FILTERS
corrigendum : construction of 4l of ujjain jhalawar sec of nh 552g from ch.86.500 aakli kadiya to ch.159.263 jhalawar (jn with nh52) pkg 2 in the state of madhya pradesh and rajasthan on epc mode under nh(o).
View Insights
corrigendum : consultancy services for ae for supervision of construction of 4-lanning of ujjain-jhalawar section of nh-552g from ch.86.500 village aakli-kadiya to ch.159.263 jhalawar (junction with nh52) (package-2) in madhya pradesh and rajasthan epc nh(o).
corrigendum : rfp for procurement, supply, operation and maintenance of 1225 electric buses under gross cost contract model
construction of radial road 2 from hyderabad outer ring road at kothwalguda (budwel) to nh 167n near nacharam package 1 budwel to shabad (km 0+00 to 29+50 km)
rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.
corrigendum : work for construction of intake well inside chambal river including approach bridge construction of rwr including all works required for inlet inside rwr outlet system from rwr to outlet chamber wtp cwr rwph and allied works package 1 under jjm
corrigendum : work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm
corrigendum : construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
1) design and construction of elevated viaduct and 11 elevated stations (including architectural finishing) viz. b2 bypass circle, durgapura, gopalpura, gandhinagar, nehru place, ram bagh circle, narayan circle, sms hospital, ashok marg, government hostel and khasa kothi (phase-ii), architectural finishing works of 10 stations viz. prahladpura, manpura, bilwa kalan, bilwa, goner mod, sitapura, jecc, kumbha marg, haldighati gate and pinjrapole gaushala; modification of part operational corridor of phase-1 and constructing khasa kothi (phase-1) station under jaipur metro phase- ii mrts, 2) design and construction of elevated viaduct and 12 elevated stations (including architectural finishing) viz. collectorate, panipech, ambabari, chomu puliya, vidhya nagar sec-2, vidhya nagar, vki road no 5, vki road no 9, vki road no. 14, harmada, harmada ghati & todi mod under jaipur metro phase- ii mrts.
corrigendum : handling ,transport and other mining services - percentage quote based - ob removal, ob removal for a quantity of 96990600 bcm for a period of 1217 days at dudhichua project
corrigendum : tn/stps-sc/2026-27/323(fuel) - supply of 12.5 lakh mt domestic coal for suratgarh thermal power station
corrigendum : development/upgradation of existing 4 lane to 6 lane of lucknow sitapur section km 412.745 to km 479.327 (length 66.582 km) of new nh30 in the state of uttar pradesh on bot (toll) mode
engineering, procurement and construction (epc) contract for quadrupling (laying of new 3rd & 4th lines) of tracks between sulehali west and kurugunta (kqt) stations including electricfication and signalling &telecommunication works in connection with wadi-secunderabad quadrupling project in the state of karnataka.
corrigendum : design, manufacture, supply, testing & commissioning of 27 nos. of high output tamping cum stabilizing machine (hot&s-3x) along with training of indian railway personnel and 3 years post warranty amc
construction of new railway bg line in km 28/970 to 42/040 in between kulthana including and rajpura stations including earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge ( 03 nos) in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
public health and municipalengineering department-urban infrastructure-proiding of roads.central medians.street lighting.parks and other developmental works in various urban local bodies under public health circles of andhra pradesh state under hybrid annuity model(ham)
pre-bid assistance for preparation of priced boq for the tender- construction of new railway bg line in km 28.970 to 42.040 in between kulthana station (including) and rajpura station (including) earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge (03 nos) including electrification in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
construction of gpra at amaravati, the new capital city of andhra pradesh. sh: planning, designing and construction of 1504 residential quarters comprising 600 type-ii quarters in 3 towers ( g plus 24 each), 600 type-iii quarters in 3 towers ( g plus 24 each), 228 type-iv quarters in 3 tower ( g plus 18 each), 56 type-v quarters in 1 tower ( g plus 13) and 20 type-vi quarters in 1 tower ( g plus 9), with a common double basement, ancillary building ( g plus 4), boundary wall, entrance gate complex, electrical substations, underground water sump with pump room, sewage treatment plant and all associated civil, electrical, mechanical, horticulture and development works and services, complete on engineering, procurement and construction (epc) mode-i. subwork/packages: package
corrigendum : handling ,transport and other mining services - percentage quote based - ob removal, ob removal of 98.31 mbcm at bina project for a period of 05 years.
