FILTERS
supply of al-59 (37/3.40 & 61/3.50) conductors on returnable steel drums
View Insights
corrigendum : construction of uni-directional twin tunnels including approach roads across fotu la pass on nh-01 (leh-kargil highway) in the union territory of ladakh
improvement of morth identified blackspots through construction of grade separators at selected locations along nh 75 corridor bw km.216.91 to km.302.42 with an effective improvement length 25.6 km under nh(o) on epc mode in the state of karnataka
corrigendum : construction of iconic hybrid cable stayed and suspension bridge across krishna river on nh -167k (design chainage km 87.360 to km 88.437) in the states of telangana and andhra pradesh on engineering, procurement and construction (epc) basis
supply of piling, civil, structural and sheeting work for ancillary buildings and plant bop facilities
development of 4/6 lane green field bypass for etmadpur and tundla town on section of agra etawah nh 19 from design km. 0.000 to km. 16.200 in the state of uttar pradesh on epc mode.
design, engineering, supply, erection, testing and commissioning of 2x500 mva, 2x100mva 400/200/33kv ais sub-station with sas at unchaballi with associated 400 kv d/c lilo line from 400kv kaniha-bisra d/c line (ckt-i & ii) to proposed 400/220/33kv gss at unchaballi, 110 lilo in d/c from ttps-joda line to proposed s/s at unchaballi, 220kv d/c line 220/132/33kv gss, turmunga to proposed 400/220/33kv grid s/s at unchaballi with bay extensions at turumunga on epc contract basis.
corrigendum : development, operation and maintenance of the multi modal logistic hub project (imlh) at nangal choudhary (district mahendragarh) in the state of haryana through public private partnership on dbfot basis
corrigendum : construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
corrigendum : 4l of kolhapur sangli sec of nh166 from sangli phata km 0.00 to chokak km 7.738 n chokak km 145.300 to ankali km171.171 length33.609 km in maharashtra to be executed on hybrid annuity mode under nh o
corrigendum : upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
south central railway (construction organization) : engineering, procurement and construction (epc) contract agreement for "construction of new bg railway line between chainage 114.400 km and chainage 146.180 km (i.e., 31.78 km) between pro. sircilla (excl.) - pro. vemulawada (incl.) - pro. kothapalli (excl.) stations of manoharabad - kothapalli section of hyderabad division, in the state of telangana"
work for 400kv quad moose double circuit transmission line on double circuit & multi circuit towers from the existing 400/220kv pandiabil (pgcil) grid substation to proposed 400/220/33kv grid substation at tssez, gopalpur (approx - 157.363 km).
corrigendum : providing mep like high side electrical, hvac, fire protection system, lifts, fire alarm and public address system and plumbing works in integrated andhra pradesh state secretariat and hod offices (towers 1 and 2) in amaravati government complex, andhra pradesh
corrigendum : development of yuge yugeen bharat museum (yybm), new delhi - package -1. (sh: ticketing plaza, service tunnel, facade & courtyard works, lifts, mep services and equipment) subwork/packages: ticketing plaza, service tunnel, facade & courtyard works, lifts, mep services and equipment
construction of new double line between new palghar & vadhavan port (varor station) including electrification works in mumbai division of western railway
corrigendum : ms/wk/954 - development, operation and maintenance of berth no. 15 and 16 for handling multipurpose cargo (clean cargo) and containers at kandla on dbfot basis under ppp mode
providing facade works like glass, cladding, crown, atrium, canopy skylight, column cladding, pv panel and bmu works in integrated andhra pradesh state secretariat and hod offices (tower 3and4) in amaravati government complex, andhra pradesh on lump sum contract (percentage tender)
procurement of 30.8 million sheets of icao compliant electronic contactless inlays (in 2 ups) along with its operating system for indian e-passport booklets
procurement of 30.8 million sheets of icao compliant electronic contactless inlays, in 2 ups, along with its operating system for indian e-passport booklets
construction of 200 mld stp and 150 mld tertiary treatment plant alongwith treated water distribution network upto narol industries and other associated works at old pirana, ahmedabad, gujarat
corrigendum : selection of consultant for preparation of detailed project report for the preparation of detailed project report (dpr) for extension, renovation and modernisation (erm) of salaulim irrigation project (sip) in sanguem taluka, goa
upgradation of the missing link of the amritsar jamnagar economic corridor between maliya and pipaliya section of nh151a (length 24.2 km) in the state of gujarat on epc.
corrigendum : construction of 03 nos. of 3 lane robs and 07 no of vups on 6l delhi agra section old nh-2 (new nh 44 and 19) from km. 20.500 to km. 200.000 in the state of haryana and uttar pradesh on epc mode.
