FILTERS
construction of gpra at amaravati, the new capital city of andhra pradesh. sh: planning, designing and construction of 1504 residential quarters comprising 600 type-ii quarters in 3 towers ( g plus 24 each), 600 type-iii quarters in 3 towers ( g plus 24 each), 228 type-iv quarters in 3 tower ( g plus 18 each), 56 type-v quarters in 1 tower ( g plus 13) and 20 type-vi quarters in 1 tower ( g plus 9), with a common double basement, ancillary building ( g plus 4), boundary wall, entrance gate complex, electrical substations, underground water sump with pump room, sewage treatment plant and all associated civil, electrical, mechanical, horticulture and development works and services, complete on engineering, procurement and construction (epc) mode-i. subwork/packages: package
View Insights
construction of 200 mld stp and 150 mld tertiary treatment plant alongwith treated water distribution network upto narol industries and other associated works at old pirana, ahmedabad, gujarat
corrigendum : contruction of industrial buildings and other infrastruture at bhabha atomic research centre, dodda ullarthi challekere taluk, chitradurga district karnataka. sh construction of various precast rcc buildings and peb buildings including other ancillary buildings such as canteen, gas bank , project house , entry portal in zone-i(gate complex with security gate), entry portal in zone -ii (gate complex with security gate), guard houses,fire pump house, pump room for rain water harvesting sewage treatment plant , site development works, specialised works, local body approvals, and other miscellnious works including internal water supply, sanitory installations drainnage and comprehensive electrical and mechanical services comprasing substation equipment, dg sets, internal electrical installaitons and fans lt panels cabling lighting protection system, fire alarm and public addresss system.........and other specialised e&m services (package-ii)
corrigendum : planning, designing, engine... - planning, designing, engineering, procurement, construction, installation, testing, commissioning of 50 mld capacity common effluent treatment plant (cetp) based on physico-chemical, biological (extended aeration process)
request for qualification cum request for proposal for design and construction of common effluent treatment plant (cetp) of 20 mld capacity on epc basis in dholera special investment region, dholera
request for qualification and request for proposal for design and construction of common effluent treatment plant (cetp) of 20 mld capacity on epc basis in dholera special investment region, dholera
corrigendum : design and construction of ... - construction of 200 mld main pumping station (mps) and 100 mld stp along with power generation
corrigendum : design and construction of ... - design and construction of 400 mld main pumping station mps and 100 mld stp along with power generation and oandm for 10 years after completion of 1 year defect liability period at behrampur gurugram and all other works contingent thereto
design, supply, installation, testing, and commissioning of a sewage treatment plant (open technology) of 143 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years for of tp 84 (kosad-bharthana kosad-mota varachha-abrama) & tp 86 (kosad) under in new east (sarthana) zone-b, surat municipal corporation. (w-22).
design, supply, installation, testing, and commissioning of a sewage treatment plant (open technology) of 143 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years for of tp 84 (kosad-bharthana kosad-mota varachha-abrama) & tp 86 (kosad) under in new east (sarthana) zone-b, surat municipal corporation.
design, supply, installation, testing, and commissioning of a sewerage treatment plant (open technology) of 100 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years at valak in new east zone-b(sarthana) of surat municipal corporation.
pollution abatement works for river mahananda at siliguri municipal town (interception & diversion with stp) in west bengal state, including operation & maintenance period of 15 years through hybrid annuity based ppp mode under namami gange mission-ii. (453)
corrigendum : nit no. 11(2026-2027) ee(sdw)vi/item no.1 - supply, installation, testing and commissioning of sludge management system at various stps of delhi jal board (sludge district-3, keshopur stp ph-i, ii and iii)
corrigendum : nit no. 11(2026-2027) ee(sdw)vi/item no.2 - supply, installation, testing and commissioning of sludge management system at various stps of delhi jal board (sludge district-4, rithala phase i, ii and rohini stp)
corrigendum : kharak kalan and khurd, dis... - augmentation water supply system in village kharak kalan and khurd construction of stp mps and ips laying of sewer line and construction of manholes
bid documents for design, construction, erection, testing and commissioning of 53 mld sewage treatment plant at kanakpur kansad for newly added area of new south zone, surat municipal corporation. (including 10 year of operation and maintenance)
design, supply, installation, testing, and commissioning of a sewerage treatment plant (open technology) of 42 mld capacity, including piping, mechanical, electrical, and instrumentation components, complete with operation and maintenance for up to ten years at saniya hemad for newly added area of new east drainage zone-a (varachha), surat municipal corporation.
construction of model bus station at kuppam, chittoor district (including civil works, yard work, water supply & sanitary arrangements, electrification, firefighting system, havc works, cctv and pa system, stp works and land scrapping works) (payment mode through nidhi portal govt. of ap)
corrigendum : chang, part a-dnit for ra... - construction of stp mps and ips laying of sewer lines and construction of manholes augmentation water supply system in village chang
design and construction of ... - design and construction of 90 mld main pumping station (mps) and 40 mld stp on sbr technology
c/o multilevel parking at dr. radha krishanan medical college hamripur at jolsapper tehsil nadaun distt. hamirpur (hp) - part i civil work c/o building portion i/c w.s. and s.i. rain water harvesting tank, septic tank, site development, fire fighting, water storage tank, approach road boundary wall etc.) part-ii-electric work (sh- sitc, electrical installation, fire
corrigendum : nit no. 11(2026-2027) ee(sdw)vi/item no.3 - supply, installation, testing and commissioning of sludge management system at various stps of delhi jal board (sludge district-1, coronation pillar phase i and ii, iii and new stp)
development works including construction of asphalt roads (18m, 12m & 9m wide), rcc drains, culverts, sinking of borewell with pump installation and hdpe rising main, construction of 10 ll oht & 5 ll sump with pump house, layout electrification, compound wall, footpath & construction of 1.0 mld stp at kusnoor village in kalaburagi taluka & kalaburagi district
corrigendum : amrut 2 0 design construction commissioning trial running operation and maintenance for a period of 5 years of 5 mld stp at alissery along with 11.838 km sewage collection network in ward no34 and 35 old of alappuzha municipality and allied works
corrigendum : survey, investigation, design, constuction testing and commisioning of 15 mld stp and associated treated water reuse system in bargarh municipality including o and m for 10 years
establishment, commissioning of 6.0mld regional combined sewage & effluent treatment facility (rcsetf) civil/common infrastructure installed treatment machinery zero liquid discharge (zld) on turnkey basis including operation & maintenance of entire plant for a period of 5 years at mundargi 4th phase industrial area, ballari district.
