FILTERS
upgradation of existing pro-control p13 ddc/dcs system at gtps, procurement, installation and commissioning of two nos. vacuum pump with replacement of existing steam jet ejectors at gtps, desilting/cleaning of raw water reservoir compartment no 1 and compartment no2 at pps-iii, bawana, biennial rate contract for the maintenance of electrical system at pps-i, supply installation (retrofitting), testing and commissioning of air circuit along with auto changeover/interlocking scheme of the sa-2 lt (415v) panel board at gtps, delhi,,
View Insights
name of work:- " electrical work of raising of platforms from rl/ll to hl in jbp division (i) raising of 6 nos platform from rl/ll to hl at jukehi (jke),jaitwara (jtw) and tikariya (tkyr) stations (ii) raising of 7 nos platform from rl/ll to hl at aslana (ana), bandakpur (bnu) and ghatera (gea) stations (iii) raising of 7 nos platform from rl/ll to hl at sohagpur(sgp), bohani (bne), bhitoni (bhtn), bheraghat (brgt), amdara(udr), markundi (mkd) and lagargawan (lgce) stations (iv) raising of 6 nos platform from rl/ll to hl at bakhleta (bqq), rethi (rei), narioli (noi), phatharia (pha), sagoni (sao) and bharsendi (bsdl) stations (v) raising of 7 no. platform from rl/ll to hl at gosalpur (gspr), niwar(nwr) and patohan(pthd) station.(vi) raising of 6 nos platform from rl/ll to hl at bagratawa (bgta), guramkhedi (gmd) and ghatpindrai (gpc) stations"
1) renovation and furniture work of ground floor, first floor, second floor, third floor, acs home secretary chamber at first floor of home department, block no.02 at new sachivalay, gandhinagar (including electrification) 2) construction of home guard office at kapadvanj dist.kheda. (inc. ele.) 3) providing, erecting. testing & commissioning of various capacity reverse osmosis and water cooler in various building at bakrol jail, dist:- anand. (from construction of b-36 (p+9), c-12 (p+6), d-02 (gf) with 14' & 18" r.c.c wall) & campus area developing at bakrol district jail. dist.:- anand original work saving
renovation and furniture work of ground, first, second and third floor, acs home secretary chamber at first floor of home departement, block no.-02, new sachivalay, gandhinagar. (including electrification)
manpower outsourcing services - minimum wage - skilled; matriculation sslc plus iti certificate in the trades of electronics mechanic electrician wireman or matriculation sslc plus course completed act apprenticeship in the trade mentioned above or h.. , manpower outsourcing services - minimum wage - unskilled; 10th pass or iti or equivalent or national apprenticeship certificate nac granted by ncvt; others
providing integrated facility management services at main office premises and various colonies of reserve bank of india
corrigendum : annual maintenance contract of traction and psi for 11 stations, one depot and 2 rss of navi mumbai metro line-1 for 3 years extendable up to 1 year
annual maintenance contract of traction & psi for 11 stations, one depot and 2 rss" of navi mumbai metro line-1 for 3 years, extendable up to 1 year
malappuram package no.07 - supply, construction and reconductoring of 11 kv lines using ht abc, along with supply and installation of distribution transformers under dyuthi special scheme - electrical circle manjeri (part ii) - mpm pkg no.07 -supply, construction and reconductoring of 11 kv lines using ht abc,with supply and installation of dtrs for development of distribution infrastructure on a turnkey basis under ds scheme at various locations under ec, manjeri(part-ii)
corrigendum : custom bid for services - supply cum installation of new kiosk-based control and relay panel with automation under add-cap 2024-2029 block at 400220 kv dehgam substation
invites e-tender through e-tendering for providing tentage/electrical arrangement and other goods on requirement basis.
electrical work of rmpus, electrical train lighting (etl) etc. along with work of high- capacity coupler & feeder cables in lhb coaches during mlr schedule.
corrigendum : value based biennial rate contract for hot and cold insulation jobs in all plants at rcf trombay unit - as per nit
work of shifting of electricity lines/electrical systems, which are obstacles in the construction of road widening from pakka pul to sitapur road, within the lucknow nagar transport system.
corrigendum : engineering, supply, erection and commissioning for increasing capacity at 220kv substation hardoi from 02 nos. 160 mva to 03 nos. 160 mva on turnkey basis
a) miscellaneous annual maintenance work of quarters in lieu of zonal work under sse (wks) tna for year 2026-27.b) thane (nsg 1) - renovation of vartak nagar prs building, provision of additional lights, fans & sitting arrangements and provision of cop from main gate to entrance gate of main prs and allied facilities. c)miscellaneous annual maintenance work at station areas, platforms and service building in lieu of zone under sse(w)tna for year 2025-26.
carrying out supply and application of various types of insulation as per standard specs by providing all required materials in connection with the composite work for units (avu unit) part a for panipat refinery expansion project (p25) m/s iocl
carrying out supply and application of various types of insulation as per standard specification by providing all required materials in connectionwith the composite work for units (avu unit) part a for panipat refinery expansion project (p25) m/s iocl.
s&t work in connections with enhancing and strengthening of earthing arrangement & provision of surge protection device for signalling equipment's at stn/ lc/ ibh/ relay hut on jabalpur division of west central railway.
