FILTERS
construction/ repair of lane, drain, iron grating, blacktopping and other allied works in all 13 wards at mc billawar. (under capex budget 2026-27) - please refers to boq
View Insights
construction of chhattisgarh institute of technology (cgit) building i/c water supply, sanitary fittings, septic tank, sump well, bore well, rain water harvesting & electrification work at durg, distt.- durg (c.g.)
construction of internal cement concrete road and drain at village bharaswada, taluka loha, district nanded (under rehabilitation)
b.t. renewal and cement concrete (cc) work, including drain construction, of jora internal road, length 5.57 km (actual length 2.40 km), at raipur. district: raipur (dn. no. 1, raipur).
construction of six nos type three family quarter police state vigilance and anti corruption north range at dharamshala distt. kangra h.p - sh - construction of type 3 family quarter building portion including water supply and sanitary installation, rain water harvesting system and site development
improvement by dbm/bc, construction of drain and slab covering in dalanwala area on model colony to laxmi road and internal roads in rajpur road constituency under state sector.
link road from gref junction to mall road at killar km 0/0 to 2/500 (sh providing and laying interlocking paver block between km 0/860 to 2/410, u-shape drain at rd 1/050 to 1/180 and c/o hume pipe culvert at rd 1/200 and 1/295) under pdna 2025)
1. construction of a new link road (rural road) from colony no. 8 to colony no. 9. 2. construction of a new link road (rural road) from udaykaranpur to the remaining section of teramil nakar. 3. construction of a new link road (rural road) from kesarpur to balliya. 4. construction of a new link road (rural road) from nh-74 (at km 278) to the durga devi shrine in village gaybijh. 5. construction of a new link road (rural road) from kargaina to dinarpur. 6. construction of a new link road (rural road) from madhopur road to mohanpur via kaim. 7. construction of a new link road (rural road) from bankati pandri road to bankati mahof via bithaura khurd. 8. construction of a new link road (rural road) from sadiya mughalpura to bankati pandri. 9. construction of a 2x3m rcc box culvert to replace the damaged culvert at km 2 of the pandri-chaudhakheda road, including approach roads and protective works. 10. construction of a 5x5m rcc box culvert over the bhaisaha pangahli drain (on the chathiya route), including approach roads and additional approach roads. (hindi document)
corrigendum : widening and improvement of road with rcc drain on sh-359 (dhaba-kothurna-betala-khairi section) in km 5/00 to 7/400, taluka and district bhandara.
corrigendum : construction of c.c.drain on sindhapuri lakhandur road sh-354 km 7/800 to 9/800, taluka pauni, district bhandara
construction of lane/drains beautification of lane/drains beautification and protection work in different wards of mc ramnagar - please refer to boq
construction of lanes/drains, and other essential development and allied works in all wards of municipal committee reasi
construction of lanes/ drains/tiled paths/link roads/ p/ bunds and other beautification works from ward no.01-14 at mc sopore.
improvement by bc, drain repair and slab covering on race course road in rajpur road constituency under cm announcement no. 332/2025.
construction of lane/drains, beautification and protection work in different wards of mc surankote district poonch.(under ut capex budget 2026-27 uds) - please refer to boq.
drainage schemes in mc thanamandi under capex budget 2026 27 drainage
lanes drains beautification and protection works in different wards of mc thanamandi under capex budget 2026 27 urif
improvement and construction of cross drainage works / causeways / minor bridges on the road from state highway 193 to bajar bhogaon, kisrul, kaljawade, pombare, kolik, padsali to kanjirda ghat up to district border major district road 19 at km 19/400, taluka panhala, district kolhapur. (part- padsali)
lanes, drains, beautification and protection works in different wards of mc chenani. under urif scheme / capex budget 2026-27 (new works) - refer to boq
new construction work of cc road and drain from pwd road, dohra road via ajit singh's house and shiv mandir to munna kashyap's house to culverts cc road and drain in district bareilly.
corrigendum : reconstruction of pappammal koil drain from main road culvert to confluence point at vaithikuppam road culvert of rajbavan constituency, puducherry.
corrigendum : construction of pudhu nagar drain from viveganandar nagar, 1st main road to ellaipillaichavady junction in puducherry.
construction of internal cement concrete road and cement concrete covered drain at pimpalgaon (nimji) (part-i), village, taluka, district nanded (under rehabilitation).
construction of internal c.c road and c.c coverd drain at pimpalgaon (nimji) (part-2) village tq. dist nanded (under punarvasan)
dev of rds i const of rcc drain in kacharghat, durgapur area under kmc area l0.800 km ii kacharghat to kubjar - noorpur rd l1 km iii rksp l0.500 km iv kk rd to pwd rd via bhagini nivedita govt. girls h.s. school l0.40 km g-iii
a/r and m/o various roads under pwd division south road-1/ sub division sr-13 during 2025-26 and 2026-27. (sh- minor repair of footpath, repair of drain and other miscellaneous works) (balance work).