development of 50 mld sea water reverse osmosis (swro) desalination plant on hybrid annuity model (ham) in dsir, dholera
request for qualification and request for proposal for development of 50 mld sea water reverse osmosis (swro) desalination plant on hybrid annuity model (ham) in dsir, dholera
construction of radial road2 from orr at kothwalguda budwel to nh167n near nacharam package 3 gudur to nacharam ch km 56+50 to km 81+15
construction of radial road2 (rr 2) from orr at kothwalguda (budwel) to nh167n near nacharam package 2 shabad to gudur (km29+50 to km56+50)
corrigendum : balance work of six laning of kagal satara section of nh 48 (old nh 4) package i from km 592.500 to km 658.000 in the state of maharashtra to be executed on epc mode under bharatmala pariyojana
corrigendum : construction of 6-lane elevated corridor from maduravoyal junction (chainage km 13.965) chennai outer ring road (chainage km 22.100) including junction improvements at km. 22.368 of nh-48 (old nh4) in tamil nadu on hybrid annuity mode (project length-8.135 kms
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
supply, erection, testing and commissioning of traction and power supply along the alignment for complete corridor 2 and corridor 4 of bstp
corrigendum : rehabilit shoulders from km 178.500 tation and up-gradation of nehru nagar to kothagudem section to two lane/four lane with pavedo km 230.580 of nh-930p in the state of telangana on epc basis
corrigendum : construction of viaducts at 12 locations cut and cover tunnel at 02 locations and pedestrian underpass (pup) at 01 location from km 517.250 to km 547.080 section of new nh-66 (old nh-47) in the state of kerala on epc mode
development of satellite township phase-l, package 3 (group housing 02) including allied works at rakh gund aksha, bemina, srinagar (j and k) on design, engineering, procurement and construction (epc) basis with operation and maintenance of 2 years.
corrigendum : development of satellite township phase-l, package 3 (group housing 02) including allied works at rakh gund aksha, bemina, srinagar (j and k) on design, engineering, procurement and construction (epc) basis with operation and maintenance of 2 years
corrigendum : project management consultancy services for construction of new integrated terminal building and allied works including extension of apron at srinagar airport (2nd call)
providing facade works like glass, cladding, crown, atrium, canopy skylight, column cladding, pv panel and bmu works in integrated andhra pradesh state secretariat and hod offices (tower 1and2) in amaravati government complex, andhra pradesh on lump sum contract (percentage tender)
corrigendum : construction of ratan tata udyog bhavan midc (hq) along with printing press building for maharashtra industrial development corporation on engineering procurement and construction (epc) mode.
consultancy services for authoritys engineer for supervision of construction of intermediate lane of pango to jorging road from design km 40+000 to design km 82+060 section of frontier highway (nh-913) (design length: 42.06 km, package-ii, greenfield alignment) in the state of arunachal pradesh on epc mode.
upgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode
construction of 4.97 km elevated viaduct from koteshwar road dead end to start of ramp of underground section, including 4 nos. elevated stations viz. ashram road, koteshwar prachin mandir, sabarmati river, sardar nagar and design, construction and completion of 1.01 km of underground section comprising of twin cut & cover tunnel between ramp to dead end, including ramp and 01 no. underground metro station for ahmedabad metro rail project, phase-2a
corrigendum : rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
corrigendum : cs for ae for balance work for construction of 8lane access controlled expressway from km 128.0 to km 154.6 of vadodara mumbai expressway karvad to jujuwa section in gujarat pkg ix
upgradation from 2-lane ps to 4-lane ps of bagdogra panitanki kharibari galgalia section of nh-327 in the state of west bengal on ham mode under nh(o)
corrigendum : construction of additional major bridge and its approaches across river teesta (at sevoke) starting around km 591.310 of nh-10 (old nh-31) in the district of darjeeling west bengal on epc mode under nh(o)
construction of additional major bridge and its approaches across river teesta (at sevoke) starting around km 591.310 of nh-10 (old nh-31) in the district of darjeeling, west bengal on epc mode under nh(o)
six laning of gandhidham (kandla) mundra port from km 0/000 to km 71/400 (length 71.40 km) section of nh41 in the state of gujarat on epc.
development, operation & maintenance of berth no. 15 & 16 for handling multipurpose cargo (clean cargo) and containers at kandla on dbfot basis under ppp mode
corrigendum : request for proposal for operation and maintenance of shree sheetla mata devi 150 seats medical college and 883 bedded teaching hospital at sector-102, gurugram on ppp mode
working survey, design & construction of intake well with approach bridge, providing, supplying, lowering, laying and jointing various dia. of di-k9/ms rising main pipelines, rcc sump, pump house, staff quarter, compound wall, supplying and erecting pumping machinery including all electro-mechnical-instrumentation and scada works at various hws to shws under water supply scheme based on bhadbhut barrage (rhs) for industries (gidc) and rural areas of bharuch and vadodara districts with 10 years of comprehensive o&m of entire scope of work. dist.: bharuch
purchase of al-59 (37/3.40 & 61/3.50) conductors on returnable steel drums as per specifications for project & r&m works for f.y. 2026-27 against tender no. ace(p&c)/se(p&c)/ee(proc)/i/e-3117/al-59 conductor/2026-27