composite work of refurbishment related to civil, electrical, hvac and interior works of canteen at mod labs, north site, barc, trombay, mumbai-400 085.
comprehensive annual maintenance contract of ei system for mtj-awr section (mora, gdo, deeg, bedm, binr, gvh, jbs, rah, otw), agc-udmr section (ssdt, fab, bah) & agc cantt and signalling circuit lsc & auto block section (abn & abs) in mtj-pwl & jab-tdl sections of agra division for a period of three years.
corrigendum : enhancement of 1x10mva, 110/11kv power transformer-3 to 1x20mva, 110/11kv power transformer at 110/11kv hutti sub-station in lingasugur taluk and raichur district on total turnkey basis including supply of all matching materials/ equipments and erection (including dismantling and civil works) of all materials/ equipments, testing and commissioning. call-4
construction of multipurpose hall and sports complex at sariya, including water supply and sanitation facilities, electrification, and approach road works. district sarangarh bilaigarh (deposit work - without escalation and bonus).
dismantling, shifting, reinstallation, testing and commissioning including refurbishment of pbbs at agra airport and its operation and aicmc
new construction of community health center main building,pm room, garrage, cc road, electric works with compound wall at gorevali tal:- bhuj, dist.:- kutch.
supply, installation, testing & commissioning (sitc) works of d.g set at tarsamiya and takhteshwar filter plant & pumping station including all allied electrical and civil works for bhavnagar municipal corporation (bmc), bhavnagar.
outsourcing of maintenance activities of power supply installation (psi) assets over raipur division for 2 years.
ahmedabad division - provision of second feeding arrangement from dfccil to ir tss and provision of circuit breaker in jagudan ssp
corrigendum : provn of 33 kv ug cct no 02 alongwith connected items from ridge valley to khyber sub stn under ge u electric supply delhi cantt-10
construction of divisional joint directorate, treasury, accounts & pension and accounts training institute building including water supply, sanitary fittings & electrification work at district raipur (dn.no. 2, raipur).
renovation / special repair of parade ground with black top work and special repair of existing road with widening including bituminous works at b.s.a.p.-5, patna in the district of patna, construction of fortwall, gallery saluting base, toilet, changing room & green room with furniture and electrificaiton work at b.s.a.p.- 5, patna in the district of patna.
aishbagh-mailani jn.:- provision of hazardous point detection circuit at 16 stations with medha make ei over ljn division.
construction of fortwall, gallery saluting base, toilet, changing room & green room with furniture and electrification work at bsap-05 patna in the district of patna
construction of an additional 100 bedded girls community centre at nadaun district hamirpur part-i civil work - c/o civil work, i.e. (building portion) including ws and si, septic tank and soak pit, rain water harvesting tank, fire fighting tank, site development, boundary wall etc.) part-ii electrical work providing e.i., fire fighting system, fire al
corrigendum : provision of lighting arrangement and seating gallery at parade ground at ins chilka
ajmer division: provision of dual vdu by replacing operating panel at 07 nos. ei stations in (jal-moi) section under the jurisdiction of adste/abr in ajmer division
corrigendum : fabrication, supply, installation, testing and commissioning of 415 v electrical power control centre panels and associated electrical works for alpha waste management for nrg.
refurbishment of civil, electrical and mechanical works for entrance lobby of old and annex building of barc hospital, anushaktinagar, mumbai.
corrigendum : development of white town in puducherry under the challenge based destination development, scheme of government of india. sub work_ electrical works components in the development of white town, puducherry.
construction of opd room, vocational training center, canteen, open air theater, hardcore cell at vadodara central jail vadodara dist vadodara (including electrification) [1st attempt]
retender for comprehensive annual repair maintenance and operation armo (civil electrical horticulture) works for esic medical college and hospital jaipur for one year - comprehensive annual repair maintenance and operation armo civil electrical horticulture works for esic medical college and hospital jaipur for one year the contract shall be extendable further one more year subjective performance of the contractor
tender for c/o 33 kv single circuit line on double pole structures from 132/33 kv s/stn tahliwal to the proposed 2x10 mva, 33/11 kv gis sub station at village pollian to cater additional 20 mva load demand of bulk drug park at village pollian beet
1.signaling arrangements for replacing mushroom boxes with location boxes and shifting of way side electronics in the theft prone moula - ali - ammuguda - sanath nagar (mly - amq - snf) abs section. 2.strengthening of power supply for level crossing gate & intermediate block signalling locations by replacing lmla batteries with vrla batteries.
corrigendum : survey, design, supply, installation, testing and commissioning towers for kavach-ii
corrigendum : construction of ocr complex for ib unit at rupaidiha under sib lucknow including e and m work subwork/packages: main work
work of replacement of existing old/static/obsolete-technology busbar protection schemes at various ehv substations under ehv pc o&m zone nashik
electrical works at canara bank, pune circle office, fp 790 (part), near mangala theatre, shivaji road, shivajinagar, pune (maharashtra)
construction of guest house /inspection bungalow (ib) (g + 2) at 132/33 kv gss naugachia, bhagalpur including construction of road, boundary wall, soil filling in premises of ib, supply of furniture, electrical works including ac provisions and other miscellaneous works.