FILTERS

construction of fp work on l/s of h.m guri nallah at h.m guri at rd 14600-14200 and 12600 mtrs
construction of spurs on right side of veshow nallah between at rd 31200 to 31400 mtrs
rdddc2627104290 -(construction 0f 03 nos borewells at at drabgam a (shadim))
multiple works at naibat office at kb pora
const of flood channel nlo nazirahmdganie , gh hassan wani and others phase 1
repair and renovation of cement concrete drain at kabamarg.
face lifting of raghunath temple to dc office gate via cm house on the eve of darbar move 2026
construction of b/wall along road near h/o. mohammad altaf baniya and others.
construction of additional classroom at ms thalwa w no 07 pyt pernote a block ramban - as per nit
camc of aircon make lift installed at ews girls hostel of gmc jammu for the period of three years
installation of 100 kva transformer yarikha c
major repair at govt. high school bhargi zone gandoh district doda under samagra shiksha 2025-26.
camc of aircon make lift installed at ews boys hostel of gmc jammu for the period of three years
construction of culvert near h/o. mohammad sultan sofi at rabitar ganderbal.
restoration of channel section of marh bagh khul d/s ring road crossing between rd 1400 to 1550m.
face lifting of mia dido chowk to cpo chowk on the eve of darbar move 2026