generalimprovement works to old nh 66 general old nh 66 providing dbm bc works to ch 363 880 to 364 880 brd junction to thangalpadi and drainage works to ch 364 300 to 364 500 general civil work general civil work
construction of 2 nos of 50 kld capacity septic tank for lh 1 to 5 hostels and 1 no of 20 kld septic tank for a and b quarters including sewer lines, gully trap, manholes and soak pit at university of hyderabad, gachibowli, hyderabad.
restoration of rain damages on churwadhar gadol pirag road km 0/0 to 10/750 (sh p/l wbm g-iii and bc , c/o pcc v-shape drain in km 5/00 to 10/750). under pdna 2023
construction of link road nadgadi nallah to mirpora alinbass under road sector - refer to boq
restoration of rain damages on rehari gussan to kathli bharan road km 0/0 to 13/00 (sh p/l wbm g-iii and bc , c/o pcc v-shape drain in km 5/00 to 9/00). under pdna 2023.
comprehensive repair and maintenance to various roads under division ser-2, pwd during 2026-27 (sh-repair of damaged drain and making bell mouth connection for smooth flow of storm water for roads in jasola vihar under ser-22).
development of road from nh08 at cti camp to nh08 at bsf gate no 2 (l_3point70 km) _sh_patch wbm, patch soiling, pot holes repair, carpeting, drain, paver block and other allied works (project code _p_369)
a/r and m/o maintenance and repair work at mandoli jail complex delhi-110093 dg 2026-27 - sh repairing of damaged/broken sanitary lines/ drainage pipes and renovation of toilets/bathrooms and other misc. civil works of central jail no. 11,14 and15 at mandoli jail complex.
a/r and m/o maintenance and repair work at mandoli jail complex delhi-110093 dg 2026-27 - sh repairing of damaged/broken sanitary lines/ drainage pipes and renovation of toilets/bathrooms and other misc. civil works of central jail no. 12,13 and 16 at mandoli jail complex.
development of road from sinni club to purathal (l_2point70 km)_sh_patch wbm, patch soling, pot holes repair, carpeting, drain, protection work, paver block, palasiding and other allied works (project code_p_370)
c/o admin block i/c e-learning (g plus 5), training block & auditorium (double height), officers hostel i/c shopping centre (g plus 7), type-iii-10 nos. (g plus 4), type-iv/05 nos. & type-iv(s)/1 no. (g plus 2) and type-v/1 nos. (g plus 1) quarters including internal water supply, sanitary installation, drainage, road work, internal ei, compound lighting, sub-station, dg set, fire fighting, addressable automatic fire alarm system, lifts, emergency lighting system, ibms system, epabx & lan system, conferencing system, ups system, solar pv system and development at site for central detective training institute at sector 88, mohali (punjab) (sh: sitc of active video wall)
restoration of damage on kuther ot saila road km 0/0 to 3/720 - const of 900 mm dia hume pipe culvert at rd 3/225 alongwith wing wall at rd 1/795 to 1/800 cc pavement , pcc drain p/l g-iii and bitumen macadam bituminous concrete in km 0/0 to 3/720
restoration of rain damages on rehari gussan to kathli bharan road km 0/0 to 13/00 (sh p/l wbm g-iii and bc , c/o pcc v-shape drain in km 9/00 to 13/00). under pdna 2023.
construction including metalling and blacktopping of internal link road at lew rim puriang total length=0.398.km nature of work- earthwork, mbt works, protection works and drainage works.
budget work 2019-20 -balance work for improvements and providing bm bc to kondayur road km 0/000 to 2/700 in chelakkara lac - budget work 2019-20- general civil work-1 - balance estimate included bc for 2.70km construction of r/w with concrete dr masonry construction of drain, irish drain roads safety items etc provision for shifting utilities lump sum amount for unforeseen items are not included in this estimate
construction of internal c.c. road and c.c. covered drain at pimpalgaon ( ni ) village tq and dist. nanded - under punarvasan- 2026-27
construction of c.c. road and c.c. drain in bannikuppe, lakkappanahalli, jakkanahalli, and lakkojanahalli villages coming under the jurisdiction of bannikuppe gram panchayat, kailancha hobli, ramanagara taluk.
construction of c.c. road and c.c. drain in hebbakodi, thammanayakanahalli, and hunasanahalli villages coming under the jurisdiction of hunasanahalli gram panchayat, ramanagara taluk.
construction of internal c.c. road and c.c. covered drain at trikut village tq and dist. nanded - under punarvasan- 2026-27
development of madhupur pathariaduar road (l _2point50 km)_sh_patch wbm, patch soling, pot holes repair, carpeting, drain, protection work, paver block, palasiding and other allied works (project code_p_370)
construction of health sub center building at kandor tehsil fatehpur distt. kangra hp - sh construction of building portion water supply and sanitary installation septic tank rain water harvesting tank and soak pit
corrigendum : construction work of road and drain from kapuri thakur ward mohalla subedar ka purva to dabhasemar patli pul, passing through the houses of sudarshan kori, abhishek shukla, umashankar shukla, and extending to the house of rajendra prajapati.
corrigendum : construction of 50 mtr. span steel foot bridge over neeru nallah at new basti dradhu tehsil bhaderwah district doda.
construction of sewerage treatment plant in 50 bedded hospital at saraswati