corrigendum : procurement of dc (1.8 kv), lv (up to 3.3 kv), mv (above 3.3 kv up to 33 kv) cables for ists/ insts connected re power projects at various locations across india
corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h- beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
engineering, procurement and construction (epc) contract for construction of pumping station at wadhwan bhogavo ii reservoir and supplying and laying of twin ms pipeline of 3200 mm dia. id and plate thickness of 18.5 mm from pumping station to link-4 package-1 approach channel (22.074 km length) with all allied works etc. complete including operation and maintenance of the commissioned project for 10 years.
sauni yojana additional link 2&4 engineering, procurement and construction (epc) contract for construction of pumping station at wadhwan bhogavo ii reservoir and supplying and laying of twin ms pipeline of 3200 mm dia. (id) and plate thickness of 18.5 mm from pumping station to link-4 package-1 approach channel (22.074 km length) with all allied works etc. complete including operation and maintenance of the commissioned project for 10 years
corrigendum : providing mep like high side electrical, hvac, fire protection system, lifts, fire alarm and public address system and plumbing works in integrated andhra pradesh state secretariat and hod offices (towers 3 and 4) in amaravati government complex, andhra pradesh
corrigendum : bw cons. 4lane gf dake from jalandhar moga road (nh703) to jalandhar-kapurthala road (nh703a) (km 303.900 to 319.400) and jalandhar moga road (nh703) to kapurthala sultanpur lodhi road (nh703a) (km 0 to 24.000) in punjab (p10)
engineering, procurement and construction (epc) tender for"construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, lc work and other miscellaneous works for 25t indian railway standard loading from raxaul (excl.) to narkatiaganj (excl.) (i.e. ch.189.400 to 227.200) (total- 37.80 km) in connection with doubling of raxaul - narkatiaganj section in samastipur division of east central railway"
corrigendum : construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
corrigendum : lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k
appointment of pgms agency for providing project general management services for chief administrative officer (construction), south coast railway, visakhapatnam, a.p.
corrigendum : development of the bus terminal alongwith commercial facilities at karnal (balari bye-pass)
corrigendum : rectification of 25 no of accident spots blackspots in karur dindigul madurai kayathar sec of nh44 chettikulam natham sec of nh785 and const of combined office building for ro n piu madurai in tamil nadu on epc mode
balance works of 4 lane bangalore chennai expressway from arakkonam to kancheepuram (km 204.500 to km 230.000) (phase iii/package iii) in tamil nadu on epc mode.
corrigendum : mass production mining technology services - per metric tonne basis - under ground mining; introduction of any mass production technology like deployment of standard height continuous miner package on hiring basis and or any other suitable technology..
corrigendum : construction of 4 lane access controlled bypass to tiruvannamalai town starting from design km 75.150 of new nh38 and ending at design km 88.030 of new nh38 (design length 22.710km) in the state of tamil nadu on epc mode
independent engineer services during tolling, operation, maintenance and transfer of lucknow ayodhya section (from existing km 15.400 to existing km 137.970) section of nh-28 (new nh27) in the state of uttar pradesh.
corrigendum : development of satellite township phase-l, package 2 (group housing 01) including allied works at rakh gund aksha, bemina, srinagar (j and k) on design, engineering, procurement and construction basis with operation and maintenance of 2 years
construction of 3rd line work including earthwork, blanketing, minor bridges, major bridges, lc work and other miscellaneous works for 25.0t and dfc feeder route of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of chandil- madhukunda section in adra division of south eastern railway on engineering, procurement & construction (epc) mode.
corrigendum : work for construction of water treatment plants cwrs and cwphs near wtps clear water transmission main from wtp various ipss laying of rising mains to different esrs construction of esrs distribution system in villages providing fhtcs including
new broad gauge single line of railway project comprising the section commencing from paradol takeoff point (km 947.257) to nagpur road station ( connecting point-km:964.820) and slewing of existing boridand-chirmiri line from km:946.640 to km: 947.257 in the state of chhattisgarh in the south east central railway zone in epc mode.
corrigendum : development, operation and maintenance of ims project at dewas gate on dbfot mode in the state of madhya pradesh
corrigendum : widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 68.600 to km. 162.700 and km. 178.400 to km. 183.732 of nh-326 in the state of odisha under epc mode (package-1)
corrigendum : sewerage projects in 44 ulbs under sbm 2.0 under the jurisdiction of sangareddy, rangareddy, nizamabad and mahabubnagar ph divisions (package-iii) under ls contract system with hybrid annuity model
corrigendum : ground remediation, post geotechnical investigations and associated works under idct 2a and 2b, sreh, hot water tunnel, turbine island structures, common areas and miscellaneous structures of ghavp-1-2 at village-gorakhpur, distt-fatehabad, haryana.