construction of sewage treatment plant (stp) (8 mld at sonasavri nallah section) for interception and diversion (i and d) works along with gravity main works project of itarsi town under sbm 2.0.
corrigendum : renovation of the 85 mld capacity sewage treatment plant (stp) in sector 32 kamothe owned by panvel municipal corporation and its operation, maintenance, and repair for the next two years (2nd call) - as per tender
corrigendum : construction of bus stand, workshop ,and e-bus depot nadaun, tehsil nadaun district hamirpur, h.p - part-i-civil work of bus stand , workshop, and e-bus depot i/c bus charging bay and covered parking i.e. building portion i/c ws, si , site development, boundary wall, rain water harvesting tank, septic tank, c/o pavement work, c/o approach road,
design and construction of sewage treatment plant (stp) of 5.0 mld capacity at sindhi nallah section with interception and diversion (i&d) works along with gravity main works of itarsi used water management project under sbm 2.0
corrigendum : engineering procurement and construction (epc) for augmentation of sewage treatment work system at cme khadki- engineering, procurement and construction (epc) for augmentation of sewage treatment work system at cme khadki
corrigendum : nit no. 11(2026-2027) ee(sdw)vi/item no.4 - supply, installation, testing and commissioning of sludge management system at various stps of delhi jal board (sludge district-2, narela stp)
intercepting sewer line, gravity main, treated effluent main, 10.00 mld sewage treatment plant at nagar palika parishad mahoba, district mahoba.
corrigendum : consultancy services for preparation of detailed project report and bid document for integrated waste water management under ruidp phase v (rulip)
construction of sewage trea... - construction of sewage treatment plant of 6.00 mld based on sbr (sequential batch reactor) with tertiary treatment technology including 6 years defect liability cum maintenance period and 3 months trial run period. at sector-7, mdc panchkula
corrigendum : construction of sewage trea... - construction of sewage treatment plant of 6.00 mld based on sbr ( sequential batch reactor) technology
used water management project in municipal council poonch under uwm sbm 2.0 - by way of design and const. of 4.5 mld stp, const. of interception and diversion structures at outfalls, conveying mains, ips incl. o and m for 5 years after successful completion of free trail of 12 months contract no. sdj/w/86/2026-27
corrigendum : construction of 5 mld capacity stp with co treatment units at elamkulam for kochi corporation under amrut 2 0 - design construction and commissioning of 5 mld capacity stp with co treatment based on mbbr technology inclusive of all mechanical and electrical components followed by operation and maintenance o and m for 5 years
corrigendum : provision of deficient married accommodation and provision of sewage treatment plant (stp) at icgs pipavav
construction of a barracks with a capacity for 320 police personnel at the new police lines, commissionerate lucknow (g+5 instead of g+4 in the west).,,construction of a boundary wall at kasturba gandhi balika vidyalaya, kakori, district-lucknow.,,reconstruction of a dilapidated building and construction of a toilet block at sakaran, district-sitapur.,,construction of a septic tank and boundary wall at kasturba gandhi balika vidyalaya, nakaha, district-lakhimpur.,,construction of a guard room, septic tank, and boundary wall at kasturba gandhi balika vidyalaya, phardhan, district-lakhimpur.,,construction of a septic tank and boundary wall at kasturba gandhi balika vidyalaya, mohammadi, district-lakhimpur.,,construction of a septic tank and boundary wall at kasturba gandhi balika vidyalaya, bijua, district-lakhimpur.,,construction of a septic tank and boundary wall at kasturba gandhi balika vidyalaya, nighasan, district-lakhimpur.,,construction of a septic tank and boundary wall at kasturba gandhi balika vidyalaya, bankeganj, district-lakhimpur.,,construction of a septic tank and boundary wall at kasturba gandhi balika vidyalaya, behjam, district-lakhimpur.,,construction of guard rooms and septic tanks across various blocks in district-lakhimpur (dhakhwa, isanagar, kumbhi gola, lakhimpur, mitauli, phoolbehar, ramia behar, pasgawan, and dhaurahra). (hindi documents).
construction of sewage treatment plants (stp) of capacity 3.03 & 3.37 mld at aurad & hallikhed-b ulbs of bidar district, 2.26 & 3.56 mld at yelburga& kustagi ulbs of koppal district along with 5 years operation & maintenance (including 1-year defect liability period) under swachh bharat mission (u)-2.0 fund through design, built, operate and transfer (dbot) model. (package-sbm/klb-pkg-7) call 6
upgradation of stps new intake pipeline corridor road for civil part (phase-i) (capex 2025-26)
corrigendum : provn of package type sewage treatment plant at ins dronacharya, kochi
construction of sewage treatment plant of 10 mld in madanayakanahalli town along with 5 years operation & maintenance (including 1-year defect liability period) under sbm (u)-2.0 fund through design, built, operate and transfer (dbot) model
construction of stps including operation and maintenance in dharmapuri town in jagital district (2nd call)