedumpuram section general civil work
nit no- 2027/phe(c)/bmc , dated-11/09/2026 - stabilization of water supply line by shifting existing water supply line at karunamoyee housing estate g block within sector -ii under bidhannagar municipal corporation . (fund- deposited fund)
2026_phed_5022975_4 - day to day operation and maintenance of distribution system and rising main pipe line (ci / di / upvc/hdpe/fhtc) and allied works of selamatpur piped water supply scheme within murshidabad-jiaganj
day to day operation and maintenance of distribution system and rising main pipe line (ci / di / upvc/hdpe/fhtc) and allied works of selamatpur piped water supply scheme within murshidabad-jiaganj block under berhampore division-i, phe dte. in the district of murshidabad.: period: for ten (10) months.
2026_phed_5022975_5 - day to day operation and maintenance of distribution system and rising main pipe line (ci / di / upvc / hdpe /fhtc) and allied works of ramnachandpur zone - ii (part - b) piped water supply scheme within nawda
day to day operation and maintenance of distribution system and rising main pipe line (ci / di / upvc / hdpe /fhtc) and allied works of ramnachandpur zone - ii (part - b) piped water supply scheme within nawda block under berhampore division-i, phe dte. in the district of murshidabad.: period: for 10(ten) months.
day to day repair, operation & maintenance of distribution system, rising main and allied pipelines (ci/di/upvc/hdpe/gi), valves, valves chambers, stand posts including repairing of fhtc connection and providing new fhtc connection for moubelia pipe water supply scheme under birbhum division, p.h.e. dte. (period:- for 01 (one) year)
construction of permanent drinking water facility in ward no. 01 shri kaal bhairav temple parking area
day to day repair, operation & maintenance of distribution system, rising main and allied pipelines (ci/di/upvc/hdpe/gi), valves, valves chambers, stand posts including repairing of fhtc connection and providing new fhtc connection for andhargram piped water supply scheme under birbhum division, p.h.e. dte. (period:- for 01 (one) year)
wbiw/ee/bid/e-nit-04/2026-27/4 - annual maintenance of water supply system at magazin building campus gandhi colony campus driver shed campus bungalow campus office campus of berhampore irrigation office under bisd of bid for the period of 1 year
niet-07/ae/bsd/2026-2027,sl-1 - operation maintenance of distribution system ,rising main, sluice valves, including operation of sluice valves for khundkuri pwss of khandaghosh block within burdwan sub-division under burdwan division, phe dte period for 1(one)year
2026_phed_5022975_3 - day to day operation and maintenance of distribution system and rising main pipe line (ci / di / upvc/hdpe/fhtc) and allied works of bali zone - iii piped water supply scheme within nawda
day to day operation and maintenance of distribution system and rising main pipe line (ci / di / upvc/hdpe/fhtc) and allied works of bali zone - iii piped water supply scheme within nawda block under berhampore division-i, phe dte. in the district of murshidabad.: period: for 10(ten) months.
1. sugarcane cutting as per requirement in kartik mela garhmukteshwar fair area. 2. construction of complete road from sector road 01 to 13. 3. for sprinkling system and drinking water system in the entire fair area. 4. complete on rent for salalai dome, gota khor, life jacket and safety net. 5. floating barricading including installation on rent in the entire fair area. 6. arrangement of mobile toilets in various areas in kartik mela garhmukteshwar. 7. handpump arrangement including removal in the entire fair area. 8. stage construction for cultural programs and sound system of excellent quality, seating arrangement for people including chairs and sofas up to 03 feet 0 inches height. 9. for laying mats on rent in the fair area in tents. 10. additional arrangements in the fair including jcb, roller and crane etc. 11. loudspeaker, public address system, complete sound system in the entire fair area. 12. for additional lighting arrangements in mela garh, petromax. 13. arrangement of large air balloons for identification in the fair. 14. complete work including installation and removal of flex hoardings for extensive publicity in the fair. 15. arrangement of long-distance sound and fiber in the fair. 16. arrangement of various plants and pots for beautification of kartik mela garhmukteshwar..
construction of tubewells and wells for community drinking water supply system in gram panchayat 11lnp and 16ml.